Full Text
4912 GI/202 3 (1) रजिस्ट्री सं. डी.एल.- 33004/99 REGD. No . D. L. -33004/99
EXTRAORDINARY
PART II—Section 3—Sub-section ( ii)
PUBLISHED BY AUTHORITY
No. 3264] NEW DELHI , MON DAY, JULY 31, 2023/ SHRAVANA 9, 1945
CG-DL-E-02082023-247778
CG-DL-E-02082023-247778
(1) (2)
613+720
452+420
464+220
494+220
537+320
586+420
600+020
613+720
674+720
696+920
452+420
होते हुए 0.000 11.430 41.128 82.700 130.279 143.509 157.209 213.012 233.882
464+220
प्लाज़ा 11.430 0.000 29.698 71.270 118.849 132.079 145.779 201.582 222.452
494+220
प्लाज़ा 41.128 29.698 0.000 41.572 89.151 102.381 116.081 171.884 192.754
537+32 0
प्लाज़ा 82.700 71.270 41.572 0.000 47.579 60.809 74.509 130.312 151.182
586+420
प्लाज़ा 130.279 118.849 89.151 47.579 0.000 13.230 26.930 82.733 103.603
600+020
प्लाज़ा 143.509 132.079 102.381 60.809 13.230 0.000 13.700 69.503 90.373
613+720
प्लाज़ा 157.209 145.779 116.081 74.509 26.930 13.700 0.000 55.803 76.673
674+720
प्लाज़ा 213.012 201.582 171.884 130.312 82.733 69.503 55.803 0.000 20.870
696+920
छोर 233.882 222.452 192.754 151.182 103.603 90.373 76.673 20.870 0.000
(1) (2) (3) (4) (5)
613+720
452+42
464+22
494+22
537+32
586+42
600+02
613+72
674+72
696+92
452+42
होते हुए 0.000 3.700 6.720 22.000 37.210 40.910 40.910 92.880 106.180
464+22
प्लाज़ा 3.700 0.000 3.020 18.300 33.510 37.210 37.210 89.180 102.480
494+22
प्लाज़ा 6.720 3.020 0.000 15.280 30.490 34.190 34.190 86.160 99.460
537+32
प्लाज़ा 22.000 18.300 15.280 0.000 15.210 18.910 18.910 70.880 84.180
586+42
प्लाज़ा 37.210 33.510 30.490 15.210 0.000 3.700 3.700 55.670 68.970
600+02
प्लाज़ा 40.910 37.210 34.190 18.910 3.700 0.000 0.000 51.970 65.270
613+72
प्लाज़ा 40.910 37.210 34.190 18.910 3.700 0.000 0.000 51.970 65.270
674+72
प्लाज़ा 92.880 89.180 86.160 70.880 55.670 51.970 51.970 0.000 13.300
696+92
छोर 106.180 102.480 99.460 84.180 68.970 65.270 65.270 13.300 0.000
17 एमिेबी 454+091 0.080 0.800
2 एमिेबी 455+804 0.142 1.420
3 एमिेबी 458+029 0.079 0.790
4 एमिेबी 459+101 0.069 0.690
5 एमिेबी 467+862 0.082 0.820
6 एमिेबी 469+507 0.064 0.640
7 एमिेबी 473+055 0.061 0.610
18 एमिेबी 490+718 0.095 0.950
9 एमिेबी 497+39 0.084 0.840
10 एमिेबी 498+015 0.210 2.100
11 एमिेबी 499+502 0.140 1.400
12 एमिेबी 504+640 0.090 0.900
13 एमिेबी 507+100 0.070 0.700
14 एमिेबी 514+838 0.210 2.100
15 इंटरचेंि 494+411 0.128 1.280
19 एमिेबी 520+772 0.386 3.860
17 एमिेबी 526+828 0.210 2.100
18 एमिेबी 540+614 0.066 0.660
19 एमिेबी 545+035 0.210 2.100
20 एमिेबी 552+131 0.105 1.050
21 एमिेबी 558+913 0.420 4.200
22 एमिेबी 559+316 0.140 1.400
23 एमिेबी 559+885 0.070 0.700
24 एमिेबी 560+342 0.105 1.050
25 एमिेबी 561+815 0.210 2.100
26 एमिेबी 568+624 0.105 1.050
27 *इंटरचेंि 586+420 0.180 1.800
28 आरओबी 595+816 0.210 2.100
29 एमिेबी 599+110 0.070 0.700
30 एमिेबी 618+290 0.140 1.400
31 एमिेबी 620+200 0.455 4.550
