Notification under section 7 of the National Highways Act, 1956 levying and revising user fees for the Gadu-Porbandar section of NH-8E/NH-51 in Gujarat, superseding the earlier fee notification of 18 December 2020.

Detailed Summary

In S.O. 5153(E) dated 29th November 2023, the Ministry of Road Transport and Highways notes that under S.O. 2223(E) dated 14th July 2017 (issued under section 11 of the National Highways Authority of India Act, 1988 (68 of 1988)) it had entrusted the Km 263.200 to Km 473.000 stretch of the Gadu-Porbandar-Dwarka section of NH-8E in Gujarat to the National Highways Authority of India (NHAI); exercising powers under section 7 of the National Highways Act, 1956 (48 of 1956) read with rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008, and superseding fee notification S.O. 4635(E) dated 18th December 2020, the Central Government levies fee at 60% of the base rate for a two-lane paved-shoulder net road length of 40.389 km and 100% of the base rate for a four-lane net road length of 47.797 km, plus a 150% surcharge for the 1.985 km, Rs. 12.38 crore Chorwad Bypass of NH-51, and additional fee for five major bridges (total 1.499 km) converted at a 10x equalisation factor, all collectible by NHAI at the Fee Plaza at Km/Ch. 342.512 near Gorsar village, Porbandar district, Gujarat; the monthly local-resident pass is fixed at Rs. 330 for 2023-24, with multiple-journey and overloaded-vehicle surcharge provisions also prescribed under the said rules, and the project's estimated capital cost is stated as Rs. 582.49 crore, subject to variation; issued under F. No. NHAI/Tech/PIU-Somnath/Gorsar/Gazzete Notification/2023/E-225730 and signed by Suman Prasad Singh, Joint Secretary.

