Full Text
REGD. No. D. L.-33004/99
The Gazette of India
CG-DL-E-08092025-265988
EXTRAORDINARY
PART II-Section 3-Sub-section (ii)
PUBLISHED BY AUTHORITY
No. 3950]
NEW DELHI, THURSDAY, SEPTEMBER 4, 2025/BHADRA 13, 1947
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATION
New Delhi, the 4th September, 2025
S.O. 4062(E).—Whereas by notification of the Government of India in the Ministry of Road Transport and
Highways number S.O. 1030(E) dated 08.03.2022 issued under section 11 of National Highways Authority of India
Act, 1988 (68 of 1988), the Central Government has entrusted the stretch starting from its junction with new NH-248A
near Sohna connecting Firozpur Jhirka in the state of Haryana, Dausa, Lalsot, Sawai Madhopur, Kota, Jhalawar in the
state of Rajasthan, Jaora, Ratlam in the state of Madhya Pradesh, Dahod, Godra, Dodka (Vadora), Bharuch, Surat,
Navasari, Valsad, Vapi in the State of Gujarat, Silvasa in the Union Territory of Dadar and Nagar Haveli, Virar,
Bhiwandi, Kalyan, Bandlapur and terminating at its junction with new NH No.348 near Panvel at JNPT in the State of
Maharashtra to the National Highways Authority of India (herein after referred to as the "Authority").
Now, therefore, in exercise of the powers conferred by section 7 of the National Highways Act, 1956 (48 of
1956), read with Rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008 and amended
from time to time (hereinafter referred to as the "Rules"), the Central Government, hereby levies the fee at 125% of the
rate specified in Column (2) of the Table 1 (hereinafter referred to as “base rate") net road section length of 139.013
Km and for equivalent structure length (having length more than 60m) of 87.344km (having length of 8.734 km) on the
type of vehicles specified in Column (1) of the Table 1 below for the use of 8 lane section from Km 696.920 (Dahod) to
Km 844.667 (Vadodara) (length 147.747 km) on National Highway No. NE-4 in the State of Gujarat, which is part of
Expressway notified as NE-4 vide S.O. No. 2142 (E) dated 03.06.2021 and authorizes the Authority to collect, either
through its Officials or through a Contractor, the said fee under "Closed User Fee Collection system", namely:-
Table-1
+-------------------------------------------------------------+---------------------------------------+
| Type of vehicle | Base rate of fee per Km for the |
| | Base Year 2007-08 (in Rupees) |
+-------------------------------------------------------------+---------------------------------------+
| (1) | (2) |
+-------------------------------------------------------------+---------------------------------------+
| Car, Jeep, Van or Light Motor Vehicle | 0.65 |
| Light Commercial Vehicle, Light Goods Vehicle or Mini Bus | 1.05 |
| Bus or Truck (Two Axles) | 2.20 |
| Three-axle commercial vehicles | 2.40 |
| Heavy Construction Machinery (HCM) or Earth Moving Equipment| 3.45 |
| (EME) or Multi Axle Vehicle (MAV) (four to six axles) | |
+-------------------------------------------------------------+---------------------------------------+
| Oversized Vehicles (seven or more axles) | 4.20 |
+-------------------------------------------------------------+---------------------------------------+
1. The fee to be levied and collected here under shall be due and payable at the following Fee Plaza (s) for net
road length specified between any two such Fee Plazas: -
Table - 2
+-----+-------------------------------------------------------+---------------------------------------------+---------------------------------------+
| S. | Location of Fee Plaza (Chainage) | Length (in km) for which Fee is | Rate at which fee is |
| No. | | payable (Excluding Structures > | payable |
| | | 60m length) | |
+-----+-------------------------------------------------------+---------------------------------------------+---------------------------------------+
| 1 | At Km713.500* of DVE (NE-4) TP-01Fee Plaza | | |
| | at Pavdi village in Dahod District of the state | | |
| | Gujarat). | | |
| 2 | At Km735+511 of DVE (NE-4) TP-02 Fee | | |
| | Plaza at Chopat palli village in Dahod district of | | |
| | state Gujarat). | | |
| 3 | At Km 782.421 of DVE (NE-4) TP-03 Fee | As per the distance matrix at Table | 125% of the base rates |
| | Plaza at Bhamaiya Village in Panchmahal | 3 below | mentioned in Table-1 |
| | District) | | above. |
| 4 | At Km 802.724 of DVE (NE-4) TP-04 Fee | | |
| | Plaza at Baletiya Village in Panchmahal District) | | |
| 5 | At Km 844.252** of DVE (NE-4) TP-05 Fee | | |
| | Plaza at Dodka Village in Vadodara District) | | |
+-----+-------------------------------------------------------+---------------------------------------------+---------------------------------------+
* Fee Plaza located at Km 713+500 is for tolling length from / up to Km 696.920 of Delhi Vadodara Expressway.
