Notification by the Ministry of Road Transport and Highways under Section 7 of the National Highways Act, 1956 levying and authorising collection of user fee on mechanical vehicles for the Meerut-Najibabad section of National Highway No. 34 (Old NH 119) in Uttar Pradesh.

Detailed Summary

By notification S.O. 592(E) dated 8th February 2024, the Ministry of Road Transport and Highways recorded that under earlier notification S.O. 5056(E) dated 28th November 2023 (issued under Section 11 of the National Highway Authority of India Act, 1988), the Central Government had entrusted the entire NH-119 (New NH-34/NH-534) from km 11.5 to km 138.635 in Uttar Pradesh to the National Highways Authority of India (the Authority), and now, in exercise of powers under Section 7 of the National Highways Act, 1956 (48 of 1956) read with Rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008, levied fee on mechanical vehicles for a net road section length of 41.152 km, equivalent structure length of 2.800 km, and bypasses totalling 12.518 km costing rupees ten crore or more, covering the four-or-more-lane Meerut-Najibabad section of NH-34 (Old NH 119) in Uttar Pradesh, and authorised the Authority to collect the fee itself or through a contractor. Base-year (2007-08) rates per km ranged from Rs 0.65 for cars/jeeps/vans/light motor vehicles to Rs 4.20 for oversized vehicles with seven or more axles, payable at two fee plazas: at Design km 27.900 (Chota Mawana Village, Meerut District) for 25.602 km, and at Design km 98.000 (Bhanera Village, Bijnor District) for 15.550 km, with an additional 150% fee for use of the Masoorie Bypass (2.000 km, costing Rs 101.88 crore), Swaheri Bypass (3.550 km, Rs 135.69 crore) and Kiratpur Bypass (6.968 km, Rs 307.97 crore), plus additional fee at 100% for structures exceeding 60m converted to equivalent road length using an equalisation factor of 10; a monthly pass for non-commercial vehicle owners residing within twenty kilometres of the fee plaza was set at Rs 330.000 for 2023-24, subject to annual revision.