Full Text

7468 GI/202 3 (1) EXTRAORDINARY PART II —Section 3 —Sub-section ( ii) PUBLISHED BY AUTHORITY No. 4928] NEW DELHI, FRIDAY , DEC EMBER 1, 2023/ AGRAHAYANA 10, 1945 CG-DL-E-04122023-250403 (1) (2) 342.512 पर 47.797 40.389 292.945 294.930 305.607 305.679 बड़े पुल (2- लेन) 0.072 322.201 322.398 बड़े पुल (2- लेन) 0.197 338.194 338.294 बड़े पुल (4- लेन) 0.100 361.583 362.063 बड़े पुल (4- लेन) 0.480 374.705 375.355 बड़े पुल (4- लेन) 0.650 1.499 MINISTRY OF ROAD TRANSPORT AND HIGHWAYS NOTIFICATION New Delhi, the 29th November , 2023 S.O. 5 153(E).— Whereas by notification of the Government of India in the Ministry of Road Transport and Highwa ys number S.O. 2223(E) dated the 14th July, 2017 issued under Section 11 of the National Highways Authority of India Act 1988 (68 of 1988), the Central Government has entrusted the stretch from kilometer 263.200 to kilometer 473.000 of Gadu -Porbandar -Dwark a section of National Highway 8E in the state of Gujarat to the National Highways Authority of India (hereinafter referred to as the "Authority"); Now, therefore, in exercise of the powers conferred by section 7 of t he National Highways Act, 1956 (48 of 1956), read with rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008 (hereinafter referred to as the "rules") and in supersession of the fee notification issued vide S.O. 4635 (E) da ted 18th December 2020, the Central Government hereby levies the fee at sixty percent of the rate specified in column (2) of the Table 1 for net road section length of 40.389 km and for equivalent structure length ( having length more than 60 m) of 2.69 km (having length of 0.269 km ) for the use of two lane with paved shoulder and at hundred percent of the rate specified in column (2) of the Table 1 for net road section length of 47.797 kms and for equivalent structure length (having length more than 60m) of 12.30 km (having length of 1.23 km) and at one and one half times the base rate for bypasses having length of 1.985 km costing rupees ten crore or more for the use of four or more lane on the type of vehicles specified in column (1) of the Table 1 below of Gadu -Porbandar Section from design kilometer 287.430 to kilometer 379.100 (existing km 263.200 to km 356.766) of National Highway number 8E in the State of Gujarat and authorises the Authority to collect, either through its officials or through a contr actor, the said fee, namely:— Table 1 Type of vehicle Base rate of fee per km for the base year 2007 -08 (in Rupees) (1) (2) Car, Jeep, Van or Light Motor Vehicle 0.65 Light Commercial Vehicle, Light Goods Vehicle or Mini Bus 1.05 Bus or Truck (Two Ax les) 2.20 Three -axle commercial vehicles 2.40 Heavy Construction Machinery (HCM) or Earth Moving Equipment (EME) or Multi Axle Vehicle (MAV) (four to six axles) 3.45 Oversized Vehicles (seven or more axles) 4.20 1. The fee to be levied and collec ted hereunder shall be due and payable at the Fee Plaza for net road length specified for such Fee Plaza(s) namely: - Table 2 Location of Fee Plaza (chainage) Length (in km) for which Fee is payable Rate at which fee is payable At Km/Ch. 342.512 of NH-51 near Gorsar village in Porbandar district of State of Gujarat 47.797 [Excluding length of Bypass (costing >10 Cr.) and length of structures (>60m)] 100% for four or more lane, of the base rates mentioned in Table -1 above 40.389 [Excluding length of Byp ass (costing >10 Cr.) and length of structures (>60m)] 60% for two lane with paved shoulders, of the base rates mentioned in Table -1 above 2. In addition to above, the following fee shall also be due and payable for the use of the bypass costing Rs 10 crore or more at the following Fee Plaza for net bypass length specified for such Fee Plaza(s) : - Table -3 Location of Fee Plaza (Chainage) Name of the Bypass Taking Off Merging at Length and Cost of bypass for which additional fee is payable Rate at which fee is payable Length (in Km.) Cost (in Rs. Crore) At Km/Ch. 342.512 of NH -51 near Gorsar village in Porbandar district of State Gujarat Chorwad Bypass of NH - 51 Design km 292.945 (existing km 268.760) Design km 294.930 (existing km 271.271) 1.985 12.38 150% for four or more lane, of the base rates mentioned in Table -1 above 3. In addition to above, the following fee shall also be due and payable for the use of the following structures having length more than 60m at the following Fe e Plaza(s), by converting the length of structures into an equivalent length of highway by multiplying the length of such structures by an equalisation factor of 10: - Table 4 Location of Fee Plaza (chainage) Length of structures^ (in km) to be converted into equivalent road length Equivalent road length (in km) Rate at which fee is payable) At Km/Ch. 342.512 of NH - 51 near Gorsar village in Porbandar district of State Gujarat 1.230 12.300 100% for four or more lane, of the base rates mentioned in Table -1 above 0.269 2.690 60% for two lane with paved shoulders, of the base rates mentioned in Table -1 above ^The details are as under: - Chainage Type of Structure Length(in km) From Km To Km 305.607 305.679 Major Bridge (2 - Lane) 0.072 322.201 322.398 Major Bridge (2 - Lane) 0.197 338.194 338.294 Major Bridge (4 - Lane) 0.100 361.583 362.063 Major Bridge (4 - Lane) 0.480 374.705 375.355 Major Bridge (4 - Lane) 0.650 Total 1.499 4. The rate of monthly pass for a person who owns a mechanica l vehicle registered for non -commercial purposes and resides within a distance of twenty kilometres from the fee plaza is Rs 330.000 (Rupees Three Hundred and Thirty only) for the year 2023 -24 and is subject to revision every year as per the provisions of the said rules. 5. For multiple journeys on the highway section, passes shall be issued at the following rates, namely: - Table 5 Amount Payable Maximum number of one way journeys allowed Period of validity One and half times of the fee for one w ay journey Two Twenty four hours from the time of payment Two-third of amount of the fee payable for fifty single journeys. Fifty One month from date of payment 6. Fee for commercial vehicle (excluding vehicles plying under National permit) regist ered in the district where the fee plaza falls shall be 50% of the specified rate for that category of vehicle provided no service road or alternative road is available for use of such commercial vehicles. 7. The driver or owner or a person in charg e of a mechanical vehicle which is loaded in excess of permissible load specified for its category, shall be liable to pay fee for entering the overloaded vehicle on the National Highway to the fee collecting agency, equal to the fee specified in sub -rule 1A of rule 10 of the said rules, and shall not be entitled to make use of the highway section unless the excess load has been removed from such mechanical vehicle. 8. All definitions including category of mechanical vehicles, its permissible load, c ategory of exempted vehicles, service road, alternative road, etc. shall be as per definitions specified in the said rules. 9. The fee rates shall be displayed for information of the users in accordance with rule 12 of the said rules. 10. Based on the base rate of fee per kilometer for the base year 2007 -08 as mentioned in Table -1 above, the actual amount of fee to be charged from the mechanical vehicles and the discounts will be calculated by the Authority on the basis of the completed length o f the section and revised annually in accordance with the rule 5 of the said rules and the same shall be published in at least one newspaper in English and vernacular language. 11. The estimated capital cost of the project is Rupees 582.49 crore and the capital cost is subject to variation as the activities of land acquisition, utility shifting, tree cutting, etc. are yet to be completed. The Authority shall maintain a record of the recovery of capital cost through user fee realised. [F. No. NHAI/T ech/PIU -Somnath/Gorsar/Gazzete Notification/2023/E -225730] SUMAN PRASAD SINGH , Jt. Secy. Uploaded by Dte. of Printing at Government of India Press, Ring R oad, Mayapuri, New Delhi -110064 and Published by the Controller of Publications, Delhi -110054.

Never miss important gazettes

Create a free account to save gazettes, add notes, and get email alerts for keywords you care about.

Sign Up Free