Full Text
REGD. No. D. L.-33004/99
The Gazette of India
CG-DL-E-14062024-254705
EXTRAORDINARY
PART II—Section 3—Sub-section (ii)
PUBLISHED BY AUTHORITY
No. 2178]
NEW DELHI, FRIDAY, JUNE 14, 2024
MINISTRY OF POWER
NOTIFICATION
New Delhi, the 13th June, 2024
S.O. 2296(E).—In exercise of the powers conferred by sub-para 3.2 of Para 3 of the Guidelines circulated
under Section 63 of the Electricity Act, 2003 (No. 36 of 2003), the Central Government, on the recommendations of
19th meeting of National Committee on Transmission, hereby notifies the following transmission schemes under
TBCB mode, with details of respective Bid-Process Coordinators (BPCs): -
Sl. Name & Scope of the Transmission Scheme
No.
1. Transmission system for evacuation of power from Rajasthan REZ Ph-IV (Part-4 :3.5 GW): Part A
Tentative implementation time-frame: 24 months from the date of SPV Transfer
BPC: REC Power Development and Consultancy Limited
Scope:
+-------+-------------------------------------------------------------+-----------------------------------------------------+
| Sl. No. | Scope of the Transmission Scheme | Capacity (MVA) / Route Length (Km) |
+=======+=============================================================+=====================================================+
| 1. | Augmentation with 765/400 kV, 2x1500 | • 765/400 kV 1500 MVA ICTs- 2 Nos. |
| | MVA Transformer (4th& 5th) at Barmer-I PS | • 765 kV ICT bays-2 Nos. |
| | | • 400 kV ICT bays- 2 Nos. |
+-------+-------------------------------------------------------------+-----------------------------------------------------+
| 2. | Augmentation of 5x500 MVA (5th to 9th), | • 400/220 kV 500 MVA ICTs- 5 Nos. |
| | 400/220 kV ICTs at Barmer-I PS | • 400 kV ICT bays-5 Nos. |
| | | • 220 kV ICT bays- 5 Nos. |
+-------+-------------------------------------------------------------+-----------------------------------------------------+
| 3. | 220 kV line bays (6 Nos.) for RE connectivity | • 220 kV line bays- 6 Nos. |
| | at Barmer-I PS | |
+-------+-------------------------------------------------------------+-----------------------------------------------------+
| 4. | 400 kV Sectionalizer bay (1 set), 220kV | • 400 kV Sectionalier bay: 1 set |
| | Sectionalizer bay (1 set) along with 220kV BC | • 220 kV Sectionalizer bay: 1 set |
| | (1 Nos.) and 220 kV TBC (1 Nos.) at Barmer- | • 220 kV BC (1 Nos.) bay and 220 kV TBC (1) |
| | I PS | Nos.) bay |
+-------+-------------------------------------------------------------+-----------------------------------------------------+
| 5. | STATCOM (2x+300MVAr) along with MSC | • STATCOM (2x+300MVAr) MSC (4x125 |
| | (4x125 MVAr) & MSR (2x125 MVAr) along | MVAr) & MSR (2x125 MVAr) |
| | with 2 Nos. 400 kV bays at Barmer-I PS | • 400kV bays at Barmer-I PS – 2 Nos. |
+-------+-------------------------------------------------------------+-----------------------------------------------------+
| 6. | Fatehgarh-IV PS (Sec-2) – Barmer-I PS | • Line Length ~45 km (Quad) |
| | 400kV D/c line (Quad) | • 400 kV line bays at Fatehgarh-IV PS (Sec-2) – 2 |
| | | Nos. |
| | | • 400 kV line bays at Barmer-I PS – 2 Nos. |
+-------+-------------------------------------------------------------+-----------------------------------------------------+
| 7. | Establishment of 765/400kV, 2x1500 MVA | Ghiror S/s- AIS |
