Gazette Tracker
Gazette Tracker

Core Purpose

This notification levies fees for specific types of vehicles on designated sections of National Highway No. 88 (New NH-103, NH-3, NH-303, NH-503) in Himachal Pradesh and authorizes the National Highways Authority of India to collect these fees.

Detailed Summary

The Ministry of Road Transport and Highways, through Notification S.O. 3002(E) dated June 11, 2026, has levied fees on various sections of National Highway No. 88 in Himachal Pradesh, superseding Notification No. S.O. 2005 (E) dated May 2, 2025. This action is taken under Section 7 of the National Highways Act, 1956 (48 of 1956), read with Rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008. The fee collection is authorized for the National Highways Authority of India at the Fee Plaza located at Design Km 181+700 of NH-88 (New NH-503) near Ghatta Village in Kangra district. The sections covered include Hamirpur bypass (Kohli to Chil Bahal, Design Km. 121+175 to Km. 138+295 of New NH-103), Chil Bahal to Bhangbar (near Ranital, Design Km. 138+295 to Km. 175.270 of New NH-3, 303), and Bhangbar (near Ranital) to Kangra Bypass (Design Km. 175.270 to Km. 193.400 of New NH-303, 503). Fees are structured based on road configuration and length, applying 100% of the base rate for 13.41 km of four-lane or higher road and 19.06 km of four-lane structures (>60m); 150% of the base rate for 2.815 km of four-lane bypasses; 60% of the base rate for 26.835 km of two-lane with paved shoulders and 11.63 km of two-lane structures (>60m); and 90% of the base rate for 26.096 km of two-lane + PS bypasses. Base rates for the year 2007-08 range from Rs 0.65 for Car/Jeep/Van/Light Motor Vehicle to Rs 4.20 for Oversized Vehicles (seven or more axles). Additional fees apply to bypasses costing Rs 10 crore or more, including Hamirpur Bypass (16.628 km, Rs 397.50 Cr), Nadaun Bypass (3.108 km, Rs 87.58 Cr), Jwalamukhi Bypass (6.360 km, Rs 85.52 Cr), and Kangra Bypass (2.815 km, Rs 150.00 Cr). Fees for structures over 60m are calculated by converting their length to an equivalent road length using an equalisation factor of 10. A monthly pass for non-commercial vehicles owned by residents within 20 km of the fee plaza is Rs 350 for 2026-27, subject to annual revision as per the rules. Discounts are available for multiple journeys and commercial vehicles registered in the fee plaza's district (50% if no alternative road). Overloaded vehicles are liable to pay a fee as specified in Rule 10. The estimated capital cost of the project is Rupees 3246.57 crore. The notification also references a previous notification, S.O. 2949 (E) dated September 15, 2016, issued under Section 11 of the National Highway Authority of India Act, 1988 (68 of 1988), which entrusted the Shimla – Mataur stretch of NH-88 to the Authority.

