Amendment under Section 7 of the National Highways Act, 1956 read with Rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008 revising the toll fee notification S.O. 280(E) dated 20th January 2021 for the Muzaffarnagar-Haridwar section of NH-58 (NH-334) to reflect construction of the Dudhadhari Elevated Flyover.

Detailed Summary

Under S.O. 1168(E) and exercising powers under Section 7 of the National Highways Act, 1956 (48 of 1956) read with Rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008, the Ministry of Road Transport and Highways amends its earlier toll notification S.O. 280(E) dated 20th January 2021 (which had authorised the National Highways Authority of India to collect fees on the Muzaffarnagar-Haridwar section of NH-58/NH-334 in Uttarakhand) to reflect the Authority's subsequent EPC-mode construction of the Dudhadhari Elevated Flyover from Km 206.400 to Km 208.320: the net road section length is revised from 24.471 km to 22.651 km, the equivalent structure length is revised from 19.00 km (having length 1.900 km) to 37.20 km (having length 3.720 km), a detailed table of 14 bridges and grade separators along the corridor (from Km 167.235-167.335 to Km 206.400-208.320) is substituted, and the estimated capital cost of the project is updated to Rupees 2680 crore, subject to variation for land acquisition, utility shifting and tree cutting, with NHAI required to maintain a record of capital cost recovery through user fees; the notification is signed by Suman Prasad Singh, Joint Secretary, under file number F. No. NHAI/Tech/UKD/74/Muzz-Har/Pkg-1/FeeNotification/2020-21/E-185331.

Full Text

REGD. No. D. L.-33004/99 The Gazette of India CG-DL-E-09032024-252782 EXTRAORDINARY PART II—Section 3—Sub-section (ii) PUBLISHED BY AUTHORITY No. 1106] NEW DELHI, FRIDAY, MARCH 8, 2024/PHALGUNA 18, 1945 MINISTRY OF ROAD TRANSPORT AND HIGHWAYS NOTIFICATION New Delhi, the 5th March, 2024 S.O. 1168(E).—Whereas by notification of the Government of India in the Ministry of Road Transport and Highways number S.O. 280(E) dated 20th January 2021, the Central Government has authorised National Highway Authority of India (hereinafter referred to as the "Authority") to collect, either through its officials or through a contractor for the use of the stretch Muzaffarnagar-Haridwar section from design kilometer 166.000 to kilometer 209.120 (existing km 166.000 to km 211.000) of National Highway number 58 ( New NH-334) in the State of Uttarakhand (hereinafter referred to as the "said section"). And whereas the Authority has now taken up the work of Construction/ Extension of Dudhadhari Elevated Flyover including approaches on said section from Km.206.400 to Km. 208.320 of NH-58 in the state of Uttarakhand on EPC Mode. In exercise of the powers conferred by Section 7 of the National Highways Act, 1956 (48 of 1956), read with Rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules 2008, the Central Government hereby makes following amendment in the Notification published vide S.O. 280(E), dated 20th January 2021 in the Gazette of India, Extraordinary, Part II, Section 3, Sub-section (ii) (hereinafter referred to as the “said notification"), namely:- (1). in para - 2 of the said notification:- i. for the net road section length of 24.471 km, the net road section length of 22.651 Km shall be substituted. ii. for the phrase "equivalent structure length (having length more than 60m) of 19.00 km (having length of 1.900 km)", the following phrase shall be substituted: "equivalent structure length (having length more than 60m) of 37.20 km (having length of 3.720 km)" (2). for the length of "24.471 Km" mentioned in column (2) of Table -2 under Sl. No. 1 of the said notification, the length of "22.651 Km" shall be substituted. (3). in Sl. No. 3 of the said notification, i. for the third row of Table-4, the following shall be substituted: At Design Km 187.370 (existing Km 191.00) of NH-58 (New NH-334) near Bhadarabad village in Haridwar district of Uttarakhand. | 3.720^^ | 37.200 | 100% for four or more lane, of the base rates mentioned in Tabl-1 above ii. for the details of structures of the second sub table mentioned under Table-4, the following details of structures shall be substituted, namely:- ^^The detail is as under:- Chainage | Type of Structure | Length (in km) From Km | To Km | | 1 | 167.235 | 167.335 | Grade Separator | 0.100 2 | 174.372 | 174.648 | Major Bridge | 0.276 3 | 181.195 | 181.350 | Major Bridge | 0.155 4 | 185.441 | 185.531 | Grade Separators | 0.090 5 | 186.065 | 186.146 | Major Bridge | 0.081 6 | 193.203 | 193.317 | Major Bridge | 0.114 7 | 198.684 | 198.786 | Grade Separator | 0.102 8 | 199.355 | 199.465 | Grade Separator | 0.110 9 | 202.560 | 202.660 | Grade Separator | 0.100 10 | 203.779 | 204.111 | Major Bridge | 0.332 11 | 204.320 | 204.450 | Major Bridge | 0.130 12 | 204.545 | 204.635 | Major Bridge | 0.090 13 | 205.820 | 205.940 | Major Bridge | 0.120 14 | 206.400 | 208.320 | Grade Separator | 1.920 Total | | | 3.720 (4). for Sl. No. 11 of the said notification, the following shall be substituted: - "11. The estimated capital cost of the project is Rupees 2680 crore. The capital cost is subjected to variation as the activities of land acquisition, utility shifting, tree cutting, etc. are yet to be completed. The Authority shall maintain a record of the recovery of capital cost through user fee realised." [F. No. NHAI/Tech/UKD/74/Muzz-Har/Pkg-1/FeeNotification/2020-21/E-185331] SUMAN PRASAD SINGH, Jt. Secy. Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.

Never miss important gazettes

Create a free account to save gazettes, add notes, and get email alerts for keywords you care about.

Sign Up Free