| | S/s at suitable location near Ghiror (Distt. | • 765/400 kV 1500 MVA ICTs- 2 Nos. (7x500 MVA |
| | Mainpuri) along with 2x240 MVAr (765kV) | including one spare unit) |
| | & 2x125 MVAr (420kV) bus reactor at Ghiror | • 765 kV ICT bays-2 Nos. |
| | S/s (UP) | • 400 kV ICT bays- 2 Nos. |
| | | • 765kV line bays: 8 Nos. (for LILO of Aligarh |
| | Future provisions at Ghiror S/s: | (PG)-Orai (PG) D/c, LILO of Agra (PG) |
| | Space for | Fatehpur (PG) S/c & 765 kV interconnection with |
| | • 765/400kV ICTs along with bays- 4 | Dausa S/s) |
| | • 765 kV line bays along with switchable line | • 400 kV line bays: 2 Nos. (for 400 kV |
| | reactors - 6 | interconnection with Firozabad (UPPTCL) S/s) |
| | • 765kV Bus Reactor along with bay: 1 No. | • 240 MVAr Bus Reactor-2 Nos. (7x80 MVAr, |
| | • 400 kV line bays along with switchable line | including one spare unit) |
| | reactor -6 | • 765 kV Bus reactor bays-2 Nos. |
| | • 400 kV Bus Reactor along with bays: 1 No. | • 125 MVAr Bus Reactor-2 Nos. |
| | • 400kV Sectionalizer bay: 1 set | • 400 kV Bus reactor bays- 2 Nos. |
| | • 400/220kV ICT along with bays -4 Nos. | • 110 MVAr spare reactor unit (single phase)-1 No. |
| | • 220 kV line bays for drawl -6 Nos. | |
| | • 220kV Sectionalizer bay: 1 set | |
| | • 220 kV BC (2 Nos.) bays and 220 kV TBC | |
| | (2 Nos.) bays | |
| | • STATCOM (2x+300MVAr, 4x125MVAr | |
| | MSC, 2x125MVAr MSR) along with 400kV | |
| | bays (2 Nos.) | |
+-------+-------------------------------------------------------------+-----------------------------------------------------+
| 8. | Dausa - Ghiror 765 kV D/c line along with | Line Length -305 km |
| | 330MVAr switchable line reactor at Ghiror | • 765 kV, 240 MVAr switchable line reactors at |
| | end and 240 MVAr switchable line reactor at | Dausa S/s end- 2 Nos. |
| | Dausa end for each circuit of Dausa - Ghiror | • 765 kV, 330 MVAr switchable line reactors at |
| | 765 kV D/c line | Ghiror S/s S/s end- 2 Nos. |
| | | • Switching equipment for 765kV, 240 MVAr |
| | | switchable line reactors at Dausa S/s end – 2 Nos.|
| | | • Switching equipment for 765 kV, 330 MVAr |
| | | switchable line reactors at Ghiror S/s end - 2 Nos.|
+-------+-------------------------------------------------------------+-----------------------------------------------------+
| 9. | LILO of both ckt of 765 kV Aligarh (PG) - | Length -15 km (LILO length) |
| | Orai (PG) D/c line at Ghiror S/s along with | • 765 kV, 240 MVAr switchable line reactors at |
| | 240 MVAr switchable line reactor for each | Ghiror S/s end- 2 Nos. |
| | circuit at Ghiror S/s end of 765 kV Ghiror - | • Switching equipment for 765 kV, 240 MVAr |
| | Orai (PG) D/c line | switchable line reactors at Ghiror S/s end - 2 Nos.|
+-------+-------------------------------------------------------------+-----------------------------------------------------+
| 10. | LILO of one ckt of 765kV Agra (PG) - | Length -30 km (LILO length) |
| | Fatehpur (PG) 2xS/c line at Ghiror along with | • 765 kV, 240 MVAr switchable line reactors at |
| | 240 MVAr switchable line reactor at Ghiror | Ghiror S/s end- 1 No. |
| | end of 765 kV Ghiror -Fatehpur (PG) line | • Switching equipment for 765kV, 240 MVAr |
| | | switchable line reactor at Ghiror S/s end - 1 No. |
+-------+-------------------------------------------------------------+-----------------------------------------------------+