Full Text

REGD. No. D. L.-33004/99 The Gazette of India CG-DL-E-11062026-273371 EXTRAORDINARY PART II—Section 3—Sub-section (ii) PUBLISHED BY AUTHORITY No. 2904] NEW DELHI, THURSDAY, JUNE 11, 2026/JYAISTHA 21, 1948 [F. No. HPDIV-20013/31/2025-PIU Hamirpur/E-266844] MINISTRY OF ROAD TRANSPORT AND HIGHWAYS NOTIFICATION New Delhi, the11th June, 2026 S.O. 3002(E). - Whereas by notification of the Government of India in the Ministry of Road Transport and Highways number S.O. 2949 (E) dated the 15th September 2016 issued under Section 11 of the National Highway Authority of India Act 1988 (68 to 1988), the Central Government has entrusted the stretch from Km. 0.00 to Km. 223.70 (Shimla – Mataur) of National Highway No. 88 in the state of Himachal Pradesh to the National Highways Authority of India (hereinafter referred to as the "Authority"); Now, therefore, in exercise of the powers conferred by section 7 of the National Highways Act, 1956 (48 of 1956), read with rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008 (hereinafter referred to as the "rules"), and in supersession of Notification No. S.O. 2005 (E) dated 02.05.2025, the Central Government hereby levies the fee at the rate specified in column (2) of the Table 1 for a net road section length of 13.41 km [Table 2], applicable for four-lane or higher configurations and for total equivalent length of four lane structure (having more than 60m length) of 19.06 Km [Table 4] (having total length of 1.906 Km [Table 4]), and at 150% of base rate for four lane bypasses with a net road length of 2.815 km [Table 3], and at 60% of base rate for two lane and paved shoulders for a net road length of 26.835 km [Table 2], and for total equivalent length of two lane structure (having more than 60m length) of 11.63 Km [Table 4] (having total length of 1.163 Km, [Table 4]), and at 90% of base rate for two lane + PS bypasses with a net road length of 26.096 km [Table 3], on the type of vehicles specified in column(1) of the Table-1 below, of highway starting from Hamirpur bypass (Green Field Alignment) starting from Kohli to Chil Bahal from Design Km. 121+175 to Km. 138+295 of National Highway No. 88 (New NH-103), Chil Bahal to Bhangbar (near Ranital) NH section from Design Km. 138+295 to Km. 175.270 of National Highway No. 88 (New NH-3, 303) and Bhangbar (near Ranital) to Kangra Bypass up to intersection with NH-154, NH section from Design Km. 175.270 to Km. 193.400 of National Highway No. 88 (New NH-303, 503) in the state of Himachal Pradesh and authorises the Authority to collect, either through its officials or through a contractor, the said fee, namely:- Table-1 +-------------------------------------------------------------+---------------------------------------------------------+ | Type of vehicle | Base rate of fee per km for the base year 2007-08 (in Rupees) | +=============================================================+=========================================================+ | (1) | (2) | +-------------------------------------------------------------+---------------------------------------------------------+ | Car, Jeep, Van or Light Motor Vehicle | 0.65 | | Light Commercial Vehicle, Light Goods Vehicle or Mini Bus | 1.05 | | Bus or Truck (Two Axles) | 2.20 | | Three-axle commercial vehicles | 2.40 | | Heavy Construction Machinery (HCM) or Earth Moving Equipment| 3.45 | | (EME) or Multi Axle Vehicle (MAV) (four to six axles) | | | Oversized Vehicles (seven or more axles) | 4.20 | +-------------------------------------------------------------+---------------------------------------------------------+ 1. The fee to be levied and collected hereunder shall be due and payable at the Fee Plaza for net road length specified for such Fee Plaza namely: - Table-2 +--------------------------------------------------------------------------------------------------------------------+--------------------------------------------------------------------------------------------------------------------+------------------------------------------------------------------+ | Location of Fee Plaza (chainage) | Length (in km) for which Fee is payable | Rate at which fee is payable | +====================================================================================================================+====================================================================================================================+==================================================================+ | At Design Km 181+700 of NH-88 (New NH-503) near Ghatta Village in Kangra district of Himachal Pradesh | 13.41 (Excluding length of Bypass (costing 10 Cr.) and length of structures (>60m)) | 100% for four or more lane of the base rates mentioned in Table-1 above | | | 26.835 (Excluding length of Bypass (costing 10 Cr.) and length of structures (>60m)) | 60% for two lane with paved shoulders, of the base rates mentioned in Table-1 above | +--------------------------------------------------------------------------------------------------------------------+--------------------------------------------------------------------------------------------------------------------+------------------------------------------------------------------+ 2. In addition to above, the following fee shall also be due and payable for the use of the bypass costing Rs 10 crore or more at the following Fee Plaza for net bypass length specified for such Fee Plaza(s): - Table-3 +-----------------------------------------------------+------------------+------------+-------------+-------------------------------------------------+------------------+------------------------------------------------------------------+ | Location of Fee Plaza (Chainage) | Name of the Bypass | Taking off | Merging at | Length and cost of Bypass which additional fee | Cost (in Crore) | Rate at which fee is payable | | | | | | is payable Length in Km | | | +=====================================================+==================+============+=============+=================================================+==================+==================================================================+ | At Design Km 181+700 of NH-88 (New NH-503) near | Hamirpur Bypass | Design Km. | Design km. | 16.628 (Excluding length of structures (>60m)) | 397.50 | 90% for two lane with paved shoulders, of the base rates | | Ghatta Village in Kangra district of Himachal | | 121+175 | 138+295 | | | mentioned in Table-1 above | | Pradesh | | | | | | | +-----------------------------------------------------+------------------+------------+-------------+-------------------------------------------------+------------------+------------------------------------------------------------------+ | | Nadaun Bypass | Design Km. | Design | 3.108 (Excluding length of structures (>60m)) | 87.58 | 150% for four and more lane of the base rates mentioned in | | | | 146+440 | Km. 149+970 | | | Table-1 above | | | Jwalamukhi Bypass| Design Km. | Design Km. | 6.360 (Excluding length of