** Fee Plaza Located at Km 844.252 is for tolling length from / up to Km 844.667 of Delhi- Vadodara Expressway.
Table-3
Distance Matrix for Net Road length (Excluding length of Structures > 60 M length)
+-----+-----------------+-----------------+-----------------+-----------------+-----------------+-----------------+-----------------+-----------------+
| S. | From | Starting Point | Fee plaza | Fee Plaza | Fee Plaza TP- | Fee Plaza TP- | Fee Plaza | End point |
| No. | | at Km 696.920 | TP-1 at | TP-2 Km | 3 Km782.421 | 4 Km802.724 | TP-5 Km | at km |
| | | | Km | 735.511 | | | 844.252 | 844.667 |
| | | | 713.500 | | | | | |
+-----+-----------------+-----------------+-----------------+-----------------+-----------------+-----------------+-----------------+-----------------+
| 1 | Starting Point | 0.000 | 15.405 | 35.801 | 80.815 | 100.462 | 138.598 | 139.013 |
| | at Km 696.920 | | | | | | | |
| 2 | Fee plaza TP-1 | 15.405 | 0.000 | 20.396 | 65.410 | 85.058 | 123.193 | 123.608 |
| | at Km 713.500 | | | | | | | |
| 3 | Fee Plaza TP- | 35.801 | 20.396 | 0.000 | 45.014 | 64.662 | 102.797 | 103.212 |
| | 2 Km 735.511 | | | | | | | |
| 4 | Fee Plaza TP-3 | 80.815 | 65.410 | 45.014 | 0.000 | 19.648 | 57.783 | 58.198 |
| | Km782.421 | | | | | | | |
| 5 | Fee Plaza TP-4 | 100.462 | 85.058 | 64.662 | 19.648 | 0.000 | 38.135 | 38.550 |
| | Km802.724 | | | | | | | |
+-----+-----------------+-----------------+-----------------+-----------------+-----------------+-----------------+-----------------+-----------------+
2. In addition to above, the following fee shall also be due and payable for the use of the following structures having
length more than 60 m at the following Fee plaza, by converting the length of structures into an equivalent length of
highway by multiplying the length of such structures by an equalization factor of 10:
Table - 4
+-----+-------------------------------------------------------+---------------------------------------------+-----------------------------+---------------------------------------+
| S. | Location of Fee Plaza (Chainage) | Length of structures (in km) | Equivalent | Rate at which fee |
| No. | | for which fee is payable | road length (in | is payable |
| | | | km) | |
+-----+-------------------------------------------------------+---------------------------------------------+-----------------------------+---------------------------------------+
| (1) | (2) | (3) | (4) | (5) |
+-----+-------------------------------------------------------+---------------------------------------------+-----------------------------+---------------------------------------+
| 1 | At Km713.500* of DVE (NE-4) TP- | | | |
| | 01Fee Plaza atPavdi village in | | | |
| | Dahod District of the state Gujarat). | | | |
| 2 | At Km735+511 of DVE(NE-4) TP-02 | | | |
| | Fee Plaza at Chopat palli village in | | | |
| | Dahod district of state Gujarat). | | | |
| 3 | At Km 782.421 of DVE(NE-4) TP-03 | As per the distance | 10 times of the | 125% of the base |
| | Fee Plaza at Bhamaiya Village in | matrix for structures > 60 | length as per | rates mentioned in |
| | Panchmahal District) | m length at Table 5 below | Col.3 | Table-1 above. |
| 4 | At Km 802.724 of DVE(NE-4) TP-04 | | | |
| | Fee Plaza at Baletiya Village in | | | |
| | Panchmahal District) | | | |
| 5 | At Km 844.252** of DVE (NE-4) TP- | | | |
