REGD. No. D. L.-33004/99
The Gazette of India
CG-DL-E-05052025-262887
EXTRAORDINARY
PART II-Section 3-Sub-section (ii)
PUBLISHED BY AUTHORITY
No. 1953]
NEW DELHI, FRIDAY, MAY 2, 2025/VAISAKHA 12, 1947
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATION
New Delhi, the 1st May, 2025
S.O. 1997(E). - Whereas by notification of the Government of India in the Ministry of Road Transport and
Highways issued under Section 11 of the National Highway Authority of India Act, 1988 (68 to 1988), the Central
Government has entrusted the following sections in the state of Gujarat to the National Highways Authority of India
(hereinafter referred to as the “Authority")
+--------------------+--------------------------+---------------------------------------------------------------------------------------------------------------------------------+
| Notification Details | New National Highway No. | Description of NH |
+====================+==========================+=================================================================================================================================+
| S.O. 5578 (E) dated 27th | NH-751 | The highway starting from its junction with NH-51 |
| Dec, 2024 | | (Nari Junction) near Bhavnagar and terminating at its |
| | | junction with NE-8 near Adhelai in the state of Gujarat. |
| | | [Entire NH falling in the States of Gujarat ] |
+--------------------+--------------------------+---------------------------------------------------------------------------------------------------------------------------------+
| S.O. 5578 (E) dated 27th | NE-8 | The highway starting from its junction with Sardar Patel |
| Dec, 2024 | | Ring Road near Visalpur (Ahmedabad) connecting |
| | | Tajpur, Bhat, Vasna Chacharavadi, Kavitha, Chaloda, |
| | | Juval Roopvati, Sindhrej, Lana, Jalalpur |
| | | (Godhneshwar), Sarandhi, Kariyana, Rupgadh, |
| | | Keshargadh, Vejalka, Saragvala, Bholad, Anandpur, |
| | | Valinda, Ambali, dholera, Sandhida, Hebatpur and |
| | | terminating at its junction with NH-751 near Adhelai in |
| | | the state of Gujarat |
| | | [Entire NH falling in the States of Gujarat] |
+--------------------+--------------------------+---------------------------------------------------------------------------------------------------------------------------------+
Now, therefore, in exercise of the powers conferred by section 7 of the National Highways Act, 1956 (48 of
1956), read with rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008
(hereinafter referred to as the "rules"), and in supersession of Gazette Fee Notification published vide S.O. 5417(E)
dated 27.12.2021, the Central Government hereby levies the fee on the type of vehicles specified in Column (1) of the
Table-1, at the rate specified in column (2) of the Table 1 for net road section length of 30.727 km (Table-2) and for
equivalent structure length (having length more than 60m) of 25.810 Km (having length of 2.581 km, Table-3) for the
use of four or more lane section of Adhelai Village to Nari Junction section from design kilometer 136.000 to
kilometer 169.308 (existing km 136.025 to km 169.328) of NH-751 and at 125% of the rate specified in Column (2) of
the Table 1 for net road section length of 23.860 km [Table-2) and for equivalent structure length (having length more
than 60m) 4.500 Km (having length of 0.450 Km, (Table-3)] for the use of National Expressway section of design
kilometer 84.709 to kilometer 109.019 of NE-8 and authorises the Authority to collect, either through its officials or
through a contractor, the said fee, namely:-
Table-1
+----------------------------------------------------------------+-----------------------------------------------------------------+
| Type of vehicle | Base rate of fee per km for the base year 2007-08 |
| (1) | (in Rupees) |
| | (2) |
+================================================================+=================================================================+
| Car, Jeep, Van or Light Motor Vehicle | 0.65 |
+----------------------------------------------------------------+-----------------------------------------------------------------+
| Light Commercial Vehicle, Light Goods Vehicle or Mini Bus | 1.05 |
+----------------------------------------------------------------+-----------------------------------------------------------------+
| Bus or Truck (Two Axles) | 2.20 |
+----------------------------------------------------------------+-----------------------------------------------------------------+
| Three-axle commercial vehicles | 2.40 |