| 11. | 400kV Ghiror-Firozabad (UPPTCL) D/c line | Line Length ~50 km (Quad) |
| | (Quad) | |
+-------+-------------------------------------------------------------+-----------------------------------------------------+
| 12. | 2 Nos. 765kV line bays at Dausa S/s | 765 kV line bays at Dausa S/s – 2 Nos. |
+-------+-------------------------------------------------------------+-----------------------------------------------------+
| 13. | 2 Nos. 400 kV line bays at Firozabad | 400 kV line bays at Firozabad (UPPTCL) S/s - 2 |
| | (UPPTCL) S/s | Nos. |
+-------+-------------------------------------------------------------+-----------------------------------------------------+
Note:
• The line lengths mentioned above are approximate as the exact length shall be obtained after
the detailed survey
• Developer of Fatehgarh-IV PS (Sec-2) &Barmer-I PS shall provide space for 2 Nos. of 400
kV line bays each at Fatehgarh-IV PS (Sec-2) &Barmer-I PS
• Developer of Barmer-I PS shall provide space for 765/400 kV ICTs(2x1500 MVA), 400/220
kV ICTs (5x500 MVA), 220 kV line bays(6 Nos.), 400 kV Sectionalizer bay (1 set), 220 kV
Sectionalizer bay (1 set), 220kV BC (1 Nos.), 220 kV TBC (1 Nos.), STATCOM &
associated 2 Nos. of 400 kV bays at Barmer-I PS
• UPPTCL shall provide space for 2 Nos. of 400 kV line bays at Firozabad S/s
• POWERGRID shall provide space for 2 Nos. of 765 kV line bays at Dausa S/s along with
space for 2 Nos. of 240 MVAR switchable line reactors.
Transmission system for evacuation of power from Rajasthan REZ Ph-IV (Part-4: 3.5 GW): Part B
2. Tentative Implementation Time: 24 months from the date of SPV transfer
BPC: REC Power Development and Consultancy Limited
Scope:
+-------+----------------------------------------------------------+-----------------------------------------------------+
| Sl. No. | Scope of the Transmission Scheme | Capacity (MVA)/ Route Length (Km) |
+=======+==========================================================+=====================================================+
| 1. | Establishment of 765/400 kV, 2x1500 MVA | Merta-II S/s -AIS |
| | S/s at suitable location near Merta (Merta-II | • 765/400 kV 1500 MVA ICTs- 2 Nos. (7x500 |
| | Substation) along with 2x240 MVAr (765 | MVA including one spare unit) |
| | kV) & 2x125 MVAr (420 kV) bus reactor at | • 400/220 kV 500 MVA ICTs -2 Nos. |
| | Merta-II S/s | • 765 kV ICT bays-2 Nos. |
| | | |
| | Future provisions at Merta-II S/s: | • 400 kV ICT bays- 4 Nos. |
| | Space for | • 220 kV ICT bays- 2 Nos. |
| | • 765/400kV ICTs along with bays- 4 | • 765kV line bays: 4 Nos. (for 765kV |
| | • 765 kV line bays along with switchable | interconnection with Dausa S/s & Barmer-I PS) |
| | line reactors - 8 | • 400 kV line bays: 2 Nos. (for 400 kV |
| | • 765kV Bus Reactor along with bay: 1 | interconnection with Beawar S/s) |
| | Nos. | • 240 MVAr Bus Reactor-2 Nos. (7x80 MVAr, |
| | • 400 kV line bays along with switchable | including one spare unit) |
| | line reactor -8 Nos. | • 765 kV Bus reactor bays-2 Nos. |
| | • 400 kV line bays – 2 Nos. | • 125 MVAr Bus Reactor-2 Nos. |
| | • 400 kV Bus Reactor along with bays: 1 | • 400 kV Bus reactor bays- 2 Nos. |
| | No. | • 220 kV line bays: 3 Nos. (for RE connectivity) |
| | • 400kV Sectionalizer bay: 2 sets | • 220 kV BC (1 No.) bay and 220 kV TBC (1 No.) |