| | 05 Fee Plaza at Dodka Village in | | | |
| | Vadodara District) | | | |
+-----+-------------------------------------------------------+---------------------------------------------+-----------------------------+---------------------------------------+
Table - 5
Distance Matrix for equivalent length of structures (> 60 Meter length) between Fee Plazas (i.e 10x length of
structures)
+-----+-----------------+-----------------+-----------------+-----------------+-----------------+-----------------+-----------------+-----------------+
| S. | From | Starting Point | Fee plaza | Fee Plaza | Fee Plaza TP- | Fee Plaza TP- | Fee Plaza | End point |
| No. | | at Km 696.920 | TP-1 at | TP-2 Km | 3 Km782.421 | 4 Km802.724 | TP-5 Km | at km |
| | | | Km | 735.511 | | | 844.252 | 844.667 |
| | | | 713.500 | | | | | |
+-----+-----------------+-----------------+-----------------+-----------------+-----------------+-----------------+-----------------+-----------------+
| 1 | Starting Point | 0.000 | 11.754 | 27.903 | 46.863 | 53.396 | 87.344 | 87.344 |
| | at Km 696.920 | | | | | | | |
| 2 | Fee plaza TP-1 | 11.754 | 0.000 | 16.149 | 35.109 | 41.642 | 75.590 | 75.590 |
| | at Km 713.500 | | | | | | | |
| 3 | Fee Plaza TP- | 27.903 | 16.149 | 0.000 | 18.960 | 25.493 | 59.441 | 59.441 |
| | 2 Km 735.511 | | | | | | | |
| 4 | Fee Plaza TP-3 | 46.863 | 35.109 | 18.960 | 0.000 | 6.533 | 40.481 | 40.481 |
| | Km782.421 | | | | | | | |
| 5 | Fee Plaza TP-4 | 53.396 | 41.642 | 25.493 | 6.533 | 0.000 | 33.948 | 33.948 |
| | Km802.724 | | | | | | | |
| 6 | Fee Plaza TP- | 87.344 | 75.590 | 59.441 | 40.481 | 33.948 | 0.000 | 0.000 |
| | 5 Km 844.252 | | | | | | | |
| 7 | End point at | 87.344 | 75.590 | 59.441 | 40.481 | 33.948 | 0.000 | 0.000 |
| | km 844.667 | | | | | | | |
+-----+-----------------+-----------------+-----------------+-----------------+-----------------+-----------------+-----------------+-----------------+
*The details of structures having length more than 60m are as under:
Table 5A
Chainage
+-----+---------+-------------------+---------------+---------------+---------------+-----------------------+----------------------------+
| S | Package | Type of Structure | Design At | Start | End Chainage | Length of | Equivalent Length |
| No | | | Km | Chainage | | Structure | of structure |
| | | | | | | (In Km) | (In Km) |
+-----+---------+-------------------+---------------+---------------+---------------+-----------------------+----------------------------+
| (A) | (B) | (C) | (D) | (E) | (F) | (G) | (H=GX10) |
+-----+---------+-------------------+---------------+---------------+---------------+-----------------------+----------------------------+
| 1 | | Major Bridge | 697.415 | 697.379 | 697.450 | 0.0706 | 0.7060 |
| 2 | | Major Bridge | 697.967 | 697.914 | 698.020 | 0.1056 | 1.0560 |
| 3 | | Major Bridge | 701.401 | 701.313 | 701.489 | 0.1756 | 1.7560 |
| 4 | | Major Bridge | 703.296 | 703.173 | 703.419 | 0.2456 | 2.4560 |
| 5 | | Major Bridge | 704.200 | 704.095 | 704.305 | 0.2106 | 2.1060 |
| 6 | | Major Bridge | 706.650 | 706.587 | 706.713 | 0.1256 | 1.2560 |
| 7 | | Major Bridge | 707.960 | 707.922 | 707.998 | 0.0756 | 0.7560 |
| 8 | Pkg 26 | Major Bridge | 708.302 | 708.249 | 708.355 | 0.1056 | 1.0560 |
| 9 | | Interchange | 713.073 | 713.043 | 713.103 | 0.0606 | 0.6060 |
