Full Text
1870 GI/202 4 (1)
EXTRAORDINARY
PART II —Section 3 —Sub-section ( ii)
PUBLISHED BY AUTHORITY
No. 1250] NEW DELHI, WEDNES DAY , MARCH 1 3, 2024 /PHALGUNA 23, 1945
CG-DL-E-13032024-252937
(1) (2)
60.300 दकमी 62.200
खंड का आरंभ दकमी 27.400 0 0 0 0 0.325 11.100 19.4150 21.3150
िोगेवाला दकमी 27.900 0 0 0 0 0.325 11.100 19.4150 21.3150
डबवाली दकमी 30.400 0 0 0 0 0.325 11.100 19.4150 21.3150
अजलका दकमी 33.800 0 0 0 0 0.325 11.100 19.4150 21.3150
िेरगढ़ दकमी 41.125 0.325 0.325 0.325 0.325 0 10.775 19.0900 20.9900
अबूबिहर दकमी 51.985 11.100 11.100 11.100 11.100 10.775 0 8.315 10.215
चौटाला दकमी 60.300 19.4150 19.4150 19.4150 19.4150 19.0900 8.315 0 1.900
खंड का समाजि दकमी 62.20 0 21.3150 21.3150 21.3150 21.3150 20.9900 10.215 1.900 0
60.300 दकमी 62.200
खंड का आरंभ दकमी 27.400 0 0.4761 2.9328 6.3328 13.3328 13.3328 13.3328 13.3328
िोगेवाला दकमी 27.900 0.4761 0 2.4567 5.8567 12.8567 12.8567 12.8567 12.8567
डबवाली दकमी 30.400 2.9328 2.4567 0 3.400 10.400 10.400 10.400 10.400
अजलका दकमी 33.800 6.3328 5.8567 3.400 0 7.000 7.000 7.000 7.000
िेरगढ़ दकमी 41.125 13.3328 12.8567 10.400 7.000 0 0 0 0
अबूबिहर दकमी 51.985 13.3328 12.8567 10.400 7.000 0 0 0 0
चौटाला दकमी 60.300 13.3328 12.8567 10.400 7.000 0 0 0 0
खंड का समाजि दकमी 62.200 13.3328 12.8567 10.400 7.000 0 0 0 0
(1) (2) (3) (4) (5)
60.300 दकमी 62.200
27.400 0 0.0239 0.0672 0.0672 0.0672 0.1522 0.1522 0.1522
27.900 0.0239 0 0.0433 0.0433 0.0433 0.1283 0.1283 0.1283
30.400 0.0672 0.0433 0 0 0 0.0850 0.0850 0.0850
33.800 0.0672 0.0433 0 0 0 0.0850 0.0850 0.0850
41.125 0.0672 0.0433 0 0 0 0.0850 0.0850 0.0850
51.985 0.1522 0.1283 0.0850 0.0850 0.0850 0 0 0
60.300 0.1522 0.1283 0.0850 0.0850 0.0850 0 0 0
62.200 0.1522 0.1283 0.0850 0.0850 0.0850 0 0 0
27.8761 27.9433 वीयूपी 0.0672
46.768 46.853 बड़ा पुल 0.0850
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATION
New Delhi, the 12th March , 2024
S.O. 1312(E).—Whereas by notification of the Government of India in the Ministry of Road Transport and
Highways number S.O. 1457 (E) dated 0 9.05.2017 issued under Section 11 of the National Highways Authority of
India Act, 1988 (68 of 1988), the Central Government has entrusted the stretch from kilometer 40.44 to kilometer
73.94 (Dabwali -Goluwala -Rajasthan Border) of National Highway No. 54 (new) in the State of Haryana & Punjab to
the National Highways Authority of India (hereinafter referred to as the "Authority");
Now, therefore, in exercise of the powers conferred by section 7 of the National Highways Act, 1956 (48 of
1956), read wit h rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008
(hereinafter referred to as the "rules"), the Central Government hereby levies the fee on mechanical vehicles at the
rate specified in column (2) of the Table 1 fo r net road section length of 21.3150 km and for equivalent structure
length (having length more than 60m) of 1.522 km (having length of 0.1522 km) and at one and one half times the
base rate for bypasses having length of 13.3328 km costing rupees ten cro re or more on the type of vehicles specified
in column (1) of the Table 1 below for the use of Mandi Dabwali to Chautala section from design kilometer 27.400 to
kilometer 62.200 of National Highway number 54 (new) in the State of Haryana & Punjab and a uthorises the
Authority to collect, either through its officials or through a contractor, the said fee, namely: -