+----------------------------------------------------------------+-----------------------------------------------------------------+
| Heavy Construction Machinery (HCM) or Earth Moving | 3.45 |
| Equipment (EME) or Multi Axle Vehicle (MAV) (four to six | |
| axles) | |
+----------------------------------------------------------------+-----------------------------------------------------------------+
| Oversized Vehicles (seven or more axles) | 4.20 |
+----------------------------------------------------------------+-----------------------------------------------------------------+
1. The fee to be levied and collected hereunder shall be due and payable at the Fee Plaza for net road length
specified for such Fee Plaza namely: -
Table-2
+------------------------------+---------------------------------------------------------------------+------------------------------+
| Location of Fee Plaza | Length (in km) for which Fee is payable | Rate at which fee is payable |
| (chainage) | | |
+==============================+=====================================================================+==============================+
| At Design Km | For section from design Km 136.000 to Km 169.308 of NH-751 | |
| 142.290 of NH-751 | | |
| near Bhadbhid | 30.727 [Excluding length of Bypass (costing >10 Cr.) and | 100% for four or more lane of the |
| village in Bhavnagar | length of structures (>60m)] | base rates mentioned in Table-1 |
| district of Gujarat. | | above |
+------------------------------+---------------------------------------------------------------------+------------------------------+
| | For section from design Km 84.709 to Km 109.019 of NE-8 | |
+------------------------------+---------------------------------------------------------------------+------------------------------+
| | 23.860 [Excluding length of Bypass (costing >10 Cr.) and | 125% for four or more lane of the |
| | length of structures (>60m)] | base rates mentioned in Table-1 |
| | | above |
+------------------------------+---------------------------------------------------------------------+------------------------------+
2. In addition to above, the following fee shall also be due and payable for the use of the following structures
having length more than 60m at the following Fee Plaza(s), by converting the length of structures into an equivalent
length of highway by multiplying the length of such structures by an equalization factor of 10: -
Table-3
+------------------------------+---------------------------------------------+-----------------------------+------------------------------+
| Location of Fee Plaza | Length of structures^ (in km.) | Equivalent road | Rate at which fee is payable |
| (chainage) | to be converted into equivalent | length (in km.) | |
| | road length | | |
+==============================+=============================================+=============================+==============================+
| At Design Km. 142.290 | For section from design Km. 136.000 to Km. 169.308 of NH-751 | | |
| of NH-751 near | | | |
| Bhadbhid village in | 2.581 | 25.810 | 100% for four or more lane of the |
| Bhavnagar district of | | | base rates mentioned in Table-1 |
| Gujarat. | | | above |
+------------------------------+---------------------------------------------+-----------------------------+------------------------------+
| | For section from design Km. 84.709 to Km. 109.019 of NE-8 | | |
+------------------------------+---------------------------------------------+-----------------------------+------------------------------+
| | 0.450 | 4.500 | 125% for four or more lane of the |
| | | | base rates mentioned in Table-1 |
| | | | above |
+------------------------------+---------------------------------------------+-----------------------------+------------------------------+
^The detail is as under:-
+-------+-------------------+-------------------+---------------------+----------------+
| SI. | Chainage | | Type of Structure | Length (in km.)|
| No. | From Km. | To Km. | | |
+=======+===================+===================+=====================+================+
| | For section from design kilometer 136.000 to kilometer 169.308 of NH-751 | |
+-------+-------------------+-------------------+---------------------+----------------+
| 1 | 138.495 | 139.955 | Elevated Corridor which includes | 1.460 |
| | | | 120m Major Bridge in between @| |
| | | | design | |
| | | | chainage 139.040 | |
+-------+-------------------+-------------------+---------------------+----------------+
| 2 | 143.324 | 143.469 | Major Bridge | 0.145 |
+-------+-------------------+-------------------+---------------------+----------------+