| 10 | | Major Bridge | 716.414 | 716.344 | 716.484 | 0.1406 | 1.4060 |
| 11 | | Major Bridge | 716.775 | 716.722 | 716.828 | 0.1056 | 1.0560 |
| 12 | | Major Bridge | 717.172 | 717.127 | 717.217 | 0.0906 | 0.9060 |
| 13 | | Major Bridge | 721.815 | 721.765 | 721.865 | 0.1006 | 1.0060 |
| 14 | | Major Bridge | 725.719 | 725.686 | 725.752 | 0.0666 | 0.6660 |
| 15 | | Major Bridge | 728.574 | 728.049 | 729.099 | 1.0506 | 10.5060 |
| 16 | | Interchange | 735.511 | 735.451 | 735.571 | 0.1206 | 1.2060 |
| 17 | | Minor Bridge | 736.774 | 736.744 | 736.804 | 0.0606 | 0.6060 |
| 18 | Pkg 27 | Major Bridge | 738.394 | 738.271 | 738.517 | 0.2456 | 2.4560 |
| 19 | | Major Bridge | 743.550 | 743.506 | 743.594 | 0.0881 | 0.8810 |
| 20 | | VUP | 756.870 | 756.835 | 756.905 | 0.0706 | 0.7060 |
| 21 | | Major Bridge | 757.423 | 756.983 | 757.863 | 0.8806 | 8.8060 |
| 22 | Pkg 28 | Major Bridge | 777.280 | 777.158 | 777.402 | 0.2446 | 2.4460 |
| 23 | | Major Bridge | 778.800 | 778.677 | 778.923 | 0.2456 | 2.4560 |
| 24 | | ROB | 782.849 | 782.698 | 783.000 | 0.3012 | 3.0120 |
| 25 | | Major Bridge | 789.225 | 789.172 | 789.278 | 0.1056 | 1.0560 |
| 26 | Pkg 29 | Major Bridge | 800.865 | 800.812 | 800.918 | 0.1056 | 1.0560 |
| 27 | | Major Bridge | 801.767 | 801.732 | 801.802 | 0.0706 | 0.7060 |
| 28 | | Interchange | 802.722 | 802.652 | 802.792 | 0.1406 | 1.4060 |
| 29 | | Major Bridge | 805.063 | 804.122 | 806.004 | 1.8816 | 18.8160 |
| 30 | | Major Bridge | 808.571 | 808.519 | 808.624 | 0.1050 | 1.0500 |
| 31 | | Major Bridge | 810.832 | 810.782 | 810.882 | 0.1000 | 1.0000 |
| 32 | Pkg 30 | Major Bridge | 812.718 | 812.656 | 812.781 | 0.1250 | 1.2500 |
| 33 | | Major Bridge | 814.621 | 814.590 | 814.652 | 0.0620 | 0.6200 |
| 34 | | Major Bridge | 818.375 | 818.317 | 818.433 | 0.1169 | 1.1690 |
| 35 | | ROB | 827.346 | 827.290 | 827.402 | 0.1123 | 1.1230 |
| 36 | | Major Bridge | 836.716 | 836.454 | 836.978 | 0.5242 | 5.2420 |
| 37 | Pkg 31 | Major Bridge | 837.352 | 837.300 | 837.405 | 0.105 | 1.0500 |
| 38 | | Major Bridge | 841.374 | 841.278 | 841.470 | 0.1925 | 1.9250 |
+-----+---------+-------------------+---------------+---------------+---------------+-----------------------+----------------------------+
| | Total | | | | | 8.734 | 87.340 |
+-----+---------+-------------------+---------------+---------------+---------------+-----------------------+----------------------------+
3. Then effective length for which fee shall be due and payable is as under:
Table 6
Distance matrix for total tollable road length (Including equivalent length of structures >60 m length) (Table 3 +
Table 5)
+-----+-----------------+-----------------+-----------------+-----------------+-----------------+-----------------+-----------------+-----------------+
| S. | From | Starting Point | Fee plaza | Fee Plaza | Fee Plaza TP- | Fee Plaza TP- | Fee Plaza | End point |
| No. | | at Km 696.920 | TP-1 at | TP-2 Km | 3 Km782.421 | 4 Km802.724 | TP-5 Km | at km |
| | | | Km | 735.511 | | | 844.252 | 844.667 |
| | | | 713.500 | | | | | |
+-----+-----------------+-----------------+-----------------+-----------------+-----------------+-----------------+-----------------+-----------------+
| 1 | Starting Point | 0.000 | 27.159 | 63.704 | 127.678 | 153.858 | 225.942 | 226.357 |
| | at Km 696.920 | | | | | | | |
| 2 | Fee plaza TP-1 | 27.159 | 0.000 | 36.545 | 100.519 | 126.700 | 198.783 | 199.198 |