Table 1
Type of vehicle Base rate of fee per km for the base
year 2007 -08 (in Rupees)
(1) (2)
Car, Jeep, Van or Light Motor Vehicle 0.65
Light Commercial Vehicle, Light Goods Vehicle or Mini Bus 1.05
Bus or Truck (Two Axles) 2.20
Three -axle commercial vehicles 2.40
Heavy Construction Machinery (HCM) or Earth Moving Equipment (EME)
or Multi Axle Vehicle (MAV) (four to six axles) 3.45
Oversized Vehicles (seven or more axles) 4.20
1. The fee to be levied and collected hereunder shall be due and payable at the Fee Plaza for net road length specified
for such Fee Plaza(s) namely: -
Table 2
Journey from Design Km. 27.400 to Km. 62.200 - Length 34.8 Km
Sr. No. Location of Fee Plaza (chainage) Length (in km) for which Fee is
payable [Excluding length of
Bypass (costing >10 Cr.) and
length of structures (>60m)] Rate at which
fee is payable
1 Design Km. 27.900 of NH -54 (new)
near Jogewala v illage, dist. Sirsa (Haryana)
as per the distance matrix at Table
2A below 100% of the base
rates mentioned
in Table -1 above
for 6 -lane access -
controlled NH 2 Design Km. 30.400 of NH -54 (new)
near Dabwali village, dist. Sirsa (Haryana)
3 Design K m. 33.800 of NH -54 (new)
near Alika village, dist. Sirsa (Haryana)
4 Design Km. 41.125 of NH -54 (new)
near Shergarh village, dist. Sirsa (Haryana)
5 Design Km. 51.985 of NH -54 (new)
near Abubshehar village, dist. Sirsa (Haryana)
6 Design Km. 60.300 of NH -54 (new)
near Chautala village, dist. Sirsa (Haryana)
Table 2A
Distance Matrix for road length [Excluding length of Bypass (costing >10 Cr.) and length of structures (>60m)]
To Start of
section Jogewala Dabwali Alika Shergarh Abubshehar Chautala End of
section
From Km Km.
27.400 Km.
27.900 Km.
30.400 Km.
33.800 Km.
41.125 Km. 51.985 Km.
60.300 Km.
62.200
Start of
section Km.
27.400 0 0 0 0 0.325 11.100 19.4150 21.3150
Jogewala Km 27.900 0 0 0 0 0.325 11.100 19.4150 21.3150
Dabwali Km 30.400 0 0 0 0 0.325 11.100 19.4150 21.3150
Alika Km.
33.800 0 0 0 0 0.325 11.100 19.4150 21.3150
Shergarh Km 41.125 0.325 0.325 0.325 0.325 0 10.775 19.0900 20.9900
Abubshehar Km.
51.985 11.100 11.100 11.100 11.100 10.775 0 8.315 10.215
Chautala Km.
60.300 19.4150 19.4150 19.4150 19.4150 19.0900 8.315 0 1.900
End of
section Km.
62.200 21.3150 21.3150 21.3150 21.3150 20.9900 10.215 1.900 0
2. In addition to above, the following fee shall also be due and payable for the use of the bypass costing Rs 10 crore or
more at the following Fee Plaza for net bypass length specified for such Fee Plaza(s) : -
Table 3
Journey from Km. 27.400 to Km. 62.200 - Length 34.8 Km
Sr. No. Location of Fee Plaza
(chainage) Name of the
Bypass Taking Off Merging at Length and
Cost of bypass
for which
additional fee
is payable Rate at
which fee is
payable
1 Design Km. 27.900 of NH -54
(new)
near Jogewala village, dist. Sirsa
(Haryana)
Mandi Dabwali
Bypass of NH -54
(new) Km. 27.400 Km. 40.800 As per the
distance matrix
at Table 3A
below
(Length
13.3328 Km
and Cost Rs.
368 Cr.) 150% of the
base rates
mentioned
in Table -1
above for 6 -
lane access -
controlled
NH 2 Design Km. 30.400 of NH -54
(new)
near Dabwali village, dist. Sirsa
(Haryana)
3 Design Km. 33.8 00 of NH -54
(new)
near Alika village, dist. Sirsa
(Haryana)
4 Design Km. 41.125 of NH -54
(new)
near Shergarh village, dist.