structures (>60m)) | 85.52 | | | | | 157+200 | 163+560 | | | | | | Kangra Bypass | Design Km. | Design Km. | 2.815 (Excluding length of structures (>60m)) | 150.00 | | | | | 187+000 | 191+500 | | | | +-----------------------------------------------------+------------------+------------+-------------+-------------------------------------------------+------------------+------------------------------------------------------------------+ | Total | | | | 28.911 | | | +-----------------------------------------------------+------------------+------------+-------------+-------------------------------------------------+------------------+------------------------------------------------------------------+ 3. In addition to above, the following fee shall also be due and payable for the use of the following structures having length more than 60m at the following Fee Plaza(s), by converting the length of structures into an equivalent length of highway by multiplying the length of such structures by an equalisation factor of 10: - Table-4 +--------------------------------------------------------------------------------------------------------------------+-----------------------------------------------------+------------------------+------------------------------------------------------------------+ | Location of Fee Plaza (Chainage) | Length of Structure (in km) to be converted into | Equivalent road length | Rate at which fee is payable | | | equivalent road length | (in km) | | +====================================================================================================================+=====================================================+========================+==================================================================+ | At Design Km 181+700 of NH-88 (New NH-503) near Ghatta Village in Kangra district of Himachal Pradesh | 1.163^ | 11.63 | 60% for two lane with paved shoulders, of the base rates mentioned in Table-1 above | | | 1.906^^ | 19.06 | 100% for four and more lanes of the base rates mentioned in Table-1 above | +--------------------------------------------------------------------------------------------------------------------+-----------------------------------------------------+------------------------+------------------------------------------------------------------+ ^The Details are as under: - Structure having length more than 60m +--------+--------------------------+-----------------+--------------+ | Sr. No.| Structure (Chainage km.) | Type of Structure | Length (km.) | +========+==========================+=================+==============+ | 1 | 124.605 124.823 | 2 Lane MJB | 0.218 | | 2 | 131.752 131.912 | 2 Lane MJB | 0.160 | | 3 | 134.725 134.839 | 2 Lane MJB | 0.114 | | 4 | 142.078 142.148 | 2 Lane MJB | 0.070 | | 5 | 148.494 148.915 | 2 Lane MJB | 0.421 | | 6 | 168.521 168.701 | 2 Lane MJB | 0.180 | +--------+--------------------------+-----------------+--------------+ | Total | | | 1.163 | +--------+--------------------------+-----------------+--------------+ ^^The Details are as under: - Structure having length more than 60m +--------+--------------------------+-----------------------+--------------+ | Sr. No.| Structure (Chainage km.) | Type of Structure | Length (km.) | +========+==========================+=======================+==============+ | 1 | 180.339 180.494 | 4 Lane MJB | 0.155 | | 2 | 181.975 182.041 | 4 Lane MJB | 0.066 | | 3 | 187.100 187.693 | 4 Lane Tunnel | 0.593 | | 4 | 188.820 188.975 | 4 Lane MJB | 0.155 | | 5 | 189.479 189.639 | 4 Lane Viaduct | 0.160 | | 6 | 189.859 190.111 | 4 Lane MJB | 0.252 | | 7 | 190.891 190.961 | 4 Lane MJB | 0.070 | | 8 | 190.993 191.448 | 4 Lane ROB cum Viaduct| 0.455 | +--------+--------------------------+-----------------------+--------------+ | Total | | | 1.906 | +--------+--------------------------+-----------------------+--------------+ 4. The rate of monthly pass for a person who owns a mechanical vehicle registered for non-commercial purposes and resides within a distance to twenty kilometers from the fee plaza is Rs 350 (Rupees Three hundred and Fifty only) for the year 2026-27 and is subject to revision every year as per the provision of the said rules. 5. For multiple journeys on the highway section, passes shall be issued at the following rates, namely: - Table-5 +-------------------------------------------------+---------------------------------------------+----------------------------------------------+ | Amount Payable | Maximum number of one-way journeys allowed | Period of validity | +=================================================+=============================================+==============================================+ | One and half times of the fee for one way journey | Two | Twenty-four hours from the time of payment | | Two-third of amount of the fee payable for fifty single journeys | Fifty | One month from date of payment | +-------------------------------------------------+---------------------------------------------+----------------------------------------------+ 6. Fee for commercial vehicle (excluding vehicles plying under National permit) registered in the district where the fee plaza falls shall be 50% of the specified rate for that category of vehicle provided no service road or alternative road is available for use of such commercial vehicles. 7. The driver or owner or a person in charge of a mechanical vehicle which is loaded in excess of permissible load specified for its category, shall be liable to pay fee for entering the overloaded vehicle on the National Highway to the fee-collecting agency, equal to the fee specified in rule 10 of the said rules. 8. All definitions including category of mechanical vehicles, its permissible load, category of exempted vehicles, service road, alternative road, etc. shall be as per definitions specified in the said rules. 9. The fee rates shall be displayed for information of the users in accordance with rule 12 of the said rules. 10. Based on the base rate of fee per kilometre for the base year 2007-08 as mentioned in Table-1 above, the actual amount of fee to be charged from the mechanical vehicles and the discounts will be calculated by the Authority on the basis of the completed length of the section and revised annually in accordance with the rule 5 of the said rules and the same shall be published in at least one newspaper in English and vernacular language. 11. The estimated capital cost of the project is Rupees 3246.57 crore. The capital cost is subject to variation as the activities of land acquisition, utility shifting, tree cutting, etc. are yet to be completed. The Authority shall maintain a record of the recovery of capital cost through user fee realised. [F. No. HPDIV-20013/31/2025-PIU Hamirpur/E-266844] CHETNA NAND SINGH, Jt. Secy. Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.

Never miss important gazettes

Create a free account to save gazettes, add notes, and get email alerts for keywords you care about.

Sign Up Free