32 एमिेबी 620+743 0.070 0.700
33 आरओबी 626+081 0.112 1.120
34 एमिेबी 626+618 0.315 3.150
23 एमिेबी 627+640 0.245 2.450
36 एमिेबी 628+285 0.070 0.700
37 एमिेबी 628+275 0.910 9.100
38 एमिेबी 634+835 0.140 1.400
39 एमिेबी 641+0 90 0.105 1.050
40 एमिेबी 644+730 0.560 5.600
41 एमिेबी 649+754 0.105 1.050
42 एमिेबी 650+445 0.105 1.050
43 एमिेबी 652+430 0.070 0.700
24 एमिेबी 656+397 0.105 1.050
45 एमिेबी 656+668 0.080 0.800
46 एमिेबी 657+683 0.070 0.700
47 एमिेबी 660+810 0.105 1.050
48 एमिेबी 663+295 0.245 2.450
49 एमिेबी 664+813 0.140 1.400
50 एमिेबी 665+175 0.105 1.050
51 एमिेबी 665+528 0.070 0.700
52 एमिेबी 666+614 0.245 2.450
53 एमिेबी 668+185 0.140 1.400
54 एमिेबी 668+516 0.070 0.700
55 एमिेबी 669+020 0.105 1.050
56 एमिेबी 671+790 0.140 1.400
57 एमिेबी 673+615 0.105 1.050
*इंटरचेंि 674+707 0.140 1.400
59 एमिेबी 675+549 0.245 2.450
25 एमिेबी 676+085 0.070 0.700
61 एमिेबी 676+ 690 0.105 1.050
62 एमिेबी 678+228 0.105 1.050
63 एमिेबी 678+411 0.105 1.050
64 एमिेबी 678+764 0.070 0.700
65 एमिेबी 689+868 0.105 1.050
66 एमिेबी 691+790 0.070 0.700
67 एमिेबी 693+360 0.070 0.700
68 एमिेबी 694+204 0.070 0.700
69 एमिेबी 695+ 914 0.245 2.450
कुल 10.618 106.180
452+42
464+22
494+22
537+32
586+42
600+02
613+72
674+72
696+92
452+42
होते हुए 0.000 15.130 47.848 104.700 167.489 184.419 198.119 305.892 340.062
464+22
प्लाज़ा 15.130 0.000 32.718 89.570 152.359 169.289 182.989 290.762 324.932
494+22
प्लाज़ा 47.848 32.718 0.000 56.852 119.641 136.571 150.271 258.044 292.214
537+32
प्लाज़ा 104.700 89.570 56.852 0.000 62.789 79.719 93.419 201.192 235.362
586+42
प्लाज़ा 167.489 152.359 119.641 62.789 0.000 16.930 30.630 138.403 172.573
600+02
प्लाज़ा 184.419 169.289 136.571 79.719 16.930 0.000 13.700 121.473 155.643
613+720
प्लाज़ा 198.119 182.989 150.271 93.419 30.630 13.700 0.000 107.773 141.943
674+72
प्लाज़ा 305.892 290.762 258.044 201.192 138.403 121.473 107.773 0.000 34.170
696+92
छोर 340.062 324.932 292.214 235.362 172.573 155.643 141.943 34.170 0.000
41+800
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATION
New Delhi , the 27th July, 20 23
S.O. 3411(E).—Whereas by notification of the Government of India in the Ministry of Road Transport and
Highways number S.O. 515 (E) dated 03 02.2021 issued under section 11 of the National Highways Authority of India
Act, 1988 (68 of 1988), the Central Government has entrusted the stretch starting from its junction with new NH -
248A near Sohna connecting Firozpur Jhirka in the state of Haryana, Dausa, Lalsot, Sawai Madhopur, Kota, Jhalawar
in the state of Rajasthan, Jaora, Ratlam in the state of Madhya Pr adesh, Dahod, Godra and terminating at its junction
with NH 48 near Dodka (Vadodara) in the State of Gujarat to the National Highways Authority of India (hereinafter
referred to as the “Authority”).
