Full Text
REGD. No. D. L.-33004/99
The Gazette of India
CG-DL-E-05062026-273170
EXTRAORDINARY
PART II—Section 3—Sub-section (ii)
PUBLISHED BY AUTHORITY
No. 2748] NEW DELHI, WEDNESDAY, JUNE 3, 2026/JYAISHTHA 13, 1948
4002 GI/2026
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATION
New Delhi, the 3rd June, 2026
S.O. 2842(E).—Whereas by notification of the Government of India in the Ministry of Road Transport and
Highways [number S.0.1401(E) dated 31st May 2013], issued under section 5 of the National Highways Act, 1956 (48
of 1956), the Central Government has entrusted the entire new National Highway No.532, in the State of Tamil Nadu
to the State Government of Tamil Nadu.
Now, therefore, in exercise of the powers conferred by section 7 of the National Highways Act, 1956 (48 of
1956), read with Rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules 2008
(hereinafter referred to as the "rules") and in supersession to the notification bearing S.O.110 (E) dated.07.01.2020,
the Central Government hereby levies the fee at the base rate specified in column (2) of the Table 1 for net road
section length of 51.831 km (Table-2) and for equivalent structure length (having length more than 60 m) of 2.968 km
(having length of 0.2968 km [Table-3]) for the use of four or more lane and at sixty per cent of the base rate specified
in column (2) of the Table 1 for net road section length of 3.847 km (Table-2) and for equivalent structure length
(having length more than 60m) of 2.261 km (having length of 0.2261 km [Table-3]) for the use of two lane with
paved shoulder section on the type of vehicles specified in column (1) of the Table 1 below for the use of Cuddalore to
Vridhachalam Section from design km 0.800 to km 57.800 (existing km 0.800 to km 51.00) of National Highways
number 532 in the State of Tamil Nadu and authorises the National Highways Authority of India to collect, either
through its officials or through a contractor the said fee, namely.
Table-1
+-------------------------------------------------------------+-----------------------------------+
| Type of Vehicle | Base rate of fee per km for the |
| | base year 2007-08 (in Rupees) |
+=============================================================+===================================+
| (1) | (2) |
+-------------------------------------------------------------+-----------------------------------+
| Car, Jeep, Van or Light Motor Vehicle | 0.65 |
+-------------------------------------------------------------+-----------------------------------+
| Light Commercial Vehicle, Light Goods Vehicle or Mini bus | 1.05 |
+-------------------------------------------------------------+-----------------------------------+
| Bus or Truck (Two Axles) | 2.20 |
+-------------------------------------------------------------+-----------------------------------+
| Three- axle commercial vehicles | 2.40 |
+-------------------------------------------------------------+-----------------------------------+
| Heavy Construction Machinery (HCM) or Earth Moving Equipment| 3.45 |
| (EME) or Multi Axle Vehicle (MAV) (four to six axles) | |
+-------------------------------------------------------------+-----------------------------------+
| Oversized Vehicles (Seven or more Axles) | 4.20 |
+-------------------------------------------------------------+-----------------------------------+
1. The fee to be levied and collected hereunder shall be due and payable at the Fee Plaza for net road length
specified for such Fee Plaza(s) namely:-
Table-2
+----------------------------------------------------+-------------------------------------------+-----------------------------------------------+
| Location of Fee Plaza (chainage) | Length(in km) for which Fee is | Rate at which fee is payable |
| | payable (Excluding Structure > | |
| | 60mlength) | |
+====================================================+===========================================+===============================================+
| At Km 45.200 of NH-532 near Village | 51.831 km | 100% for four or more lane, of the |
| U.Ponnalagaram in Cuddalore District of | | base rates mentioned in Table-1 |
| Tamil Nadu | | above. |
+----------------------------------------------------+-------------------------------------------+-----------------------------------------------+
| | 3.847 km | 60% for two lane with paved |
| | | shoulders, of the base rates |
| | | mentioned in Table-1 above. |
+----------------------------------------------------+-------------------------------------------+-----------------------------------------------+
2. In addition to above, the following fee shall also be due and payable for the use of the following structures
having length more than 60 m at the following fee plaza(s), by converting the length of structures in to an equivalent
length of highway by multiplying the length of such structures by an equalisation factor of 10, at the base rate
mentioned in table 1 above:-
Table-3
+----------------------------------------------------+-------------------------------------------+-------------------------------------------+-----------------------------------------------+
| Location of Fee Plaza (chainage) | Length of structures^ (in | equivalent road | Rate at which fee is payable |
| | km) to be converted into | length (in km) | |
