Gazette Tracker
Gazette Tracker

Core Purpose

Bureau of Indian Standards notifies the establishment of new Indian standards and withdrawal of existing standards, effective January 29, 2025 and July 29, 2025 respectively.

Detailed Summary

The Bureau of Indian Standards (BIS) issues a notification regarding the establishment of several new Indian Standards and the withdrawal of corresponding older versions. These standards cover diverse fields such as geological mapping symbols, hydrometry calibration, water well pumping tests, and fluid flow measurement methodologies using various devices like Venturi tubes, orifice plates, and Pitot static tubes. The newly established standards are effective from January 29, 2025, while the listed older standards will be withdrawn from July 29, 2025, remaining concurrently in force until then. This notification is issued in pursuance of Sub-rule (1) of Rule (15) of the Bureau of Indian Standards Rules, 2018.

Full Text

REGD. No. D. L.-33004/99 The Gazette of India CG-DL-E-11022025-260891 EXTRAORDINARY PART III—Section 4 PUBLISHED BY AUTHORITY No. 98] NEW DELHI, MONDAY, FEBRUARY 10, 2025/MAGHA 21, 1946 HQ-PUB013/1/2020-PUB-BIS (1154) 995 GI/2025 BUREAU OF INDIAN STANDARDS (Department of Consumer Affairs) NOTIFICATION New Delhi, the 30th January 2025 Ref: HQ-PUB013/1/2020-PUB-BIS (1154)- In pursuance of Sub-rule (1) of Rule (15) of the Bureau of Indian Standards Rules, 2018, the Bureau of Indian Standards hereby notifies that Indian standards, particulars of which are given in the second column of the schedule hereto annexed have been established on the date indicated against it in third column. The particulars of the standards, if any which are given in the fourth column shall also remain in force concurrently till they are withdrawn on the date indicated against them in the fifth column. SCHEDULE +-----+-----------------------------------+----------------+-----------------------------------+----------------+ | Sl. | No., Year & Title of the | Date of | No., Year & Title of the | Date of | | No. | Indian Standards | Establishment | Indian Standards to be | withdrawal | | | Established | | withdrawn, if any | | +=====+===================================+================+===================================+================+ | (1) | (2) | (3) | (4) | (5) | +-----+-----------------------------------+----------------+-----------------------------------+----------------+ | 1 | IS 7422 (Part 5) : 2025 | 29 January 2025| IS 7422 (Part 5) : 1992 | 29 July 2025 | | | Symbols and Abbreviations for | | Symbols and Abbreviations | | | | Use in Geological Maps, | | for Use in Geological Maps, | | | | Sections and Subsurface | | Sections and Sub-Surface | | | | Exploratory Logs Part 5 Line | | Exploratory Logs | | | | Symbols for Formation | | Part 5 Line Symbols for | | | | Contacts and Structural | | Formation Contacts and | | | | Features | | Structural Features | | | | (First Revision) | | (First Revision) | | +-----+-----------------------------------+----------------+-----------------------------------+----------------+ | 2 | IS 13371: 2025 | 29 January 2025| IS 13371: 2014 | 29 July 2025 | | | ISO 3455: 2021 | | ISO 3455: 2007 | | | | Hydrometry Calibration of | | Hydrometry - Calibration of | | | | Current-Meters in Straight | | Current-Meters in Straight | | | | Open Tanks | | Open Tanks | | | | (Second Revision) | | (First Revision) | | +-----+-----------------------------------+----------------+-----------------------------------+----------------+ | 3 | IS 14476 (Part 1 to 9) : 2025 | 29 January 2025| IS 14476 (Part 1 to 9) : 1998 | 29 July 2025 | | | Pumping Test of Water Wells | | Test Pumping of Water Wells | | | | -Code of Practice | | -Code of Practice | | | | (First Revision) | | (First Revision) | | +-----+-----------------------------------+----------------+-----------------------------------+----------------+ | 4 | IS 14615 (Part 1) : 2025 | 29 January 2025| IS 14615 (Part 1) : 2018 | 29 July 2025 | | | ISO 5167-1: 2022 | | ISO 5167-1:2003 | | | | Measurement of Fluid Flow by | | Measurement of Fluid Flow | | | | Means of Pressure Differential | | by Means of Pressure | | | | Devices Inserted in Circular | | Differential Devices Inserted | | | | Cross Section Conduits | | in Circular Cross-Section | | | | Running Full | | Conduits Running Full | | | | Part 1 General Principles and | | Part 1 General Principles and | | | | Requirements | | Requirements | | | | (Second Revision) | | (First Revision) | | +-----+-----------------------------------+----------------+-----------------------------------+----------------+ | 5 | IS 14615 (Part 2) : 2025 | 29 January 2025| IS 14615 (Part 2) : 2018 | 29 July 2025 | | | ISO 5167-2: 2022 | | ISO 5167-2: 2003 | | | | Measurement of Fluid Flow by | | Measurement of Fluid Flow | | | | Means of Pressure Differential | | by Means of Pressure | | | | Devices Inserted in Circular | | Differential Devices Inserted | | | | Cross Section Conduits | | in Circular Cross-Section | | | | Running Full | | Conduits Running Full | | | | Part 2 Orifice Plates | | Part 2 Orifice Plates | | +-----+-----------------------------------+----------------+-----------------------------------+----------------+ | 6 | IS 14615 (Part 4) : 2025 | 29 January 2025| IS 14615 (Part 4): 2018 | 29 July 2025 | | | ISO 5167-4: 2022 | | ISO 5167-4: 2003 | | | | Measurement of Fluid Flow by | | Measurement of Fluid Flow | | | | Means of Pressure Differential | | by Means of Pressure | | | | Devices Inserted in Circular | | Differential Devices Inserted | | | | Cross Section Conduits | | in Circular Cross-Section | | | | Running Full | | Conduits Running Full | | | | Part 4 Venturi Tubes | | Part 4 Venturi Tubes | | | | (First Revision) | | (First Revision) | | +-----+-----------------------------------+----------------+-----------------------------------+----------------+ | 7 | IS 14869: 2025 | 29 January 2025| IS 14869: 2016 | 29 July 2025 | | | ISO 4359: 2022 | | ISO 4359: 2013 | | | | Flow Measurement Structures | | Flow Measurement Structures | | | | Rectangular, Trapezoidal | | Rectangular, Trapezoidal | | | | and U-Shaped Flumes | | and U-Shaped Flumes | | | | (Second Revision) | | (First Revision) | | +-----+-----------------------------------+----------------+-----------------------------------+----------------+ | 8 | IS 14973: 2025 | 29 January 2025| IS 14973: 2019 | 29 July 2025 | | | ISO 3966: 2020 | | ISO 3966: 2008 | | | | Measurement of Fluid Flow in | | Measurement of Fluid Flow | | | | Closed Conduits - Velocity | | in Closed Conduits | | | | Area Method Using Pitot | | Velocity Area Method Using | | | | Static Tube | | Pitot Static Tube | | | | (Second Revision) | | (First Revision) | | +-----+-----------------------------------+----------------+-----------------------------------+----------------+ CHITRA GUPTA,Scientist G & DDG (Hallmarking and Training) [ADVT.-III/4/Exty./955/2024-25] Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.

Never miss important gazettes

Create a free account to save gazettes, add notes, and get email alerts for keywords you care about.

Sign Up Free