| | • 400/220kV ICTs along with bays -4 Nos. | bay |
| | • 220 kV line bays for RE injection -5 Nos. | • 110 MVAr spare reactor unit (single phase)-1 |
| | • 220 kV Sectionalizer bay: 2 set | No. |
| | • 220 kV BC (2 Nos.) bays and 220 kV | |
| | TBC (2 Nos.) bays | |
| | • STATCOM (2x+300MVAr, 4x125MVAr | |
| | MSC, 2x125MVAr MSR) along with | |
| | 400kV bays (2 Nos.) | |
+-------+----------------------------------------------------------+-----------------------------------------------------+
| 2. | Barmer-I PS - Merta-II 765 kV D/c line along | Line Length -345 km |
| | with 330 MVAr switchable line reactor for | • 765 kV, 330 MVAr switchable line reactors at |
| | each circuit at each end of Barmer-I PS - | Barmer-I PS end- 2 Nos. |
| | Merta-II 765 kV D/c line | • 765 kV, 330 MVAr switchable line reactors at |
| | | Merta-II S/s end- 2 Nos. |
| | | • Switching equipment for 765 kV, 330 MVAr |
| | | switchable line reactors at Barmer-I PS end – 2 |
| | | Nos. |
| | | • Switching equipment for 765 kV, 330 MVAr |
| | | switchable line reactors at Merta-II S/s end – 2 |
| | | Nos. |
| | | • 110 MVAr spare reactor unit at Barmer-I PS |
| | | (single phase)-1 No. |
+-------+----------------------------------------------------------+-----------------------------------------------------+
| 3. | Merta-II - Beawar 400 kV D/c line (Quad) | Line Length ~55 km (Quad) |
+-------+----------------------------------------------------------+-----------------------------------------------------+
| 4. | Merta-II - Dausa 765 kV D/c line along with | Line Length -250 km |
| | 240 MVAr switchable line reactor for each | • 765 kV, 240 MVAr switchable line reactors at |
| | circuit at each end of Merta-II - Dausa 765kV | Dausa S/s end- 2 Nos. |
| | D/c line | • 765 kV, 240 MVAr switchable line reactors at |
| | | Merta-II S/s end- 2 Nos. |
| | | • Switching equipment for 765 kV, 240 MVAr |
| | | switchable line reactors at Dausa S/s end – 2 Nos.|
| | | • Switching equipment for 765 kV, 240 MVAr |
| | | switchable line reactors at Merta-II PS end – 2 |
| | | Nos. |
+-------+----------------------------------------------------------+-----------------------------------------------------+
| 5. | 2 Nos. 765kV line bays each at Barmer-I PS | 765 kV line bays at Barmer-I PS – 2 Nos. |
| | &Dausa S/s | • 765 kV line bays at Dausa S/s – 2 nos |
+-------+----------------------------------------------------------+-----------------------------------------------------+
| 6. | 2 Nos. 400kV line bays at Beawar S/s | • 400 kV line bays at Beawar S/s – 2 Nos. |
+-------+----------------------------------------------------------+-----------------------------------------------------+
Note:
• The line lengths mentioned above are approximate as the exact length shall be obtained after the
detailed survey
• Developer of Barmer-I PS shall provide space for 2 Nos. of 765 kV line bays along with space for 2
Nos. of 330 MVAR switchable line reactor and space for spare reactor unit (110 MVAr) at Barmer
-I PS
• Sterlite shall provide space for 2 Nos. of 400 kV line bays at Beawar S/s
• POWERGRID shall provide space for 2 Nos. of 765 kV line bays at Dausa S/s along with space for
2 Nos. of 240 MVAR switchable line reactor
3. System strengthening at Koppal-II and Gadag-II for integration of RE generation projects
Tentative Implementation Time: Dec. 2025 to June 2027