| | equivalent road length | | |
+====================================================+===========================================+===========================================+===============================================+
| At Km 45.200 of NH-532 near | 0.2968 | 2.968 | 100% for four or more lane, of |
| Village U.Ponnalagaram in | | | the base rates mentioned in |
| Cuddalore District of Tamil Nadu | | | Table-1 above. |
+----------------------------------------------------+-------------------------------------------+-------------------------------------------+-----------------------------------------------+
| | 0.2261 | 2.261 | 60% for two lane with paved |
| | | | shoulders, of the base rates |
| | | | mentioned in Table-1 above. |
+----------------------------------------------------+-------------------------------------------+-------------------------------------------+-----------------------------------------------+
^ The details of structures (> 60 m length) are as under:-
+-------+-------------------+-----------------------------------+----------------+
| S.No | Chainage | Type of structure | Length(in Km.) |
| +---------+---------+ | |
| | From Km | To Km | | |
+=======+=========+=========+===================================+================+
| 1 | 25/342 | 25/438.8| Major Bridge (4L) | 0.0968 |
+-------+---------+---------+-----------------------------------+----------------+
| 2 | 22/780.259|22/848.559| Grade Separator 22/8 (2L+PS) | 0.0683 |
+-------+---------+---------+-----------------------------------+----------------+
| 3 | 50/904.13|51/061.93| Grade Separator 51/2 (2L+PS) | 0.1578 |
+-------+---------+---------+-----------------------------------+----------------+
| 4 | 53/900 | 54/100 | Major river Bridge (4L) | 0.200 |
+-------+---------+---------+-----------------------------------+----------------+
| | Total | | | 0.5229 |
+-------+---------+---------+-----------------------------------+----------------+
3. The rate of Monthly pass for a person who owns a mechanical vehicle registered for non-commercial purposes
and resides within a distance of twenty kilometers from the fee plaza is Rs.350.00 (Rupees Three hundred and Fifty
Only) for the year 2026-27 and is subject to revision every year as per the provisions of the said rules.
4. For multiple journeys on the highway section, passes shall be issued at the following rates, namely:-
Table-4
+-------------------------------------------------------------+-------------------------------------------+-----------------------------------+
| Amount Payable | Maximum number of one way | Period of validity |
| | journeys allowed | |
+=============================================================+===========================================+===================================+
| One and half times of the fee for one way | Two | Twenty four hours from the time |
| journey | | of payment |
+-------------------------------------------------------------+-------------------------------------------+-----------------------------------+
| Two-third of amount of the fee payable for | Fifty | One month from date of payment |
| fifty single journeys | | |
+-------------------------------------------------------------+-------------------------------------------+-----------------------------------+
5. Fee for commercial vehicle (excluding vehicles plying under National permit) registered in the district where
the fee plaza falls shall be 50% of the specified rate for that category of vehicle provided no service road or alternative
road is available for use of such commercial vehicles.
6. The driver or owner or a person in charge of a mechanical vehicle which is loaded in excess of permissible
load specified for its category, shall be liable to pay fee for entering the overloaded vehicle on the National Highway
to the fee collecting agency, equal to the fee specified in rule 10 of the said rules.
7. All definitions including category of mechanical vehicles, its permissible load, category of exempted vehicles,
service road, alternative road, etc. shall be as per definitions specified in the said rules.
8. The fee rates shall be displayed for information of the users in accordance with rule 12 of the said rules.
9. Based on the base rate of fee per kilometer for the base year 2007-08 as mentioned in Table-1 above, the actual
amount of fee to be charged from the mechanical vehicles and the discounts will be calculated by the National
Highways Authority of India on the basis of the completed length of the section and revised annually in accordance
with the rule 5 of the said rules and the same shall be published in at least one newspaper in English and vernacular
language.
10. The estimated capital cost of the project is Rupees 498.82 Crore. The capital cost is subject to variation as the
activities of land acquisition, utility shifting, tree cutting, etc. are yet to be completed. The National Highways
Authority of India shall maintain a record of the recovery of capital cost through user fee realised.
[F. No. RO/Chennai/MoRTH/12014/NH-532/48/AP/2021-22/ E- 205408]
CHETNA NAND SINGH, Jt. Secy.
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.
Digitally signed by
KUMER CHAND KUMER CHAND MEENA
MEENA
Date: 2026.06.05
14:57:50+05'30"
Login to read full text