Now, therefore, in exercise of the powers conferred by se ction 7 of the National Highways Act, 1956 (48 of
1956), read with Rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008 and
amended from time to time (hereinafter referred to as the “Rules”), the Central Government, hereb y levies the fee on
mechanical vehicles at 125% of the rate specified in Column (2) of the Table 1 (hereinafter referred to as “ base rate”)
net road section length of 233.882 Km and for equivalent structure length (having length more than 60m) of 106.180
Km (having length of 10.618), for the use of 8 lane section on the Type of Vehicles specified in Column (1) of the
Table 1 below for the use of section from Km 452+420 to Km 696+920 (length 244.500 Km) on National Highway
No.NE -4 in the State of Madhya Pra desh, which is part of Expressway notified as NE -4 vide S.O. No. 2142 (E) dated
03.06.2021 and authorizes the Authority to collect, either through its officials or through a contractor, the said fee
under “Closed User Fee Collection System”, namely: -
Table 1
Type of vehicle Base rate of fee per Km for the
Base Year 2007 -08 (in Rupees)
(1) (2)
Car, Jeep, Van or Light Motor Vehicle 0.65
Light Commercial Vehicle, Light Goods Vehicle or Mini Bus 1.05
Bus or Truck (Two Axles) 2.20
Three -axle commercial vehicles 2.40
Heavy Construction Machinery (HCM) or Earth Moving Equipment
(EME) or Multi Axle Vehicle (MAV) (four to six axles) 3.45
Oversized Vehicles (seven or more axles) 4.20
1. The fee to be levied and collected hereunder shall be due and payable at the following Fee Plaza (s) for net road
length specified between any two of such Fee Plazas: -
Table -2
Sl.
No.
Location of Fee Plaza (chainage) Length (in Km) for which
fee is payable (Excluding
Structures >
60m length)
Rate at which fee is
payable
(1) (2) (3) (4)
1.
Km 464+220 (Interchange MP-01 Fee
Plaza)on(Bhanpura – Jhalawar Road)
Neemthur Village in Mandsaur District
as per the distance matrix
at Table No. 3 below
125% of the base
rates mentioned in
Table No. - 1 above. 2. Km 494+220
(Interchange MP-02Fee Plaza) on(Suwasara –
Bhanpura Road)
Garoth Village in Mandsaur District
3. Km 537+320
(Interchange MP-03 Fee Plaza) on (Dug –
Sitamau Road )
Dalavada Village in Mandsaur District
4. Km 586+420
(Interchange MP-04 Fee Plaza) on (Jaora –
Ujjain Road )
Bhuteda Village in Ratlam District
5. Km 600+020
(Interchange MP-05 Fee Plaza)
on(Mhow – Neemuch Road )
Nayapura Village in Ratlam District
6. Km 613+720
(Interchange MP-06 Fee Plaza)
on (Ratlam -Sailana Road )
Dhamnod Village in Ratlam District
7. Km 674+720
(Interchange MP-07 Fee Plaza)
on (Thandla -Kushalgarh Road )
Timarwani Village in Jhabua District
Table 3
Distance matrix for road length (Excluding length of structures >60 m)
Sr.No. From Starting
Point at
Km
452+420 Fee
plaza at
Km
464+220 Fee
Plaza
Km
494+220 Fee
Plaza
Km
537+320 Fee
Plaza
Km
586+420 Fee
Plaza
Km
600+020 Fee
Plaza
Km
613+720 Fee
Plaza
Km
674+720 End
point
km
696+920
1 Starting
Point at
Km
452+420 0.000 11.430 41.128 82.700 130.279 143.509 157.209 213.012 233.882
2 Fee plaza
at Km
464+220 11.430 0.000 29.698 71.270 118.849 132.079 145.779 201.582 222.452
3 Fee
Plaza
Km
494+220 41.128 29.698 0.000 41.572 89.151 102.381 116.081 171.884 192.754
4 Fee
Plaza
Km
537+320 82.700 71.270 41.572 0.000 47.579 60.809 74.509 130.312 151.182
5 Fee
Plaza
Km
586+420 130.279 118.849 89.151 47.579 0.000 13.230 26.930 82.733 103.603
6 Fee
Plaza
Km
600+020 143.509 132.079 102.381 60.809 13.230 0.000 13.700 69.503 90.373
7 Fee
Plaza
Km
613+720 157.20 9 145.779 116.081 74.509 26.930 13.700 0.000 55.803 76.673
8 Fee
Plaza
Km
674+720 213.012 201.582 171.884 130.312 82.733 69.503 55.803 0.000 20.870
9 End
point km
696+920 233.882 222.452 192.754 151.182 103.603 90.373 76.673 20.870 0.000
2. In addition to above, the following fee shall also be due and payable for the use of the following structures
having length more than 60 m at the following Fee plaza, by converting the length of structures into an equivalent
length of highway by multiplying the length of such structures by an equalization factor of 10:
Table -4
S.