Sirsa (Haryana)
5 Design Km. 51.985 of NH -54
(new)
near Abubshehar village, dist.
Sirsa (Haryana)
6 Desig n Km. 60.300 of NH -54
(new)
near Chautala village, dist. Sirsa
(Haryana)
Table 3A
Distance Matrix for road length of Bypass (costing >10 Cr.) excluding length of structures (>60m)
To Start of
section Jogewala Dabwali Alika Shergarh Abubsheha r Chautala End of
section
From Km Km.
27.400 Km. 27.900 Km.
30.400 Km.
33.800 Km. 41.125 Km. 51.985 Km.
60.300 Km.
62.200
Start of
section Km.
27.400 0 0.4761 2.9328 6.3328 13.3328 13.3328 13.3328 13.3328
Jogewala Km
27.900 0.4761 0 2.4567 5.8567 12.8567 12.8567 12.8567 12.8567
Dabwali Km
30.400 2.9328 2.4567 0 3.400 10.400 10.400 10.400 10.400
Alika Km.
33.800 6.3328 5.8567 3.400 0 7.000 7.000 7.000 7.000
Shergarh Km
41.125 13.3328 12.8567 10.400 7.000 0 0 0 0
Abubshehar Km.
51.985 13.3328 12.85 67 10.400 7.000 0 0 0 0
Chautala Km.
60.300 13.3328 12.8567 10.400 7.000 0 0 0 0
End of section Km.
62.200 13.3328 12.8567 10.400 7.000 0 0 0 0
3. In addition to above, the following fee shall also be due and payable for the use of the followi ng structures
having length more than 60m at the following Fee Plaza(s), by converting the length of structures into an equivalent
length of highway by multiplying the length of such structures by an equalisation factor of 10: -
Table 4
Journey from Km. 2 7.400 to Km. 62.200 – Length 34.8 Km
Sr. No. Location of Fee Plaza (chainage) Length of
structures (in
km) to be
converted into
equivalent road
length Equivalent
road length (in
km) Rate at which fee
is payable
(1) (2) (3) (4) (5)
1 Design Km. 27.900 of NH-54 (new)
near Jogewala village, dist. Sirsa (Haryana) As per the distance
matrix at Table 4A 10 times of the
distance as per 100% of the base
rates mentioned in
2 Design Km. 30.400 of NH -54 (new)
near Dabwali village, dist. Sirsa (Haryana) below col. (3) Table -1 above for
6-lane access -
controlled NH
3 Design Km. 33.800 of NH -54 (new)
near Alika village, dist. Sirsa (Haryana)
4 Design Km. 41.125 of NH -54 (new)
near Shergarh village, dist. Sirsa (Haryana)
5 Design Km. 51.985 of NH -54 (new)
near Abubshehar village, dist. Sirsa (Haryana)
6 Design Km. 60.300 of NH -54 (new)
near Chautala village, dist. Sirsa (Haryana)
Table 4A
Distance Matrix for length of structures (>60m)
To Start of
section Jogewala Dabwali Alika Shergarh Abubshehar Chautala End of
section
From Km Km.
27.400 Km.
27.900 Km.
30.400 Km.
33.800 Km. 41.125 Km. 51.985 Km. 60.300 Km. 62.200
Start of
section Km.
27.400 0 0.0239 0.0672 0.0672 0.0672 0.1522 0.1522 0.1522
Jogewala Km
27.900 0.0239 0 0.0433 0.0433 0.0433 0.1283 0.1283 0.1283
Dabwali Km
30.400 0.0672 0.0433 0 0 0 0.0850 0.0850 0.0850
Alika Km.
33.800 0.0672 0.0433 0 0 0 0.0850 0.0850 0.0850
Shergarh Km
41.125 0.0672 0.0433 0 0 0 0.0850 0.0850 0.0850
Abubshehar Km.
51.985 0.1522 0.1283 0.0850 0.0850 0.0850 0 0 0
Chautala Km. .
60.300 0.1522 0.1283 0.0850 0.0850 0.0850 0 0 0
End of
section Km.
