NEW DELHI, THURSDAY, AUGUST 13, 2026/SHRAVAN 22, 1948
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATION
New Delhi, the 12th August, 2026
S.O. 4469(E) .— Whereas in the exercise of the powers conferred by Section 8A of NH Act, 1956 (48 of 1956)
read with rule 3 of NH Fe Rules, 2008, Central Government vide Gazette Notification bearing number S.O. 122(E)
dated 17.01.2014 has authorised the M/s Moradabad Bareilly Expressway Limited(hereinafter referred to as the
"Concessionaire") to collect and retain the fee on and from the date of commercial operation or publication of this
notification in the Official Gazette, whichever is later, till the termination date as specified in the agreement.
And whereas, National Highways Authority of India (hereinafter referred to as the 'Authority') at its own
additional cost has developed ROB (from Km. 179.350 to Km. 180.150) in district Moradabad for a length of 800m on
the National Highway number 24 (new NH-09) in the State of Uttar Pradesh. A supplementary agreement dated 10th
October, 2024 has been signed between National Highways of India (hereinafter referred to as the "Authority") and
Concessionaire for the modalities of fee collection for the said ROB and to enable the concessionaire to collect the fee
on behalf of the Authority.
Now, in exercise of the powers conferred by section 8A of the National Highways Act, 1956 (48 of 1956),
read with Rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules 2008, the Central
Government, having regard to the aforesaid agreement entered into between the authority and the concessionaire, hereby
authorises the Concessionaire to collect the fee for use of ROB in Moradabad, having a length of 800m, on behalf of
the Authority and makes the following amendments to the notification published in the Gazette of India, Extraordinary,
Para II, Section 3, Sub-Section (ii) vide S.O. 122(E) dated 17.01.2014 (hereinafter referred to as the "said notification"),
namely:-
(i) In Paragraph 3 of said notification, the figure “66.950 km” (appearing in line 7) shall be substituted with
"67.680 km and for equivalent structure length (having length more than 60 m) of 0.700 km (having length
of 0.070 km)"
(ii) In the said notification, the Table specified in Point No. 1 shall be substituted with the following:
+-----------------------------------------------+---------------------------------------+
| Location of Toll Plazas (Design Chainage) | Length (in km) for which Fee is payable |
+===============================================+=======================================+
| At Km 172.698 (existing chainage at Km 172.250) near Village | 40.780 |
| Niyamatpur Ektoria in District Moradabad | |
+-----------------------------------------------+---------------------------------------+
| At Km 228.885 (existing chainage at Km 227.900) near Village | 26.900 |
| Thiriya Khetal in District Bareilly | |
+-----------------------------------------------+---------------------------------------+
(iii) In point no. 2, the following sub point 2(a) shall be inserted, namely: -
"2(a) In addition to above, the following fee shall also be due and payable for the use of the following
structures having length more than 60 m at the following Fee Plazas, by converting the length of structures
into an equivalent length of highways by multiplying the length of such structures by an equalisation factor of
10, at the base rates mentioned in Table-1 above, namely: -
+------------------------------------------------+---------------------------------------------------------------------------------------------------------------------+
| Location of Toll Plaza (Design Chainage) | Length (in km) for which Fee payable |
| +---------------------------------------------------------------------------------------------------------------------+
| | Length of structures (in km) to be converted into equivalent road length | Equivalent length (in km) | Rate at which fee is payable |
+================================================+==========================================================================+===========================+==============================+
| At Km 172.698 (existing chainage at Km 172.250) near Village Niyamatpur Ektoria in District Moradabad | 0.070* | 0.700 | 100% for four or more lane, of base rates mentioned in Table-1 above |
+------------------------------------------------+--------------------------------------------------------------------------+---------------------------+------------------------------+
*The details of structures (>60 m length) are as under:
+--------+-----------------------------------+-----------------------------------+-----------------------------------+--------------------+
| S. No. | Location of Structures | Normal length of Structures | Equivalent length of structures | Type of Structure |
| | (Design Chainage) | (in km) | (in km) | |
+========+===================================+===================================+===================================+====================+
| 1. | At Km 179.760 | 0.070 | 0.700 | ROB |
+--------+-----------------------------------+-----------------------------------+-----------------------------------+--------------------+
[F. No. 11015/2/2010/BOT/PIU-MBD-Part(3)/E-244322]
CHETNA NAND SINGH, Jt. Secy.