| | at Km 713.500 | | | | | | | |
| 3 | Fee Plaza TP- | 63.704 | 36.545 | 0.000 | 63.974 | 90.155 | 162.238 | 162.653 |
| | 2 Km 735.511 | | | | | | | |
| 4 | Fee Plaza TP-3 | 127.678 | 100.519 | 63.974 | 0.000 | 26.181 | 98.264 | 98.679 |
| | Km782.421 | | | | | | | |
| 5 | Fee Plaza TP-4 | 153.858 | 126.700 | 90.155 | 26.181 | 0.000 | 72.083 | 72.498 |
| | Km802.724 | | | | | | | |
| 6 | Fee Plaza TP- | 225.942 | 198.783 | 162.238 | 98.264 | 72.083 | 0.000 | 0.415 |
| | 5 Km 844.252 | | | | | | | |
| 7 | End point at | 226.357 | 199.198 | 162.653 | 98.679 | 72.498 | 0.415 | 0.000 |
| | km 844.667 | | | | | | | |
+-----+-----------------+-----------------+-----------------+-----------------+-----------------+-----------------+-----------------+-----------------+
4. The various types of traffic moments for which the user Fee will be charged on the basis of actual distance travelled
is as under:
Table7A: Traffic Plying on LHS from Delhi/Rajasthan to Vadodara/Mumbai
+-------+-----+----------------------------------------------------------+-------------------------------------------------------+
| Sr. | KM | Entry From | Exit To |
| No. | | | |
+-------+-----+----------------------------------------------------------+-------------------------------------------------------+
| | | | Pavdi Interchange Fee Plaza TP-1 (Km 713.500) |
| | | | Chopat Palli Interchange TP-2 Fee Plaza (Km 735.511) |
| | | Delhi Vadodara Expressway | Bhamaiya village Interchange Fee PlazaTP-3 of Delhi |
| | 0 | Pkg 25 at Km 696.920. Entry | Vadodara Expressway at Ch 782.421 |
| | | shall be recorded at Pavdi | Ramp at Km 802.724 TP-4 for Kalol / Halol |
| | | Interchange Fee Plaza at Km | Loop at Km 844.252 TP-5 to NE-1 for Ahmedabad |
| | | 713.500 | |
| 1 | | | Ramp at Km 844.252 TP-5 to NE-1 for Vadodara. |
| | | | Pkg 1 of Vadodara-Mumbai Expressway NE-04 |
| | | | Chopat Palli Interchange TP-2 Fee Plaza TP-2 |
| | | | (Km 735.511) |
| | | | Bhamaiya village Interchange Fee Plaza TP-3 of Delhi |
| | | | Vadodara Expressway at Ch 782.421 |
| | 16.58 | Pavdi Fee Plaza TP-1 at Km | Ramp at Km 802.724 TP-4 for Kalol / Halol |
| | | 713.500. (Ramp) | Loop at Km 844.252 TP-5 to NE-1 for Ahmedabad |
| | | | Ramp at Km 844.252 TP-5 to NE-1 for Vadodara. |
| 2 | | | Pkg 1 of Vadodara-Mumbai Expressway NE-04 |
| | | | Bhamaiya village Interchange Fee Plaza TP-3 of Delhi |
| | | | Vadodara Expressway at Ch 782.421 |
| | | Chopat Palli Interchange TP- | Ramp at Km 802.724 TP-4 for Kalol / Halol |
| | | 2 at Km 735.511at Fee Plaza | Loop at Km 844.252 TP-5 to NE-1 for Ahmedabad |
| | 38.591| Both Entry and | Ramp at Km 844.252 TP-5 to NE-1 for Vadodara. |
| | | Exit)) (Ramp) | |
| 3 | | | Pkg 1 of Vadodara-Mumbai Expressway NE-04 |
| | | | Ramp at Km 802.724 TP-4 for Kalol / Halol |
| | | Km 782.421 TP-3 (On Ramp | Loop at Km 844.252 TP-5 to NE-1 for Ahmedabad |
| | | of Double Trumpet | Ramp at Km 844.252 TP-5 to NE-1 for Vadodara. |
| | 85.501| Interchange Fee Plaza) | Pkg 1 of Vadodara-Mumbai Expressway NE-04 |
| | | (Bhamaiya Village in | |
| 4 | | Panchmahal District) from | |
| | | Godhra and | |
| | | Ahmadabad through Ramp. | Loop at Km 844.252 TP-5 to NE-1 for Ahmedabad |
| 5 | 105.804 | Km 802.724 TP-4 (LHS | Ramp at Km 844.252 TP-5 to NE-1 for Vadodara. |