No.
Location of Fee Plaza (chainage) Length (in
Km) for which
fee is
payable Equivalent
road length
(in km) Rate at which fee is
payable
(1) (2) (3) (4) (5)
1. Km 464+220 ( Interchange M P-01
Fee Plaza)
on (Bhanpura – Jhalawar Road)
Neemthur Village in Mandsaur
District
As per the
distance matrix
for structures >
60 m length at
Table 5 below
10 times of the
distance as per
col.3
125% of the base rates
mentioned in Table No.
- 1 above. 2. Km 494+220
(Interchange MP-02Fee Plaza)
on (Suwasara – Bhanpura Road )
Garoth Village in Mandsaur District
3. Km 537+320
(Interchange MP-03Fee Plaza) on
(Dug – Sitamau Road )
Dalavada Village in Mandsaur District
4. Km 586+420
(Interchange MP-04 Fee Plaza) on
(Jaora – Ujjain Road )
Bhuteda Village in Ratlam District
5. Km 600+020
(Interchange MP-05 Fee Plaza)
on(Mhow – Neemuch Road )
Nayapura Village in Ratlam District
6. Km 613+720
(Interchange MP-06 Fee Plaza)
on(Ratlam -Sailana Road )
Dhamnod Village in Ratlam District
7. Km 674+720
(Interchange MP-07 Fee Plaza)
on(Thandla -Kushalgarh Road)
Timarwani Village in Jhabua District
Table - 5
Distance matrix for road length of structures (> 60m length) betwee n Fee Plazas x 10
Sr.No. From Starting
Point
Km
452+420 Fee
plaza at
Km
464+220 Fee
Plaza
Km
494+220 Fee
Plaza
Km
537+320 Fee
Plaza
Km
586+4
20 Fee
Plaza
Km
600+02
0 Fee
Plaza
Km
613+720 Fee
Plaza
Km
674+72
0 End
point
km
696+920
1 Starting Point
Km 452 +420 0.000 3.700 6.720 22.000 37.210 40.910 40.910 92.880 106.180
2 Fee plaza at
Km 464+220 3.700 0.000 3.020 18.300 33.510 37.210 37.210 89.180 102.480
3 Fee Plaza Km
494+220 6.720 3.020 0.000 15.280 30.490 34.190 34.190 86.160 99.460
4 Fee Plaza Km
537+320 22.000 18.300 15.280 0.000 15.210 18.910 18.910 70.880 84.180
5 Fee Plaza Km
586+420 37.210 33.510 30.490 15.210 0.000 3.700 3.700 55.670 68.970
6 Fee Plaza Km
600+020 40.910 37.210 34.190 18.910 3.700 0.000 0.000 51.970 65.270
7 Fee Plaza Km
613+ 720 40.910 37.210 34.190 18.910 3.700 0.000 0.000 51.970 65.270
8 Fee Plaza Km
674+720 92.880 89.180 86.160 70.880 55.670 51.970 51.970 0.000 13.300
9 End point km
696+920 106.180 102.480 99.460 84.180 68.970 65.270 65.270 13.300 0.000
The details of structures having length more than 60m are as under: -
Table 5A
Sr.No. Package Type of
Structure Design,
Km Length of Structure
(in Km) Equivalent Length (in
Km)
A B C D E F=E x 10
17 MJB 454+091 0.080 0.800
2 MJB 455+804 0.142 1.420
3 MJB 458+02 9 0.079 0.790
4 MJB 459+101 0.069 0.690
