Levy, under section 7 of the National Highways Act, 1956 read with the National Highways Fee (Determination of Rates and Collection) Rules, 2008, of user fees for the NH-127/NH-715 stretch from Nagaon Bypass to Dolabari Junction in Assam, collectable by the National Highways Authority of India.

Detailed Summary

By S.O. 3441(E) dated 2nd August, 2024, the Ministry of Road Transport and Highways, exercising powers under section 7 of the National Highways Act, 1956 (48 of 1956) read with rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008, levied user fees for the section of NH-37 (now NH-127) from Km 278.58 to Km 315.315 (Nagaon Bypass to Kaliabor Tiniali) and NH-37A (now NH-715) from Km 0.000 to Km 17.300 (Kaliabor Tiniali to Dolabari Junction, including the New Brahmaputra Bridge) in Assam, a stretch entrusted to the National Highways Infrastructure Development Corporation Limited (NHIDCL) by earlier notifications S.O. 539(E) dated 17.02.2015 and S.O. 878(E) dated 31.03.2015 under section 5, and authorised the National Highways Authority of India to collect the fee; base-year (2007-08) rates per Table 1 range from Rs. 0.65/km for cars/jeeps/vans to Rs. 4.20/km for oversized vehicles (seven-plus axles), payable at 100% for the four-lane length of 50.472 km and at 60% for a 0.450 km two-lane paved-shoulder length at the fee plaza at Km 7+200 of NH-715 near Sulung Village, Nagaon District, with an additional structure-length fee applying a 10x equalisation factor to 3.093 km of major bridges/flyovers (equivalent to 30.93 km); the notification also sets a Rs. 340 monthly local-resident pass for 2024-25, multiple-journey pass rates, a 50% commercial-vehicle discount where no alternative road exists, overloaded-vehicle surcharge provisions, and states the project's estimated capital cost as Rs. 1817.32 Crore, subject to variation pending completion of land acquisition, utility shifting and tree cutting.