Full Text

REGD. No. D. L.-33004/99 The Gazette of India CG-DL-E-10022024-251989 EXTRAORDINARY PART II-Section 3-Sub-section (ii) PUBLISHED BY AUTHORITY No. 561] NEW DELHI, FRIDAY, FEBRUARY 9, 2024/MAGHA 20, 1945 MINISTRY OF ROAD TRANSPORT AND HIGHWAYS NOTIFICATION New Delhi, the 8th February, 2024 S.O. 592(E).- Whereas by notification of the Government of India in the Ministry of Road Transport and Highways number S.O. 5056(E) dated 28th November 2023 issued under Section 11 of the National Highway Authority of India Act 1988 ( 68 to 1988), the Central Government has entrusted Entire NH -119 ( New NH-34 and NH-534) from km 11.5 to km 138.635 in the state of Uttar Pradesh to the National Highways Authority of India (hereinafter referred to as the “Authority"); Now, therefore, in exercise of the powers conferred by section 7 of the National Highways Act, 1956 (48 of 1956), read with rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008 (hereinafter referred to as the “rules”), the Central Government hereby levies the fee on mechanical vehicles at the rate specified in column (2) of the Table 1 for net road section length of 41.152 km and for equivalent structure length (having length more than 60m) of 2.800 km (having length of 0.280 km) and at one and one half times the base rate for bypasses having length of 12.518 km costing rupees ten crore or more on the type of vehicles specified in column (1) of the Table 1 below for the use of four or more lane of Meerut-Najibabad section from design kilometer 11.500 to kilometer 39.250 (existing Km 11.500 to Km 39.240) and from design kilometer 79.500 to kilometer 105.700 (existing Km 86.590 to Km 112.545)of National Highway number 34 (Old NH 119) in the State of Uttar Pradesh and authorises the Authority to collect, either through its officials or through a contractor, the said fee, namely:- Table-1 +-------------------------------------------------------------------------+----------------------------------------------------------+ | Type of vehicle | Base rate of fee per km for the base year 2007-08 (in Rupees) | +=========================================================================+==========================================================+ | (1) | (2) | +-------------------------------------------------------------------------+----------------------------------------------------------+ | Car, Jeep, Van or Light Motor Vehicle | 0.65 | +-------------------------------------------------------------------------+----------------------------------------------------------+ | Light Commercial Vehicle, Light Goods Vehicle or Mini Bus | 1.05 | +-------------------------------------------------------------------------+----------------------------------------------------------+ | Bus or Truck (Two Axles) | 2.20 | +-------------------------------------------------------------------------+----------------------------------------------------------+ | Three-axle commercial vehicles | 2.40 | +-------------------------------------------------------------------------+----------------------------------------------------------+ | Heavy Construction Machinery (HCM) or Earth Moving Equipment (EME) or | 3.45 | | Multi Axle Vehicle (MAV) (four to six axles) | | +-------------------------------------------------------------------------+----------------------------------------------------------+ | Oversized Vehicles (seven or more axles) | 4.20 | +-------------------------------------------------------------------------+----------------------------------------------------------+ 1. The fee to be levied and collected hereunder shall be due and payable at the Fee Plaza for net road length specified for such Fee Plaza namely: - Table-2 +---------------------------------------------------------------------------------------------------------------------+-----------------------------------------------------------------------------------------+---------------------------------------------------------------------+ | Location of Fee Plaza (chainage) | Length (in km) for which Fee is payable | Rate at which fee is payable | +=====================================================================================================================+=========================================================================================+=====================================================================+ | At Design km 27.900 (existing chainage 27.380) at Chota Mawana Village of Meerut District in Uttar Pradesh State. | 25.602 [Excluding length of Bypass (costing >10 Cr.) and length of structures (>60m)] | 100% for four or more lane of the base rates mentioned in Table-1 above | +---------------------------------------------------------------------------------------------------------------------+-----------------------------------------------------------------------------------------+---------------------------------------------------------------------+ | At Design km 98.000 (existing chainage 104.850) at Bhanera Village of Bijnor District in Uttar Pradesh State. | 15.550 [Excluding length of Bypass (costing >10 Cr.) and length of structures (>60m)] | 100% for four or more lane of the base rates mentioned in Table-1 above | +---------------------------------------------------------------------------------------------------------------------+-----------------------------------------------------------------------------------------+---------------------------------------------------------------------+ 2. In addition to above, the following fee shall also be due and payable for the use of the bypass costing Rs 10 crore or more at the following Fee Plaza for net bypass length specified for such Fee Plaza: - Table-3 +---------------------------------------------------------------------------------------------------------------------+---------------------------------+---------------------------------------------+-------------------------------------------+---------------------------------------+---------------------------------------------------------------------+ | Location of Fee Plaza (chainage) | Name of the Bypass | Taking Off | Merging at | Length and Cost of bypass for which | Rate at which fee is payable | | | | | | additional fee is payable | | | | | | |-----------------------+---------------+-------------------------------------+ | | | | | Length (in Km.) | Cost (inRs. Crore) | | +=====================================================================================================================+=================================+=============================================+===========================================+=======================+===============+=====================================================================+ | At Design km 27.900 (existing chainage 27.380) at Chota Mawana Village of Meerut District in Uttar Pradesh State. | Masoorie Bypass of NH - 34 | Design km 19.800 (existing km 19.800) | Design km 21.800 (existing km 21.570) | 2.000 | 101.88 | 150% for four or more lane of the base rates mentioned in Table-1 above | +---------------------------------------------------------------------------------------------------------------------+---------------------------------+---------------------------------------------+-------------------------------------------+-----------------------+---------------+---------------------------------------------------------------------+ | At Design km 98.000 (existing chainage 104.850) at Bhanera Village of Bijnor District in Uttar Pradesh State. | Swaheri Bypass of NH - 34 | Design km 83.150 (existing km 90.240) | Design km 86.700 (existing km 