Gazette Tracker
Gazette Tracker

Core Purpose

Notification under Section 7 of the National Highways Act, 1956 levying user fee for four/two-lane sections, structures and bypasses on the Hariharganj-Near Parwa More section of National Highway No. 98 in Jharkhand, and authorizing the National Highways Authority of India to collect it.

Detailed Summary

This notification (S.O. 1063(E), dated 5 March 2024) issued by the Ministry of Road Transport and Highways levies toll fees under Section 7 of the National Highways Act, 1956 (48 of 1956) read with Rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008, referencing the entrustment of the NH98 stretch (Hariharganj Bypass, Bihar, to Shildag, Jharkhand section, Km 23.284 to Km 57.049, Aurangabad-Parwa More section) to the National Highways Authority of India (NHAI) under earlier notification S.O. 3642(E) dated 16 October 2020 issued under Section 11 of the National Highways Authority of India Act, 1988 (68 of 1988). It sets base-year (2007-08) per-km fee rates by vehicle category (e.g., Rs. 0.65 for cars/jeeps/vans, Rs. 4.20 for oversized vehicles of seven or more axles) for a net road length of 20.716 km and equivalent structure length of 0.700 km (flyover of 0.070 km length, converted via a factor of 10), plus a 150% surcharge for two bypasses (Hariharganj Bypass, 6.480 km costing Rs. 141.431 crore, and Chattarpur Bypass, 6.450 km costing Rs. 127.291 crore) costing over Rs. 10 crore each. The fee is collectible at a plaza at Design Km 32.750 (existing chainage 32.750) in Kauwakhoh Village, Palamu District, Jharkhand. It sets a monthly non-commercial pass rate of Rs. 330 for residents within 20 km, and multi-journey pass rates (1.5x single fee for two journeys within 24 hours; two-thirds of the fee for fifty journeys within one month). The notification covers National Highway No. 98 in Jharkhand.