Full Text

REGD. No. D. L.-33004/99 The Gazette of India CG-DL-E-13082024-256326 EXTRAORDINARY PART II-Section 3-Sub-section (ii) PUBLISHED BY AUTHORITY No. 3126] NEW DELHI, MONDAY, AUGUST 12, 2024/SHRAVANA 21, 1946 MINISTRY OF ROAD TRANSPORT AND HIGHWAYS NOTIFICATION New Delhi, the 2nd August, 2024 S.O. 3441(E).—Whereas by notification of the Government of India in the Ministry of Road Transport and Highways vide [number S.O. 539(E) dated 17.02.2015 and S.O. 878(E) dated 31.03.2015] issued under Section 5 of the National Highways Act, 1956(48 of 1956), the Central Government has entrusted the stretch from Km 278.58 to Km 315.315 (Nagaon Bypass to Kaliabor Tiniali) of NH-37 & from Km 0.000 to Km 17.300 (Kaliabor Tiniali to Dolabari Junction) of NH-37A in the State of Assam to NHIDCL. Now, therefore, in exercise of the powers conferred by Section 7 of the National Highways Act, 1956 (48 of 1956), read with rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008 (hereinafter referred to as the "rules"), the Central Government hereby levies the fee at the rate specified in column (2) of Table 1 below for net road section of length 50.472 Km and for equivalent structures length (having length more than 60 m) of 30.93 Km (having length of 3.093 Km) for use of four lane section and at 60% of the base rate for net road section length of 0.450 Km and for equivalent structure length (having length more than 60m) of 4.50 km (having length of 0.450 km) for use of two lane with paved shoulders on the type of vehicles specified in column (1) of the Table 1 below of Nagaon Bypass to Kaliabor Tiniali from Design kilometer 278.600 to kilometer 315.315 (existing km 278.58 to km 315.315) of National Highway number 127 and Kaliabor Tiniali to Dolabari including construction of New Brahmaputra Bridge from Design kilometer 0.000 to kilometer 17.300 (existing km 0.000 to km 17.300) of National Highway number 715 in the State of Assam and authorises the National Highways Authority of India to collect, either through its officials or through a contractor, the said fee, namely:- Table 1 +---------------------------------------------------+---------------------------------------------------+ | Type of Vehicle | Base rate of fee per km for the base year | | | 2007-08 (in Rupees) | +===================================================+===================================================+ | (1) | (2) | +---------------------------------------------------+---------------------------------------------------+ | Car, Jeep, Van or Light Motor Vehicle | 0.65 | +---------------------------------------------------+---------------------------------------------------+ | Light Commercial Vehicle, Light Goods Vehicle or Minibus | 1.05 | +---------------------------------------------------+---------------------------------------------------+ | Bus or Truck (Two Axles) | 2.20 | +---------------------------------------------------+---------------------------------------------------+ | Three-axle commercial vehicles | 2.40 | +---------------------------------------------------+---------------------------------------------------+ | Heavy Construction Machinery (HCM) or Earth Moving Equipment | 3.45 | | (EME) or Multi Axle Vehicle (MAV) (four to six axles) | | +---------------------------------------------------+---------------------------------------------------+ | Oversized Vehicles (seven or more axles) | 4.20 | +---------------------------------------------------+---------------------------------------------------+ 1. The fee to be levied and collected hereunder shall be due and payable at the Fee Plaza for net road length specified for such Fee Plaza (s) namely:- Table 2 +---------------------------------------------------+---------------------------------------------------+---------------------------------------------------+ | Location of Fee Plaza (chainage) | Length (in km) for which Fee is | Rate at which fee is payable | | | payable | | +===================================================+===================================================+===================================================+ | At Km 7+200 of NH-715 near Sulung | 50.472 | 100% for four or more lane of | | Village in Nagaon District of State Assam | [Excluding length of | the base rates mentioned in | | | Bypass(costing>10 cr.) and length | Table-1 above | | | of Structures (>60m)] | | +---------------------------------------------------+---------------------------------------------------+---------------------------------------------------+ | | 0.450 | 60% for two lane with paved | | | [Excluding length of | shoulders of the base rates | | | Bypass(costing>10 cr.) and length | mentioned in Table-1 above | | | of Structures (>60m)] | | +---------------------------------------------------+---------------------------------------------------+---------------------------------------------------+ 2. In addition to above, the following fee shall also be due and payable for the use of the following structures having length more than 60 m at the following Fee plaza(s), by converting the length of structures into an equivalent length of highway by multiplying the length of such structures by an equalization factor of 10: - Table 3 +---------------------------------------------------+---------------------------------------------------+---------------------------------------------------+---------------------------------------------------+ | Location of Fee | Length of structures (in | Equivalent | Rate at which fee is payable | | Plaza (chainage) | km) to be converted into | road length | | | | equivalent road length | (in km) | | +===================================================+===================================================+===================================================+===================================================+ | At Km 7+200 of NH- | 3.093 | 30.93 | 100% for four or more lane of the base | | 715 near Sulung | | | rates mentioned in Table-1 above | | Village in Nagaon | | | | | District of State | | | | | Assam | 0.450 | 4.50 | 60% for two lane with paved shoulders of | | | | | the base rates mentioned in Table-1 | | | | | above | +---------------------------------------------------+---------------------------------------------------+---------------------------------------------------+---------------------------------------------------+ The details are as under: - Existing Bridge Chainage New Bridge Chainage Type of Structure Mean Length(in Km) +-----+-------------------+-------------------+-------------------+-------------------+-------------------+-------------------+ | | From Km. | Το Km. | From Km. | Το Km. | | | +=====+===================+===================+===================+===================+===================+===================+ | 1 | | | 314+767 | 315+217 | Flyover (2-lane) | 0.450 | +-----+-------------------+-------------------+-------------------+-------------------+-------------------+-------------------+ | 2 | 0+622.5 | 0+687.5 | 0+622.5 | 0+687.5 | Major Bridge(4-lane)| 0.065 | +-----+-------------------+-------------------+-------------------+-------------------+-------------------+-------------------+ | 3 | 9+325 | 12+340 | 9+325 | 12+365 | Major Bridge(4-lane)| 3.028 | +-----+-------------------+-------------------+-------------------+-------------------+-------------------+-------------------+ | | Total Length | | | | | 3.543 | +-----+-------------------+-------------------+-------------------+-------------------+-------------------+-------------------+ 3. The rate of monthly pass for a person who owns a mechanical vehicle registered for non-commercial purposes and resides within a distance of twenty kilometres from the fee plaza is Rs. 340.00(Rupees Three Hundred and Forty only) for the year 2024-25 and is subject to revision every year as per the provisions of the said rules. 4. For multiple journeys on the highway section, passes shall be issued at the following rates, namely:- Table 4 +---------------------------------------------------+---------------------------------------------------+---------------------------------------------------+ | Amount Payable | Maximum number of one- | Period of validity | | | way journeys allowed | | +===================================================+===================================================+===================================================+ | One and half times of the fee for one- | Two | Twenty-four hours from the time of | | way journey | | payment | +---------------------------------------------------+---------------------------------------------------+---------------------------------------------------+ | Two-third of amount of the fee | Fifty | One month from date of payment | | payable for fifty single journeys | | | +---------------------------------------------------+---------------------------------------------------+---------------------------------------------------+ 5. Fee for commercial vehicle (excluding vehicles plying under National permit) registered in the district where the fee plaza falls shall be 50% of the specified rate for that category of vehicle provided no service road or alternative road is available for use of such commercial vehicles. 6. The driver or owner or a person in charge of a mechanical vehicle which is loaded in excess of permissible load specified for its category, shall be liable to pay fee for entering the over loaded vehicle on the National Highway to the fee collecting agency, equal to the fee specified in sub-rule 1A of rule 10 of the said rules, and shall not be entitled to make use of the highway section unless the excess load has been removed from such mechanical vehicle. 7. All definitions including category of mechanical vehicles, its permissible load, category of exempted vehicles, service road, alternative road, etc. shall be as per definitions specified in the said rules. 8. The fee rates shall be displayed for information of the users in accordance with rule 12 of the said rules. 9. Based on the base rate of fee per kilometre for the base year 2007-08 as mentioned in Table-1 above, the actual amount of fee to be charged from the mechanical vehicles and the discounts will be calculated by the National Highways Authority of India on the basis of the completed length of the section and revised annually in accordance with the rule 5 of the said rules and the same shall be published in at least one newspaper in English and vernacular language. 10. The estimated capital cost of the project is Rupees. 1817.32 Crore. The capital cost is subject to variation as the activities of Land Acquisition, Utility Shifting, Tree Cutting, etc. are yet to be completed. National Highways Authority of India shall maintain a record of the recovery of capital cost through user fee realised. [F. No. NHIDCL/Assam/NH-37A/TollPlaza/E-227324] SUMAN PRASAD SINGH, Jt. Secy. Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.

Never miss important gazettes

Create a free account to save gazettes, add notes, and get email alerts for keywords you care about.

Sign Up Free