93.510) | 3.550 | 135.69 | 150% for four or more lane of the base rates mentioned in Table-1 above | +---------------------------------------------------------------------------------------------------------------------+---------------------------------+---------------------------------------------+-------------------------------------------+-----------------------+---------------+---------------------------------------------------------------------+ | | Kiratpur Bypass of NH - 34 | Design km 88.200 (existing km 95.000) | Design km 95.300 (existing km 102.150) | 6.968 | 307.97 | 150% for four or more lane of the base rates mentioned in Table-1 above | +---------------------------------------------------------------------------------------------------------------------+---------------------------------+---------------------------------------------+-------------------------------------------+-----------------------+---------------+---------------------------------------------------------------------+ 3. In addition to above, the following fee shall also be due and payable for the use of the following structures having length more than 60m at the following Fee Plaza(s), by converting the length of structures into an equivalent length of highway by multiplying the length of such structures by an equalisation factor of 10: - Table-4 +---------------------------------------------------------------------------------------------------------------------+-------------------------------------------------------------------------------------+-----------------------------------+---------------------------------------------------------------------+ | Location of Fee Plaza (chainage) | Length of structures^ (in km) to be converted into equivalent road length | Equivalent road length (in km) | Rate at which fee is payable | +=====================================================================================================================+=====================================================================================+===================================+=====================================================================+ | At Design km 27.900 (existing chainage 27.380) at Chota Mawana Village of Meerut District in Uttar Pradesh State | 0.148^ | 1.480 | 100% for four or more lane of the base rates mentioned in Table-1 above | +---------------------------------------------------------------------------------------------------------------------+-------------------------------------------------------------------------------------+-----------------------------------+---------------------------------------------------------------------+ | At Design km 98.000 (existing chainage 104.850) at Bhanera Village of Bijnor District in Uttar Pradesh State | 0.132^^ | 1.320 | 100% for four or more lane of the base rates mentioned in Table-1 above | +---------------------------------------------------------------------------------------------------------------------+-------------------------------------------------------------------------------------+-----------------------------------+---------------------------------------------------------------------+ ^The detail is as under: +-----------+---------+-------------------+----------------+ | Chainage | Type of Structure | Length (in km) | |-----------+---------| | | | From Km | To Km | | | +===========+=========+===================+================+ | 15.264 | 15.336 | Major Bridge | 0.072 | +-----------+---------+-------------------+----------------+ | 35.602 | 35.678 | Major Bridge | 0.076 | +-----------+---------+-------------------+----------------+ | | Total | | 0.148 | +-----------+---------+-------------------+----------------+ ^^ The detail is as under: +-----------+---------+-------------------+----------------+ | Chainage | Type of Structure | Length (in km) | |-----------+---------| | | | From Km | To Km | | | +===========+=========+===================+================+ | 90.184 | 90.316 | Major Bridge | 0.132 | +-----------+---------+-------------------+----------------+ | | Total | | 0.132 | +-----------+---------+-------------------+----------------+ 4. The rate of monthly pass for a person who owns a mechanical vehicle registered for non-commercial purposes and resides within a distance of twenty kilometres from the fee plaza is Rs 330.000 (Three Hundred and Thirty Only) for the year 2023-24 and is subject to revision every year as per the provisions of the said rules. 5. For multiple journeys on the highway section, passes shall be issued at the following rates, namely: - Table-5 +-------------------------------------------------------------+-----------------------------------------------+------------------------------------------+ | Amount Payable | Maximum number of one way journeys allowed | Period of validity | +=============================================================+===============================================+==========================================+ | One and one-half times of the fee for one way journey | Two | Twenty four hours from the time of payment | +-------------------------------------------------------------+-----------------------------------------------+------------------------------------------+ | Two-third of amount of the fee payable for fifty single journeys | Fifty | One month from date of payment | +-------------------------------------------------------------+-----------------------------------------------+------------------------------------------+ 6. Fee for commercial vehicle (excluding vehicles plying under National permit) registered in the district where the fee plaza falls shall be 50% of the specified rate for that category of vehicle provided no service road or alternative road is available for use of such commercial vehicles. 7. The driver or owner or a person in charge of a mechanical vehicle which is loaded in excess of permissible load specified for its category, shall be liable to pay fee for entering the overloaded vehicle on the National Highway to the fee collecting agency, equal to the fee specified in sub-rule 1A of rule 10 of the said rules, and shall not be entitled to make use of the highway section unless the excess load has been removed from such mechanical vehicle. 8. All definitions including category of mechanical vehicles, its permissible load, category of exempted vehicles, service road, alternative road, etc. shall be as per definitions specified in the said rules. 9. The fee rates shall be displayed for information of the users in accordance with rule 12 of the said rules. 10. Based on the base rate of fee per kilometer for the base year 2007-08 as mentioned in Table-1 above, the actual amount of fee to be charged from the mechanical vehicles and the discounts will be calculated by the Authority on the basis of the completed length of the section and revised annually in accordance with the rule 5 of the said rules and the same shall be published in at least one newspaper in English and vernacular language. 11. The estimated capital cost of the project is Rupees 1622 crore. The capital cost is subjected to variation as the activities of land acquisition, utility shifting, tree cutting, etc. are yet to be completed. The Authority shall maintain a record of the recovery of capital cost through user fee realised. [F. No. NHAI/13013/CO/23-24/Fee Notification/Meerut-Najibabad Section/ (km11.50-km 39.250) & (km79.500-km105.700)/E-228678] SUMAN PRASAD SINGH, Jt. Secy.

Never miss important gazettes

Create a free account to save gazettes, add notes, and get email alerts for keywords you care about.

Sign Up Free