BPC: PFC Consulting Limited
Scope:
+-------+-------------------------------------------------------------+-----------------------------------------------------+----------------+
| Sl. No. | Scope of the Transmission Scheme | Capacity (MVA)/ Route Length (Km) | Schedule |
+=======+=============================================================+=====================================================+================+
| 1. | • Augmentation of 3x1500 MVA 765/400 | • 3x1500 MVA, | Dec'25 |
| | kV ICTs (5th, 6th & 7th) at Koppal-II PS | 765/400kV ICT | |
| | • Augmentation of 5x500 MVA 400/220 | • 765 kV ICT bay – 3 | |
| | kV ICTs (5th, 6th, 7th, 8th & 9th) at | Nos. | |
| | Koppal-II PS | • 400 kV ICT bay – 3 | |
| | • 6 nos. of 220kV line bay at Koppal-II PS | Nos. | |
| | for termination of dedicated Connectivity | • 5x500 MVA, | Dec'25 |
| | transmission line of RE developers | 400/220kV ICTS | |
| | | • 400 kV ICT bay – 5 | |
| | | Nos. | |
| | | • 220 kV ICT bay – 5 | |
| | | Nos. | |
| | | • 220 kV line bays – 2 | 30.12.2025 |
| | | Nos. | |
| | | • 220 kV line bays – 2 | 01.03.2026 |
| | | Nos. | |
| | | • 220 kV line bays – 1 | 31.01.2026 |
| | | No. | |
| | | • 220 kV line bays – 1 | 31.12.2026 |
| | | No. | |
+-------+-------------------------------------------------------------+-----------------------------------------------------+----------------+
| 2. | • Augmentation of 7x500 MVA 400/220 | • 3x500 MVA, | Schedule |
| | kV ICTs (3rd, 4th, 5th, 6th, 7th, 8th & | 400/220kV ICTS | Dec'2025 |
| | 9th) at Gadag-II PS | • 400 kV ICT bay – 3 | |
| | • Gadag-II PS – Koppal-II PS 400 kV | Nos. | |
| | (Quad) 2nd D/c line | • 220 kV ICT bay – 3 | |
| | • 1 No. of 400 kV line bay at Gadag-II PS | Nos. | |
| | for termination of dedicated transmission | • 400 kV line bays – 1 | 30.12.2025 |
| | line of RE developers | No. & 220 kV line | |
| | • 5 Nos. of 220 kV line bays at Gadag-II | bays – 2 Nos. | |
| | PS for termination of dedicated | • 4x500 MVA, | 24 Months |
| | transmission line of RE developers | 400/220kV ICTS | |
| | | • 400 kV ICT bay – 4 | |
| | | Nos. | |
| | | • 220 kV ICT bay – 4 | |
| | | Nos. | |
| | | • 45 km | 24 Months |
| | | • 400 kV line bays – 2 | |
| | | Nos. (at Koppal-II | |
| | | PS) | |
| | | • 400 kV line bays – 2 | |
| | | Nos. (at Gadag-II | |
| | | PS) | |
| | | • 220 kV line bays – 1 | 31.07.2026 |
| | | • 220 kV line bays - 1 | 31.03.2027 |
| | | No. | |
| | | • 220 kV line bays - 1 | 01.06.2027 |
| | | No. | |
+-------+-------------------------------------------------------------+-----------------------------------------------------+----------------+
Note:
• The line length mentioned above is approximate as the exact length shall be obtained after the
detailed survey
• Developer of Koppal-II PS / Gadag-II PS shall provide space for implementation of above system
strengthening works at Koppal-II PS / Gadag-II PS
2. The appointment of the Bid Process Coordinator is subject to the conditions laid down in the Guidelines issued by
Ministry of Power in this regard, amended from time to time.
[F. No. 15/3/2018-Trans-Part(4)]
NAOREM INDRAKUMAR SINGH, Under Secy. (Transmission)
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.
Digitally signed by
AMIT KUMAR AMIT KUMAR JAISWAL
JAISWAL Date: 2024.06.14
22:45:44+05'30'
Login to read full text