62.200 0.1522 0.1283 0.0850 0.0850 0.0850 0 0 0
^The details are as under: -
Chainage Type of Structure Length (in km) From (Km) To (Km)
27.8761 27.9433 VUP 0.0672
46.768 46.853 Major Bridge 0.0850
4. The various types of traffic moments for which the user Fee will be charge on the basis of actual distances
travelled is as under:
Table 5
S. No. Entry From (Name &
Chainage) Exit to (Name, Chainage & Distance)
A Left-hand Side (LHS)
1 Assumed at Start Of
Project (Km 27.400 ) i. Jogewala, Km 27.900 - (0.500KM)
ii. Dabwali Km 30.400 - (3.000KM)
iii. Chautala Km 60.300 - (32.900KM)
iv. Assumed at End of Project Km 62.200 - (34.800KM)
2 Jogewala(27.900KM) i. Dabwali Km 30.400 - (2.500 KM)
ii. Chautala Km 60.300 - (32.400 KM)
iii. Assumed at End of Project Km 62.200 - (34.300 KM)
3 Alika(33.800KM) i. Chautala Km 60.300 - (26.500 KM)
ii. Assumed at End of Project Km 62.200 - (28.400 Km)
4 Shergarh(41 .125KM) i. Chautala Km 60.300 - (19.175 Km)
ii. Assumed at End of Project Km 62.200 - (21.075 Km)
5 Abubshehar (51.985KM) i. Chautala Km 60.300 - (8.315 KM)
ii. Assumed at End of Project Km 62.200 - (10.215Km)
B Right -hand Side (RHS)
1 Assumed at End Of Project
(Km 6 2.200 ) i. Abubshehar Km 51.985 - (10.215 KM)
ii. Shergarh Km 41.125 - (21.075 KM)
iii. Alika Km 33.800 - (28.400 KM)
iv. Jogewala, Km 27.900 - (34.300 KM)
v. Assumed at Start of Project Km 27.400 - (34.800KM)
2 Chautala (60.300 KM) i. Abubshehar Km 51.985 - (8.315 KM)
ii. Shergarh Km 41.125 - (19.175 KM)
iii. Alika Km 33.800 - (26.500 KM)
iv. Jogewala, Km 27.900 - (32.400 KM)
v. Assumed at Start of Project Km 27.400 - (32.900 KM)
3 Dabwali(30.400 KM) i. Jogewala, Km 27.900 - (2.500 KM)
ii. Assumed at Start of Project Km 27.400 - (03.000KM)
4 Jogewal a(27.900 KM) Assumed at Start of Project Km 27.400 - (0.500 KM)
5. For multiple journeys on the highway section, passes shall be issued at the following rates, namely: -
Table 6
Amount Payable Maximum number of one -way journeys
allowed Period of validit y
One and half times of the fee for one way
journey* Two Twenty -four hours from the
time of payment
Two-third of amount of the fee payable for
fifty single journeys.* Fifty One month from date of
payment
* Provided that the user uses the same entry an d exit fee plazas while performing the return journey.
6. The driver or owner or a person in charge of a mechanical vehicle which is loaded in excess of permissible load
specified for its category, shall be liable to pay fee for entering the overloaded veh icle on the National Highway to the
fee collecting agency, equal to the fee specified in sub -rule 1A of rule 10 of the said rules, and shall not be entitled to
make use of the highway section unless the excess load has been removed from such mechanical veh icle.
7. Vehicles with valid functional FAStag will be allowed on the access -controlled highway. A fee equal to two
times of the fee payable to that category will be levied from the vehicles who are not having valid functional FAStag,
non- FAStag v ehicles, low balance, Blacklisted FAStag etc.
8. All definitions including category of mechanical vehicles, its permissible load, category of exempted vehicles,
service road, alternative road, etc. shall be as per definitions specified in the said rules.
9. The fee rates shall be displayed for information of the users in accordance with rule 12 of the said rules.
10. Based on the base rate of fee per kilometer for the base year 2007 -08 as mentioned in Table -1 above, the actual
amount o f fee to be charged from the mechanical vehicles and the discounts will be calculated by the Authority on the
basis of the completed length of the section and revised annually in accordance with the rule 5 of the said rules and the
same shall be published in at least one newspaper in English and vernacular language.
11. The estimated capital cost of the project is Rupees 1381.83 crore . The capital cost is subject to variation as the
activities of land acquisition, utility shifting, tree cutting, etc. are yet to be completed. The Authority shall maintain a
record of the recovery of capital cost through user fee realised.
[F. No. NHAI/PIU -Hissar/25286/DAB -CHT/FeeNotification/E -233652]
SUMAN PRAS AD SINGH, Jt. Secy .
Uploaded by Dte. of Printing at Government of India Press, Ring R oad, Mayapuri, New Delhi -110064
and Published by the Controller of Publications, Delhi -110054.
Login to read full text