Levy of user fee under section 7 of the National Highways Act, 1956 for the Kundal to Jhadol section of NH58E, including associated bypasses, in Udaipur district, Rajasthan.

Detailed Summary

The Ministry of Road Transport and Highways, via notification S.O. 1314(E) dated 12th March 2024, recites that by earlier notification S.O. 4530(E) dated 18th December 2019 issued under section 5 of the National Highways Act, 1956 (48 of 1956), the Central Government had entrusted the National Highway 58 Extn (Old NH 76A) stretch in Rajasthan to the State Government of Rajasthan, and now, in exercise of powers under section 7 of the said Act read with rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008, levies fee at 60% of base rates (base year 2007-08) for the two-lane paved-shoulder Kundal to Jhadol section (design Km 0.00 to Km 43.900 of NH 58E), net road length 33.85 km plus equivalent structure length 1.80 km (actual bridge length 0.180 km), and at 90% of base rates for three bypasses costing Rs. 10 crore or more (Kundal 1.350 km/Rs. 18.81 crore, Naya Kheda 3.700 km/Rs. 21.47 crore, Jhadol 4.82 km/Rs. 55.43 crore excluding two major bridges), all payable at the fee plaza at Km 16.750 of NH-58E near Pipalwas village, Udaipur district, collected by the National Highways Authority of India; it prescribes a monthly pass of Rs. 330.00 for 2023-24 for local residents, multiple-journey pass rates, a 50% concession for local commercial vehicles absent alternative roads, overload penalties under rule 10(1A), and states the estimated capital cost of the project as Rs. 273.97 Crore, subject to variation pending completion of land acquisition, utility shifting and tree cutting; signed by Suman Prasad Singh, Joint Secretary, under File No. RO/JAI/Toll/2021-22/1107/E-200660.

