Full Text
5871 GI/202 4 (1)
EXTRAORDINARY
PART II —Section 3 —Sub-section ( ii)
PUBLISHED BY AUTHORITY
No. 3586 ] NEW DELHI, THURS DAY , SEPTEMBER 12, 2024/BHADRA 21, 1946
CG-DL-E-13092024-257127
(1) (2)
किमी 48.000 6.613 34.44
1 31.971 32.096 बड़ा पुल 0.125
2 34.802 34.902 बड़ा पुल 0.100
4 43.713 43.913 बड़ा पुल 0.200
5 51.076 51.156 बड़ा पुल 0.080
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATION
New Delhi, the 10th September , 2024
S.O. 3921 (E).— Whereas by notification o f the Government of India in the Ministry of
Road Transport and Highways vide S.O. No 4882(E), dated 26.11.2021 issued under section 5 of
National Highway Act, 1956 (48 of 1956), the Central Government has entrusted the new
National Highway Number 516E in the state of Andhra Pradesh to State Government of Andhra
Pradesh
Now, therefore, in exercise of the powers conferred by section 7 of the National
Highways Act, 1956 (48 of 1956), read with rule 3 of the National Highways Fee (Determination
of Rates and Collection) Rules, 2008 (hereinafter referred to as the “rules”), the Central
Government here by levies the fee on mechanical vehicles at the rate 60% of rates specified in
column (2) of the Table 1 for net road section length of 39.253 Km and for equivalent
structure length (having length more than the 60 m) of 14.42 km (having length of 1.442km )
and 90% of the base rate for bypasses having length of 8.513 km costing rupees ten crore or
more on the type of vehicles specified in column (1) of the Table 1 below of two lane with
paved shoulder of Paderu - Gondiguda and Gondiguda - Araku (up to Bhalluguda) Section from
design kilometer 2.400 to kilometer 51.772 of National Highway number 516E in the state of
Andhra Pradesh and authorizes the National Highway Authority of India to collect, either
through its officials or through contractor, the said fee, namely: -
Table -1
Type Of Vehicle Base rate of the fee as per Km for
the base year 2007 -08 (in Rupees)
(1) (2)
Car, Jeep, Van or Light Motor Vehicle 0.65
Light Commercial Vehicle, Light Goods Vehicle or Mini
Bus 1.05
Bus or Truck (Two Axles) 2.20
Three -axle commercial vehicles 2.40
Heavy Construction Machinery (HCM) or Earth Moving
Equipment (EME) or Multi Axle Vehicle (MAV) (four to six
axles) 3.45
Oversized Vehicles (seven or more axles) 4.20
1. The fee to be levied and collected here under shall be due and payable at the Fee Plaza for
net road length specified for such Fee Plaza(s) namely:
Table -2
Location of the Toll Plaza
(Chainage) Length (in Km) for
which Fee is Payable Rate at which fee is Payable
At km 14.850 of NH -516E in
Pedagaruvu village in Alluri
Sitharama Raju District of the
State of Andhra Pradesh 39.253 60% for two lane with paved
shoulders, of the base rates
mentioned in the Table -1
above
2. In addition to above, the following fee shall also be due and payable for the use of the
bypass costing Rs 10 crore or more at the following Fee Plaza for net bypass length specified
for such Fee Plaza(s) :-
Table -3
Location of Fee
Plaza
(Chainage) Name of the
Bypass Taking off Merging
at Length and cost of bypass
for which additional fee is
payable Rate at
which fee is
payable Length (in
km) Cost (in Rs.
Crore)
At km 14.850 of
NH-516E in
Pedagaruvu
village in Alluri
Sitharama Raju
District of the
State of Andhra
Pradesh Hukumpeta Design km
7.300 Design km
9.200 1.900 11.90 90% for two
lane with
paved
shoulders, of
the base
rates
mentioned in
Table -I
above Araku Valley Design km
40.250 Design km
48.000 6.613 34.44
3. In addition to the above, the following fee shall also be due and payable for the use the
following structure having length more than 60m at the following Fee Plaza(s), by converting
the length of the structure in to an equivalent length of highway by multiplying the length of
such structure by an equalization factor of 10: -
Table -4
Location of Fee Plaza
(Chainage) Length of structures (in
km) to be converted into
equivalent road length Equivalent
road length
(in km) Rate at which
fee is payable
At km 14.850 of NH -516E in
Pedagaruvu village in Alluri
Sitharama Raju District of the
State of Andhra Pradesh 1.442^ 14.42 60% for two
lane with paved
shoulders, of
the base rates
mentioned in
Table -I above
^The details of two -lane structures are as under:
Chainage Type of Structure Length (in Km)
From Km To Km
1 31.971 32.096 Major Bridge 0.125
2 34.802 34.902 Major Bridge 0.100
3 40.530 41.467 ROB + Viaduct 0.937
4 43.713 43.913 Major Bridge 0.200
5 51.076 51.156 Major Bridge 0.080
6 Total 1.442
4. The rate of monthly pass for a person who owns a mechanical vehicle registered for non -
commercial purposes and resides within a distance of twenty kilometers from the fee plaza is
Rs. 340.00/ - (Rupees Three Hundred and Forty only) for the year 2024 -25 and is subjected to
revision every year as per the provisions of the said rules.
5. For multiple journeys on the highway section, passes shall be issued at the following rates,
namely:
Table -5
Amount Payable Maximum member of one -
way journey allowed Period of validity
One and half times of the
fee for one way journey Two Twenty Four Hours from
time of payment
Two-third of amount of the
fee payable for fifty single
journeys Fifty One month from date of
payment
6. Fee for commercial vehicle (excluding vehicles plying under National permit) registered in
the district where the fee plaza falls shall be 50% of the specified rate for that category of
vehicle provided no service road or alternative road is available for use of such commercial
vehicles.
7. The driver or owner or a person in charge of a mechanical vehicle which is loaded in excess
of permissible load specified for its category, shall be liable to pay fee for entering the
overloaded vehicle on the National Highway to the fee collecting agency, equal to the fee
specified in sub -rule 1A of rule 10 of the said rules, and shall not be entitled to make use of the
highway section unless the excess load has been removed from such mechanical vehicle.
8. All definitions including category of mechanical vehicles, its permissible load, category of
exempted vehicles, service road, alternative road etc. shall be as per definitions specified in
the said rules.
9. The fee rates shall be displayed for information of the users in accordance with rule 12 of
the said rule.
10. Based on the Base rate of fee per km for the base year 2007 -08 as mentioned in Table -1
above, the actual amount of fee to be charged from the mechanical vehicle and the discounts
will be calculated by the National Highways Authority of India on the basis of completed length
of the section and revised annually in accordance with the rule 5 of the said rules and the same
shall be published in at least one newspaper in English and vernacular language.
11. The estimated capital cost of the project is Rs.476.83 crore . The Capital cost is subjected
to variation as activities of the land acquisition, rehabilitation and resettlement, civil works
are in progress and financial closure of the project is yet to be completed. The National
Highways Authority of India shall maintain a record of the recovery of capital cost through user
fee realized.
[File No. - MoRTH/PIU/ARAKU/Package -IV/TollPlaza/E -235526]
SUMAN PRASAD SINGH , Jt. Secy.
Uploaded by Dte. of Printing at Government of India Press, Ring R oad, Mayapuri, New Delhi -110064
and Published by the Controller of Publications, Delhi -110054.
Login to read full text