| | | Ramp Toll Plaza For | Pkg 1 of Vadodara-Mumbai Expressway NE-04 |
| | | Mumbai in Baletiya Village | Pkg 1 of Vadodara-Mumbai Expressway NE-04 |
| | | in Panchmahal District) | |
| | | Km 844.252 TP-5 of DVE | |
| | | (Toll Plaza on Loop/Ramp) | |
| | | (Dodka Village in Vadodara | |
| | | District) | |
| | 147.332 | A) Loop from NE-1 | |
| | | Vadodara | |
| | | B) Ramp from NE-1 | |
| 6 | | Ahmedabad Side | |
+-------+-----+----------------------------------------------------------+-------------------------------------------------------+
* Succeeding Fee Plaza at Vadodara -Mumbai Expressway Package 1 Main line Fee Plaza both Entry & Exit
Table7B: Traffic Plying on RHS from Mumbai/Vadodara to Rajasthan/Delhi
+-------+-----+----------------------------------------------------------+-------------------------------------------------------+
| Sr.No | KM | Entry From | Exit To |
+-------+-----+----------------------------------------------------------+-------------------------------------------------------+
| | | Pkg 1 of Vadodara-Mumbai | Loop at Km 844.252 TP-5 to NE-1 for Ahmedabad |
| | | Expressway NE-04 at Km | Ramp at Km 844.252 TP-5 to NE-1 for Vadodara. |
| | | 844.667. | Ramp at Km 802.724 TP-4 for Kalol / Halol |
| | | Entry shall be recorded at Km | Loop Bhamaiya village Interchange Fee Plaza TP-3 of |
| | 0 | 844.252TP-5 of DVE (Toll | Delhi Vadodara Expressway at Ch 782.421 |
| | | Plaza on Loop/Ramp) (Dodka | Ramp Chopat Palli Interchange TP-2 Fee Plaza TP-2 |
| | | Village in Vadodara District). | (Km 735.511) |
| 1 | | | Ramp Pavdi Fee Plaza TP-1 (Km 713.500) |
| | | At Km 844.252 TP-5 of DVE ( | Pkg 25 of Delhi-Vadodara Expressway NE-04 |
| | | Toll Plaza on Loop/, Ramp) | |
| | | (Dodka Village in Vadodara | |
| | | District) | Ramp at Ksm 802.724 TP-4 for Kalol / Halol |
| | 0.415 | A) Loop from NE-1 Vadodara | Loop Bhamaiya village Interchange Fee Plaza TP-3 of |
| | | | Delhi Vadodara Expressway at Ch 782.421 |
| | | | Ramp Chopat Palli Interchange TP-2 Fee Plaza TP-2 |
| | | | (Km 735.511) |
| | | | Ramp Pavdi Fee Plaza TP-1 (Km 713.500) |
| 2 | | B) Ramp(DVE- PKG-31)from | Pkg 25 of Delhi-Vadodara Expressway NE-04 |
| | | NE-1 Ahmedabad Side | Ramp at Km 802.724 TP-4 for Kalol / Halol |
| | | | Loop Bhamaiya village Interchange Fee Plaza TP-3 of |
| | | | Delhi Vadodara Expressway at Ch 782.421 |
| | | Km 802.724TP-4 of DVE | Ramp Chopat Palli Interchange TP-2 Fee Plaza TP-2 |
| | | (RHS Toll Plaza) (Baletiya | (Km 735.511) |
| | | Village in Panchmahal District) | Ramp Pavdi Fee Plaza TP-1 (Km 713.500) |
| | 41.943| Sevaliya, Kalol, Halol. | Pkg 25 of Delhi-Vadodara Expressway NE-04 |
| 3 | | At Km 782.421TP-3 of DVE | |
| | | (On Ramp of Double Trumpet | |
| | | Interchange Fee Plaza) | |
| | | (Bhamaiya Village in | Ramp Chopat Palli Interchange TP-2 Fee Plaza TP-2 |
| | | Panchmahal District | (Km 735.511) |
| 4 | | A) Ramp (From Ahmedabad | Ramp Pavdi Interchange Fee Plaza TP-1 |
| | | NH-47) or Godhra | (Km 713.500) |
| | 62.246| B) Ramp-5 from Dahod or | Pkg 25 of Delhi-Vadodara Expressway NE-04 |
| | | Godhra | Ramp Chopat Palli Interchange TP-2 Fee Plaza TP-2 |
| | | | (Km 735.511) |
| | | Chopat Palli Interchange at Km | Ramp Pavdi Fee Plaza TP-1 (Km 713.500) |
| | 109.156 | 735.511 TP-2 at (Ramp Fee | Pkg 25 of Delhi-Vadodara Expressway NE-04 |
| | | Plaza Both Entry and Exit)) | Ramp Pavdi Fee Plaza TP-1 (Km 713.500) |