Full Text

1873 GI/202 4 (1) EXTRAORDINARY PART II —Section 3 —Sub-section ( ii) PUBLISHED BY AUTHORITY No. 1252] NEW DELHI, WEDNES DAY , MARCH 1 3, 2024 /PHALGUNA 23, 1945 CG-DL-E-13032024-252951 (1) (2) 1.05 16.750 दकमी पर 29.370 * 90% नया खेड़ा 2.100 5.800 3.700 21.47 38.500 43.500 4.82 MINISTRY OF ROAD TRANSPORT AND HIGHWAYS NOTIFICATION New Delhi, the 12th March, 2024 S.O. 1314 (E).—Whereas by notification of the Government of India in the Ministry of Road Transport and Highways S.O. 4530(E) dated 18th December, 2019 issued under Section 5 of the National Highways Act 1956 (48 of 1956), the Central Government has e ntrusted the stretch the National Highway 58 Extn (Old NH 76A) in the State of Rajasthan to State Government of Rajasthan ; Now, ther efore, in exercise of the powers conferred by section 7 of the National Highways Act, 1956 (48 of 1956), read with rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008 (hereinafter referred to as the “rules”), the Centra l Government hereby levies the fee at sixty percent of the rate specified in column (2) of the Table 1 for net road section length of 33.85 km and for equivalent structure length (having length more than 60m) of 1.80 km (having length of 0.180 km) and ninet y percent of the base rate for bypasses having length of 9.87 km costing rupees ten crore or more on the type of vehicles specified in column (1) of the Table 1 below for use two lane with paved shoulder of Kundal to Jhadol section from design kilometer 0.0 0 to kilometer 43.900 of National Highway 58E in the State of Rajasthan and authorises the National Highways Authority of India to collect, either through its officials or through a contractor, the said fee, namely: - TABLE -1 Type of vehicle Base rate of fee per km for the base year 2007 -08 (in Rupees) (1) (2) Car, Jeep, Van or Light Motor Vehicle 0.65 Light Commercial Vehicle, Light Goods Vehicle or Mini Bus 1.05 Bus or Truck (Two Axles) 2.20 Three -axle commercial vehicles 2.40 Heavy Construction Machinery (HCM) or Earth Moving Equipment (EME) or Multi Axle Vehicle (MAV) (four to six axles) 3.45 Oversized Vehicles (seven or more axles) 4.20 1. The fee to be levied and collected hereunder shall be due and payable at the Fee Plaza for net road length specified for such Fee Plaza(s) namely: - TABLE -2 Location of Fee Plaza (chainage) Length (in km) for which Fee is payable Rate at which fee is payable At Km 16.750 of NH - 58E near Pipalwas village in Udaipur district of State Rajasthan 29.370* [Excluding length of Bypass (costing >10 Cr.) and length of structures (>60m)] 60% for two lane with paved shoulders, of the base rates mentioned in Table -1 above *After completion of construction in balance length, the fee shall be levied and collected for 33.850 km length [i.e. full tolling section excluding length of Bypass (costing >10 Cr.) and length of structures (>60m)]. 2. In addition to above, the following fee shall also be due and payable for the use of the bypass costing Rs 10 crore or more at the following Fee Plaza for net bypass length specified for such Fee Plaza(s): - TABLE -3 Location of Fee Plaza (chainage) Name of the Bypass Taking Off Merging at Length and Cost of bypass for which additional fee is payable Rate at which fee is payable Length (in Km.) Cost (in Rs. Crore) At Km 16.750 of NH-58E near Pipalwas village in Udaipur district of State Rajasthan Kundal 0.00 1.350 1.350 18.81 90% for two lane with paved shoulders, of the base rates mentioned in Table -1 above Naya Kheda 2.100 5.800 3.700 21.47 Jhadol 38.500 43.500 4.82 (excluding two major bridges) 55.43 3. In addition to above, the following fee shall also be due and payable for the use of the following structures having length more than 60m at the following Fee Plaza(s), by converting the length of structures into an equivalent length of highway by multiplying the length of such structures by an equalisation factor of 10: - TABLE -4 Location of Fee Plaza (chainage) Length of structures (in km) to be converted into equivalent road length Equivalent road length (in km) Rate at which fee is payable At Km 16.750 of NH -58E near Pipalwas village in Udaipur district of State Rajasthan 0.180 1.80 60% for two lane with paved shoulders, of the base rates mentioned in Table -1 above ^The details are as under: - Chainage Type of Structure Length (in km) From Km To Km 1 40.600 40.680 RCC deck slab 0.080 2 41.147 41.247 RCC deck slab 0.100 Total 0.180 4. The rate of monthly pass for a person who owns a mechanical vehicle registered for non -commercial purposes and resides within a distance of twenty kilometers from the fee plaza is Rs 330.00 ( Three Hundred and Thirty Rupees only) for the year 2023 -24 and is subject to revision every year as per the provisions of the said rules. 5. For multiple journeys on the highway section, passes shall be issued at the following rates, namely: - TABLE -5 Amount Payable Maximum number of one way journeys allowed Period of validity One and one -half times of the fee for one way journey Two Twenty four hours time of payment from the Two-third of amount of the fee payable for fifty single journeys Fifty One month from payment date of 6. Fee for commercial vehicle (excluding vehicles plying under National permit) registered in the district where the fee plaza falls shall be 50% of the specified rate for that category of vehicle provided no service road or alternative road is available for use of su ch commercial vehicles. 7. The driver or owner or a person in charge of a mechanical vehicle which is loaded in excess of permissible load specified for its category, shall be liable to pay fee for entering the overloaded vehicle on the National Highw ay to the fee collecting agency, equal to the fee specified in sub -rule 1A of rule 10 of the said rules, and shall not be entitled to make use of the highway section unless the excess load has been removed from such mechanical vehicle. 8. All definitions including category of mechanical vehicles, its permissible load, category of exempted vehicles, service road, alternative road, etc. shall be as per definitions specified in the said rules. 9. The fee rates shall be displayed for infor mation of the users in accordance with rule 12 of the said rules. 10. Based on the base rate of fee per kilometer for the base year 2007 -08 as mentioned in Table -1 above, the actual amount of fee to be charged from the mechanical vehicles and the dis counts will be calculated by the National Highways Authority of India on the basis of the completed length of the section and revised annually in accordance with the rule 5 of the said rules and the same shall be published in at least one newspaper in Engl ish and vernacular language. 11. The estimated capital cost of the project is Rupees 273.97 Crore. The capital cost is subject to variation as the activities of land acquisition, utility shifting, tree cutting, etc. are yet to be completed. The N ational Highways Authority of India shall maintain a record of the recovery of capital cost through user fee realised. [F. No. RO/JAI/To ll/2021 -22/110 7/E-200660] SUMAN PRASAD SINGH , Jt. Secy. Uploaded by Dte. of Printing at Government of India Press, Ring R oad, Mayapuri, New Delhi -110064 and Published by the Controller of Publications, Delhi -110054.

Never miss important gazettes

Create a free account to save gazettes, add notes, and get email alerts for keywords you care about.

Sign Up Free