| 3 | 147.445 | 147.565 | Major Bridge | 0.120 |
+-------+-------------------+-------------------+---------------------+----------------+
| 4 | 152.860 | 153.042 | Major Bridge | 0.182 |
+-------+-------------------+-------------------+---------------------+----------------+
| 5 | 159.746 | 160.046 | Major Bridge | 0.300 |
+-------+-------------------+-------------------+---------------------+----------------+
| 6 | 162.777 | 162.939 | Major Bridge | 0.162 |
+-------+-------------------+-------------------+---------------------+----------------+
| 7 | 167.940 | 168.152 | ROB | 0.212 |
+-------+-------------------+-------------------+---------------------+----------------+
| | | Total | | 2.581 |
+-------+-------------------+-------------------+---------------------+----------------+
| | For section from design kilometer 84.709 to kilometer 109.019 of NE-8 | |
+-------+-------------------+-------------------+---------------------+----------------+
| 1 | 93.265 | 93.490 | Major Bridge | 0.225 |
+-------+-------------------+-------------------+---------------------+----------------+
| 2 | 101.717 | 101.942 | Major Bridge | 0.225 |
+-------+-------------------+-------------------+---------------------+----------------+
| | | Total | | 0.450 |
+-------+-------------------+-------------------+---------------------+----------------+
3. The rate of monthly pass for a person who owns a mechanical vehicle registered for non-commercial purposes and
resides within a distance of twenty kilometres from the fee plaza is Rs. 340.000 (Rupees Three Hundred and Forty
Only) for the year 2024-25 and is subject to revision every year as per the provisions of the said rules.
4. For multiple journeys on the highway section, passes shall be issued at the following rates, namely: -
Table-4
+-------------------------------------------+---------------------------------------------------+-----------------------------+
| Amount Payable | Maximum number of one way | Period of validity |
| | journeys allowed | |
+===========================================+===================================================+=============================+
| One and one-half times of the fee for one | Two | Twenty four hours from the time |
| way journey | | of payment |
+-------------------------------------------+---------------------------------------------------+-----------------------------+
| Two-third of amount of the fee payable | Fifty | One month from date of payment|
| for fifty single journeys | | |
+-------------------------------------------+---------------------------------------------------+-----------------------------+
5. Fee for commercial vehicle (excluding vehicles plying under National permit) registered in the district where the
fee plaza falls shall be 50% of the specified rate for that category of vehicle provided no service road or alternative
road is available for use of such commercial vehicles.
6. The driver or owner or a person in charge of a mechanical vehicle which is loaded in excess of permissible load
specified for its category, shall be liable to pay fee for entering the overloaded vehicle on the National Highway to the
fee collecting agency, equal to the fee specified in sub-rule 1A of rule 10 of the said rules, and shall not be entitled to
make use of the highway section unless the excess load has been removed from such mechanical vehicle.
7. All definitions including category of mechanical vehicles, its permissible load, category of exempted vehicles,
service road, alternative road, etc. shall be as per definitions specified in the said rules.
8. The fee rates shall be displayed for information of the users in accordance with rule 12 of the said rules.
9. Based on the base rate of fee per kilometer for the base year 2007-08 as mentioned in Table-1 above, the actual
amount of fee to be charged from the mechanical vehicles and the discounts will be calculated by the Authority on the
basis of the completed length of the section and revised annually in accordance with the rule 5 of the said rules and the
same shall be published in at least one newspaper in English and vernacular language.
10. The estimated capital cost of the project is Rupees 2038.68 crore. The capital cost is subject to variation as the
activities of land acquisition, utility shifting, tree cutting, etc. are yet to be completed. The Authority shall maintain a
record of the recovery of capital cost through user fee realised.
[F. No. NHAI/PIU-Ahmedabad/Pipli-Bhavnagar/NH-751/TollNotification/2020-21/E-197590]
KAMLESH CHATURVEDI, Jt. Secy.