Full Text

REGD. No. D. L.-33004/99 The Gazette of India CG-DL-E-06032024-252629 EXTRAORDINARY PART II—Section 3—Sub-section (ii) PUBLISHED BY AUTHORITY NEW DELHI, TUESDAY, MARCH 5, 2024/PHALGUNA 15, 1945 No. 1014] MINISTRY OF ROAD TRANSPORT AND HIGHWAYS NOTIFICATION New Delhi, the 5th March, 2024 S.O. 1063(E).— Whereas by notification of the Government of India in the Ministry of Road Transport and Highways number S.O. 3642 (E) dated the 16th October 2020 issued under Section 11 of the National Highway Authority of India Act 1988 (68 to 1988), the Central Government has entrusted the stretch from Start of Hariharganj Bypass (Bihar) to - Shildag (Jharkhand) section (In the State of Bihar & Jharkhand) of National Highway No 98 from Km. 23.284 to Km. 57.049 of Aurangabad – Parwa More section to the National Highways Authority of India (hereinafter referred to as the "Authority"); Now, therefore, in exercise of the powers conferred by section 7 of the National Highways Act, 1956 (48 of 1956), read with rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008 (hereinafter referred to as the "rules"), the Central Government hereby levies the fee at the rate specified in column (2) of the Table 1 for net road section length of 20.716 km and for equivalent structure length (having length more than 60m) of 0.700 km (having length of 0.070 km) and at one and one half times the base rate for bypasses having length of 12.930 km costing rupees ten crore or more on the type of vehicles specified in column (1) of the Table 1 below for the use of four or more lane of Hariharganj-Near Parwa more Section from Design km 23.284 to km 57.000 (existing chainage km 23.284 to km 57.049) of National Highway number 98 in the State of Jharkhand and authorises the Authority to collect, either through its officials or through a contractor, the said fee, namely:- Table 1 +-------------------------------------------------------------+----------------------------------------------------+ | Type of vehicle | Base rate of fee per km for the base | | | year 2007-08 (in Rupees) | +=============================================================+====================================================+ | (1) | (2) | +-------------------------------------------------------------+----------------------------------------------------+ | Car, Jeep, Van or Light Motor Vehicle | 0.65 | +-------------------------------------------------------------+----------------------------------------------------+ | Light Commercial Vehicle, Light Goods Vehicle or Mini Bus | 1.05 | +-------------------------------------------------------------+----------------------------------------------------+ | Bus or Truck (Two Axles) | 2.20 | +-------------------------------------------------------------+----------------------------------------------------+ | Three-axle commercial vehicles | 2.40 | +-------------------------------------------------------------+----------------------------------------------------+ | Heavy Construction Machinery (HCM) or Earth Moving Equipment (EME) | 3.45 | | or Multi Axle Vehicle (MAV) (four to six axles) | | +-------------------------------------------------------------+----------------------------------------------------+ | Oversized Vehicles (seven or more axles) | 4.20 | +-------------------------------------------------------------+----------------------------------------------------+ 1. The fee to be levied and collected hereunder shall be due and payable at the Fee Plaza for net road length specified for such Fee Plaza namely: - Table-2 +--------------------------------------------------------------+-------------------------------------------------------+-----------------------------------------------------+ | Location of Fee Plaza | Length (in km) for which Fee is | Rate at which fee is payable | | (chainage) | payable | | +==============================================================+=======================================================+=====================================================+ | At Design km 32.750 | 20.716 | 100% for four or more lane, ofthe base | | (existing chainage | [Excluding length of Bypass (costing >10 | rates mentioned in Table-1 above | | 32.750) at | Cr.) and length of structures (>60m)] | | | Kauwakhoh Village of | | | | Palamu District in | | | | Jharkhand State. | | | +--------------------------------------------------------------+-------------------------------------------------------+-----------------------------------------------------+ 2. In addition to above, the following fee shall also be due and payable for the use of the bypass costing Rs. 10 crore or more at the following Fee Plaza for net bypass length specified for such Fee Plaza: - Table-3 +-----------------------------------------------------+------------------+------------+-----------+------------------------------------+------------------------------------+ | Location of Fee Plaza | Name of the | Taking Off | Mergingat | Length and Costof | Rate at which fee is | | (chainage) | Bypass | | | bypass for which | payable | | | | | | additional | | | | | | | fee is payable | | | | | | | Length | Cost | | | | | | | (in Km.) | (in Rs. | | | | | | | | Crore) | | +=====================================================+==================+============+===========+==============+===================+====================================+ | At Design km | Hariharganj | Design km | Design | 6.480 | 141.431 | 150% for four or more | | 32.750 | Bypass of | 23.520 | km | | | lane of the base rates | | (existing chainage | NH - 98 | (existing | 30.000 | | | mentioned in Table-1 | | 32.750) at | | km | (existing | | | | | Kauwakhoh | | 23.520) | km | | | | | Village of | | | 30.000) | | | | | Palamu District in | | | | | | | | Jharkhand State. | | | | | | | +-----------------------------------------------------+------------------+------------+-----------+--------------+-------------------+------------------------------------+ | | Chattarpur | Design km | Design | 6.450 | 127.291 | 150% for four or more | | | Bypass of | 45.600 | km 52.050 | | | lane of the base rates | | | NH - 98 | (existing | (existing | | | mentioned in Table-1 | | | | km | km | | | | | | | 45.600) | 52.050) | | | | +-----------------------------------------------------+------------------+------------+-----------+--------------+-------------------+------------------------------------+ 3. In addition to above, the following fee shall also be due and payable for the use of the following structures having length more than 60m at the following Fee Plaza(s), by converting the length of structures into an equivalent length of highway by multiplying the length of such structures by an equalisation factor of 10: - Table-4 +-----------------------------------------------------+-------------------------------------------------------+------------------------------------+------------------------------------+ | Location of Fee Plaza | Length of structures^ (in km) to | Equivalent road | Rate at which fee is | | (chainage) | be converted into | length | payable | | | equivalent road length | (in km) | | +=====================================================+=======================================================+====================================+====================================+ | At Design km 32.750 (existing | 0.070^ | 0.700 | 100% for four or more | | chainage 32.750) at Kauwakhoh | | | lane of the base rates | | Village of Palamu District in | | | mentioned in Table-1 | | Jharkhand State. | | | | +-----------------------------------------------------+-------------------------------------------------------+------------------------------------+------------------------------------+ ^The detail is as under: +---------+-----------+---------+-------------------+------------------+ | | Chainage | | Type of Structure | Length (in km) | +=========+===========+=========+===================+==================+ | From Km | To Km | | | | +---------+-----------+---------+-------------------+------------------+ | 1 | 40.013 | 40.083 | Flyover | 0.070 | +---------+-----------+---------+-------------------+------------------+ | | Total | | | 0.070 | +---------+-----------+---------+-------------------+------------------+ 4. The rate of monthly pass for a person who owns a mechanical vehicle registered for non-commercial purposes and resides within a distance of twenty kilometres from the fee plaza is Rs 330.000 (Rupees Three Hundred and Thirty Only) for the year 2023-24 and is subject to revision every year as per the provisions of the said rules. 5. For multiple journeys on the highway section, passes shall be issued at the following rates, namely: - Table-5 +-----------------------------------------------------+-------------------------------------------------------+------------------------------------+ | Amount Payable | Maximum number of | Period of validity | | | one way | | | | journeys allowed | | +=====================================================+=======================================================+====================================+ | One and one-half times of the fee for one | Two | Twenty four hours from the time of | | way journey | | payment | +-----------------------------------------------------+-------------------------------------------------------+------------------------------------+ | Two-third of amount of the fee payable | Fifty | One month from date of payment | | for fifty single journeys | | | +-----------------------------------------------------+-------------------------------------------------------+------------------------------------+ 6. Fee for commercial vehicle (excluding vehicles plying under National permit) registered in the district where the fee plaza falls shall be 50% of the specified rate for that category of vehicle provided no service road or alternative road is available for use of such commercial vehicles. 7. The driver or owner or a person in charge of a mechanical vehicle which is loaded in excess of permissible load specified for its category, shall be liable to pay fee for entering the overloaded vehicle on the National Highway to the fee collecting agency, equal to the fee specified in sub-rule 1A of rule 10 of the said rules, and shall not be entitled to make use of the highway section unless the excess load has been removed from such mechanical vehicle. 8. All definitions including category of mechanical vehicles, its permissible load, category of exempted vehicles, service road, alternative road, etc. shall be as per definitions specified in the said rules. 9. The fee rates shall be displayed for information of the users in accordance with rule 12 of the said rules. 10. Based on the base rate of fee per kilometer for the base year 2007-08 as mentioned in Table-1 above, the actual amount of fee to be charged from the mechanical vehicles and the discounts will be calculated by the Authority on the basis of the completed length of the section and revised annually in accordance with the rule 5 of the said rules and the same shall be published in at least one newspaper in English and vernacular language. 11. The estimated capital cost of the project is Rs. 960.03 Crore. The capital cost is subjected to variation as the activities of land acquisition, utility shifting, tree cutting, etc. are yet to be completed. The Authority shall maintain a record of the recovery of capital cost through user fee realised. [F. No. NHAI/13013/CO/23-24/FeeNotification/Hariharganj-NearParwaMoreSection(km23.284-km57.000)/ E-232919] SUMAN PRASAD SINGH, Jt. Secy.

Never miss important gazettes

Create a free account to save gazettes, add notes, and get email alerts for keywords you care about.

Sign Up Free