| 5 | | | Pkg 25 of Delhi-Vadodara Expressway NE-04 |
| | 131.167 | Pavdi Fee Plaza TP-1 at Km | Pkg 25 of Delhi-Vadodara Expressway NE-04 |
| | | 713.500. (RampFee Plaza Both | |
| 6 | | Entry and Exit)) | |
+-------+-----+----------------------------------------------------------+-------------------------------------------------------+
*Succeeding Fee Plaza of Delhi -Vadodara Expressway Package 25
5. The vehicle entering the project highway will be recorded at the Entry fee Plaza and user Fee will be collected at
Exit Fee Plaza for the road section used by the vehicle between Entry and Exit Fee Plazas as per details mentioned under
para (4).
6. For multiple journeys on the highway section, passes shall be issued at the following rates, namely:
Table - 8
+-----------------------------------------------------+---------------------------------------------+---------------------------------------+
| Amount Payable | Maximum number of one way | Period of validity |
| | journeys allowed | |
+-----------------------------------------------------+---------------------------------------------+---------------------------------------+
| One and one-half times of the fee for one | Two | Twenty four hours from the |
| way Journey* | | time of payment |
| Two-third of amount of the fee payable for | Fifty | One month from date of |
| fifty single journeys* | | payment |
+-----------------------------------------------------+---------------------------------------------+---------------------------------------+
*Provided that the user uses the same entry and exit fee plazas while performing the return journey.
7. The driver or owner or a person in charge of a mechanical vehicle which is loaded in excess of permissible load
specified for its category, shall be liable to pay fee for entering the overloaded vehicle on the National Highway to the
fee collecting agency, equal to the fee specified in sub-rule 1A of rule 10 of the said rules, and shall not be entitled to
make use of the highway section unless the excess load has been removed from such mechanical vehicle.
8. All definitions including category of mechanical vehicles, its permissible load, category of exempted vehicles, service
road, alternative road, etc. shall be as per definitions specified in the said rules.
9. The fee rates shall be displayed for information of the users in accordance with rule 12 of the said rules.
10. Based on the base rate of fee per kilometer for the base year 2007-08 as mentioned in Table-1 above, the actual
amount of fee to be charged from the mechanical vehicles and the discounts will be calculated by the Authority on the
basis of the completed length of the section and revised annually in accordance with the rule 5 of the said rules and the
same shall be published in at least one newspaper, each in English and vernacular language accordingly.
11. The estimated capital cost of the project is Rupees 7,924.40 Crores. The capital cost is subject to variation as the
activities of land acquisition, utility shifting, tree cutting, etc., are yet to be completed. The Authority shall maintain a
record of the recovery of capital cost through user fee realized.
[F. No. GUJDIV-20019/20/2025-PIU Godhra/E-253288]
VINAY KUMAR, Addl. Secy.
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054. GORAKHA NATH
YADAVA