MP-01 Interchange Fee Plaza (Ch.464+220)
5 MJB 467+862 0.082 0.820
6 MJB 469+507 0.064 0.640
7 MJB 473+055 0.061 0.610
18 MJB 490+718 0.095 0.950
MP-02 Interchange Fee Plaza (Ch.494+220)
9 MJB 497+39 0.084 0.840
10 MJB 498+015 0.210 2.100
11 MJB 499+502 0.140 1.400
12 MJB 504+640 0.090 0.900
13 MJB 507+100 0.070 0.700
14 MJB 514+838 0.210 2.100
15 Interchange 494+411 0.128 1.280
19 MJB 520+772 0.386 3.860
17 MJB 526+828 0.210 2.100
MP-03 Interchange Fee Plaza (Ch.537+320)
18 MJB 540+614 0.066 0.660
19 MJB 545+035 0.210 2.100
20 MJB 552+131 0.105 1.050
21 MJB 558+913 0.420 4.200
22 MJB 559+316 0.140 1.400
23 MJB 559+885 0.070 0.700
24 MJB 560+342 0.105 1.050
25 MJB 561+815 0.210 2.100
26 MJB 568+624 0.105 1.050
21 *Interchange 586+420 0.180 1.800
MP-04 Interchange Fee Plaza (Ch.586+420)
28 ROB 595+816 0.210 2.100
29 MJB 599+110 0.070 0.700
MP-05 Interchange Fee Plaza (Ch.600+020)
22 MP-06 Interchange Fee Plaza (Ch.613+720)
30 MJB 618+290 0.140 1.400
31 MJB 620+200 0.455 4.550
32 MJB 620+743 0.070 0.700
33 ROB 626+081 0.112 1.120
34 MJB 626+618 0.315 3.150
23 MJB 627+640 0.245 2.450
36 MJB 628+285 0.070 0.700
37 MJB 628+275 0.910 9.100
38 MJB 634+835 0.140 1.400
39 MJB 641+090 0.105 1.050
40 MJB 644+730 0.560 5.600
41 MJB 649+754 0.105 1.050
42 MJB 650+445 0.105 1.050
43 MJB 652+430 0.070 0.700
24 MJB 656+397 0.105 1.050
45 MJB 656+668 0.080 0.800
46 MJB 657+683 0.070 0.700
47 MJB 660+810 0.105 1.050
48 MJB 663+295 0.245 2.450
49 MJB 664+813 0.140 1.400
50 MJB 665+175 0.105 1.050
51 MJB 665+528 0.070 0.700
52 MJB 666+614 0.245 2.450
53 MJB 668+185 0.140 1.400
54 MJB 668+516 0.070 0.700
55 MJB 669+020 0.105 1.050
56 MJB 671+790 0.140 1.400
57 MJB 673+615 0.105 1.050
58 *Interchange 674+707 0.140 1.400
25 MP-07 Interchange Fee Plaza (Ch.674+720)
59 MJB 675+549 0.245 2.450
60 MJB 676+085 0.070 0.700
61 MJB 676+690 0.105 1.050
62 MJB 678+228 0.105 1.050
63 MJB 678+411 0.105 1.050
64 MJB 678+764 0.070 0.700
65 MJB 689+868 0.105 1.050
66 MJB 691+790 0.070 0.700
67 MJB 693+360 0.070 0.700
68 MJB 694+204 0.070 0.700
69 MJB 695+914 0.245 2.450
Total 10.618 106.180
*Note: The length of structures at Ramp Interchanges MP-04 at Km 586+420 and MP-07 at Km 674+720 has
been divided equally for road length before and after the interchange.
3. The net effective length for which fee shall be due and payable is as under:
Table - 6
Distance matrix for total tollable road length (Including equivalent length of structures >60 m length)
Sr.
No. From Starting
Point
Km
452+420 Fee
plaza at
Km
464+220 Fee
Plaza
Km
494+220 Fee
Plaza
Km
537+320 Fee
Plaza
Km
586+42 0 Fee
Plaza
Km
600+020 Fee
Plaza
Km
613+720 Fee
Plaza
Km
674+720 End
point
km
696+920
1 Starting
Point Km
452+420 0.000 15.130 47.848 104.700 167.489 184.419 198.119 305.892 340.062
2 Fee plaza
at Km
464+220 15.130 0.000 32.718 89.570 152.359 169.289 182.989 290.762 324.932
3 Fee Plaza
Km
494+220 47.848 32.718 0.000 56.852 119.641 136.571 150.271 258.044 292.214
4 Fee Plaza
Km
537+320 104.700 89.570 56.852 0.000 62.789 79.719 93.419 201.192 235.362
5 Fee Plaza
Km
586+420 167.489 152.359 119.641 62.78 9 0.000 16.930 30.630 138.403 172.573
6 Fee Plaza
Km
600+020 184.419 169.289 136.571 79.719 16.930 0.000 13.700 121.473 155.643
7 Fee Plaza
Km
613+720 198.119 182.989 150.271 93.419 30.630 13.700 0.000 107.773 141.943
8 Fee Plaza
Km
674+720 305.892 290.762 258.044 201.192 138.403 121.473 107.773 0.000 34.170
9 End point
km
696+920 340.062 324.932 292.214 235.362 172.573 155.643 141.943 34.170 0.000
4. The various types of traffic moments for which the user Fee will be charge on the basis of actual distances
travelled is as under:
Table7A: Traffic Plying on LHS from M.P/Rajasthan Border to M.P/Gujarat Border
Sl. No. KM Entry From Exist To
Preceding Fee Plaza at Km. 434+166 PKG -16 Rajasthan Interchange (both Entry & Exist)
11+800 Km 464+220 ( Interchange
Fee Plaza ) on (Bhanpura –
Jhalawar Road (SH - 31A))
Neemthur Village in Mandsaur
District Entry shall be
recorded at Fee Plaza at Km
464+220 Garoth - (Interchange MP-02) Km 494+220
Dalavda - (Interchange MP-03) Km 537+320
Bhuteda - (Interc hange MP-04) Km 586+420
Nayapura - (Interchange MP-05) Km 600+020
Dhamnod - (Interchange MP-06) Km 613+720
Timarvani - (Interchange MP-07) Km 674+720
41+800 Km 494+220
(Interchange Fee Plaza)
on(Suwasara – Bhanpura Road )
Garoth Village in Mandsaur
District Dalavda - (Interchange MP-03) Km 537+320
Bhuteda - (Interchange MP-04) Km 586+420
Nayapura - (Interchange MP-05) Km 600+020
Dhamnod - (Interchange MP-06) Km 613+720
Timarvani - (Interchange MP-07) Km 674+720
84+900 Km 537+320
(Interchange Fee Plaza) on(Dug
– Sitamau Road )
Dalavada Village in Mandsaur
District Bhuteda - (Interchange MP-04) Km 586+420
Nayapura - (Interchange MP-05) Km 600+020
Dhamnod - (Interchange MP-06) Km 613+720
Timarvani - (Interchange MP-07) Km 674+720
134+000 Km 586+420
(Interchange Fee Plaza) on
(Jaora – Ujjain Road )
Bhuteda Village in Ratlam
District Nayapura - (Interchange MP-05) Km 600+020
Dhamnod - (Interchange MP-06) Km 613+720
Timarvani - (Interchange MP-07) Km 674+720
147+600 Km 600+020
(Interchange Fee
Plaza) on(Mhow –
Neemuch Road )
Nayapura Village in Ratlam
District) Dhamnod - (Interchange MP-06) Km 613+720
Timarvani - (Interchange MP-07) Km 674+720
161+300 Km 613+720
(Interchange Fee Plaza) on
(Ratlam -Sailana Road )
Dhamnod Village in Ratlam
District)
Timarvani - (Interchange MP-07) Km 674+720
222+300 Km 674+720
(Interchange Fee
Plaza) on(Thandla -
Kushalgarh Road )
Timarwani Village in Jhabua
District)
Exist at PKg-25 end towards Gujarat.
Note: For traffic entry and exiting interchange MP -01 at Km 464+220, the fee shall be levied from starting of
stretch i.e Km 452+420.
Table 7B: Traffic Plying on RHS from M.P/Gujarat Border to M.P/Rajasthan Border
Sl.No. KM Entry From Exist To
1 222+300 Km 674+720
(Interchange Fee
Plaza) on(Thandla -
Kushalgarh Road )
Timarwani Village in Jhabua
District) Dhamnod - (Interchange MP-06) Km 613+720
Nayapura - (Interchange MP-05) Km 600+020
Bhuteda - (Interchange MP-04) Km 586+420
Dalavda - (Interchange MP-03) Km 537+320
Garoth - (Interchange MP-02) Km 494+220
Bhanpura - (Interchange MP-01) Km 464+220
2 161+300 Km 613+720 (Interchange
Fee Plaza) on (Ratlam -
Sailana Road )
Dhamnod Village in Ratlam
District) Nayapura - (Interchange MP-05) Km 600+020
Bhuteda - (Interchange MP-04) Km 586+420
Dalavda - (Interchange MP-03) Km 537+320
Garoth - (Interchange MP-02) Km 494+220
Bhanpura - (Interchange MP-01) Km 464+220
3 147+600 Km 600+020
(Interchange Fee Plaza) on(Mhow
– Neemuch Road ) Nayapura
Village in Ratlam District) Bhuteda - (Interchange MP-04) Km 586+420
Dalavda - (Interchange MP-03) Km 537+320
Garoth - (Interchange MP-02) Km 494+220
Bhanpura - (Interchange MP-01) Km 464+220
4 134+00 Km 586+420
(Interchange Fee Plaza) on (Jaora
– Ujjain Road )
Bhuteda Village in Ratlam
District Dalavda - (Interchange MP-03) Km 537+320
Garoth - (Interchange MP-02) Km 494+220
Bhanpura - (Interchange MP-01) Km 464+220
5 84+900 Km 537+320
(Interchange Fee Plaza) on(Dug –
Sitamau Road )
Dalavada Village in Mandsaur
District Garoth - (Interchange MP-02) Km 494+220
Bhanpura - (Interchange MP-01) Km 464+220
6 41+800 Km 494+220
(Interchange Fee Plaza)
on(Suwasar a – Bhanpura Road )
Garoth Village in Mandsaur
District Bhanpura - (Interchange MP-01) Km 464+220
7 11+800 Km 464+220 ( Interchange
Fee Plaza ) on (Bhanpura –
Jhalawar Road (SH-31A))
Neemthur Village in Mandsaur
District Exit at Pkg-17 start towards Rajast han.
Note: For traffic entry and exiting interchange MP -07 at Km 674+720, the fee shall be levied from starting of
stretch i.e Km 696+920.
5. The vehicle entering from any Interchange Fee Plaza will be recorded at the Entry Fee Plaza and User Fee will
be collected at Exit Interchange Fee Plaza for the road section used by the vehicle between Entry and Exit Fee
Plazas.
Succeeding Fee Plaza at Km.714+008 PKG -26 Gujarat Interchange (both Entry & Exist)
6. For multiple journeys on the highway section, passes shall be issued at the following rates, namely:
Amount Payable Maximum number of one- way
journeys allowed
Period of Validity
One and half times of the fee for one-way
journey* Two Twenty -four hours from the
time of payment
Two -third of amount of the fee payable for
fifty single journeys*
Fifty One month from date of
payment
* Provided that the user uses the same entry and exit fee plazas while performing the return journey.
7. The driver or owner or a person in charge of a mechanical vehicle which is loaded in excess of
permissible load specified for its category, shall be liable to pay fee for entering the overloaded vehicle on the
National Highway to the fee collecting agency, equal to the fee specified in sub -rule 1A of rule 10 of the said
rules, and shall not be entitled to make use of the highway section unless the excess load has been removed from
such mechanical vehicle.
8. All definitions including category of mechanical vehicles, its permissible load, category of exempted
vehicles, service road, alternative road etc. shall be as per definitions specified in the rules.
9. The fee rates shall be displayed for information of the users in accordance with rules 12 of the said rules.
10. Based on the Base rate of fee per km for the base year 2007 -08 as mentioned in Table -1 above, the
actual amount of fee to be charged from the mec hanical vehicles and the discounts will be calculated by the
Authority on the basis of the completed length of the section and revised annually in accordance with the rule 5
of the said rules and the same shall be published in at least one newspaper, each in English and vernacular
language accordingly.
11. The estimated capital cost of the project is Rs. 9631.23 Cr . The capital cost is subject to variation as the
activities of land acquisition, utility shifting, tree cutting etc. are yet to be completed. The final capital cost will be
notified separately. The Authority shall maintain a record of the recovery of capital cost through user fee realized
and after recovery of the capital cost, the fee livable shall be reduced to 40% of the rates and shall be revised
annually in accordance with the said rules.
[F. No. NHAI/13013/CO/22 -23/FeeNotification/Delhi -VadodaraExpressway(Pkg -17to25)/E -220515 ]
SUMAN PRASAD SINGH , Jt. Secy.
Uploaded by Dte. of Printing at Government of India Press, Ring R oad, Mayapuri, New Delhi -110064
and Published by the Controller of Publications, Delhi -110054.
Login to read full text