Gazette Tracker
Gazette Tracker

Core Purpose

Notification levying a toll fee on mechanical vehicles for use of an 8-lane section of the NE-4 Expressway in Madhya Pradesh, collectible by the National Highways Authority of India under a Closed User Fee Collection System.

Detailed Summary

Vide S.O. 3411(E) dated 27th July 2023, the Ministry of Road Transport and Highways recalls that under notification S.O. 515(E) dated 03.02.2021 issued under section 11 of the National Highways Authority of India Act, 1988 (68 of 1988), the Central Government had entrusted a stretch from near Sohna (Haryana) through Rajasthan and Madhya Pradesh to its junction with NH 48 near Dodka, Vadodara (Gujarat), to the National Highways Authority of India (the Authority); now, in exercise of powers under section 7 of the National Highways Act, 1956 (48 of 1956) read with Rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008, the Central Government levies a fee at 125% of the Base Year 2007-08 rates (Table 1, ranging from Rs. 0.65/km for cars to Rs. 4.20/km for oversized vehicles) on the 8-lane section from Km 452+420 to Km 696+920 (net road length 233.882 km plus equivalent structure length 106.180 km) of National Highway NE-4 in Madhya Pradesh, part of the Expressway notified vide S.O. No. 2142(E) dated 03.06.2021, and authorizes the Authority to collect the fee, itself or through a contractor, at seven interchange fee plazas (MP-01 to MP-07 at Km 464+220, 494+220, 537+320, 586+420, 600+020, 613+720 and 674+720) located in Mandsaur, Ratlam and Jhabua districts.

Full Text

4912 GI/202 3 (1) रजिस्ट्री सं. डी.एल.- 33004/99 REGD. No . D. L. -33004/99 EXTRAORDINARY PART II—Section 3—Sub-section ( ii) PUBLISHED BY AUTHORITY No. 3264] NEW DELHI , MON DAY, JULY 31, 2023/ SHRAVANA 9, 1945 CG-DL-E-02082023-247778 CG-DL-E-02082023-247778 (1) (2) 613+720 452+420 464+220 494+220 537+320 586+420 600+020 613+720 674+720 696+920 452+420 होते हुए 0.000 11.430 41.128 82.700 130.279 143.509 157.209 213.012 233.882 464+220 प्लाज़ा 11.430 0.000 29.698 71.270 118.849 132.079 145.779 201.582 222.452 494+220 प्लाज़ा 41.128 29.698 0.000 41.572 89.151 102.381 116.081 171.884 192.754 537+32 0 प्लाज़ा 82.700 71.270 41.572 0.000 47.579 60.809 74.509 130.312 151.182 586+420 प्लाज़ा 130.279 118.849 89.151 47.579 0.000 13.230 26.930 82.733 103.603 600+020 प्लाज़ा 143.509 132.079 102.381 60.809 13.230 0.000 13.700 69.503 90.373 613+720 प्लाज़ा 157.209 145.779 116.081 74.509 26.930 13.700 0.000 55.803 76.673 674+720 प्लाज़ा 213.012 201.582 171.884 130.312 82.733 69.503 55.803 0.000 20.870 696+920 छोर 233.882 222.452 192.754 151.182 103.603 90.373 76.673 20.870 0.000 (1) (2) (3) (4) (5) 613+720 452+42 464+22 494+22 537+32 586+42 600+02 613+72 674+72 696+92 452+42 होते हुए 0.000 3.700 6.720 22.000 37.210 40.910 40.910 92.880 106.180 464+22 प्लाज़ा 3.700 0.000 3.020 18.300 33.510 37.210 37.210 89.180 102.480 494+22 प्लाज़ा 6.720 3.020 0.000 15.280 30.490 34.190 34.190 86.160 99.460 537+32 प्लाज़ा 22.000 18.300 15.280 0.000 15.210 18.910 18.910 70.880 84.180 586+42 प्लाज़ा 37.210 33.510 30.490 15.210 0.000 3.700 3.700 55.670 68.970 600+02 प्लाज़ा 40.910 37.210 34.190 18.910 3.700 0.000 0.000 51.970 65.270 613+72 प्लाज़ा 40.910 37.210 34.190 18.910 3.700 0.000 0.000 51.970 65.270 674+72 प्लाज़ा 92.880 89.180 86.160 70.880 55.670 51.970 51.970 0.000 13.300 696+92 छोर 106.180 102.480 99.460 84.180 68.970 65.270 65.270 13.300 0.000 17 एमिेबी 454+091 0.080 0.800 2 एमिेबी 455+804 0.142 1.420 3 एमिेबी 458+029 0.079 0.790 4 एमिेबी 459+101 0.069 0.690 5 एमिेबी 467+862 0.082 0.820 6 एमिेबी 469+507 0.064 0.640 7 एमिेबी 473+055 0.061 0.610 18 एमिेबी 490+718 0.095 0.950 9 एमिेबी 497+39 0.084 0.840 10 एमिेबी 498+015 0.210 2.100 11 एमिेबी 499+502 0.140 1.400 12 एमिेबी 504+640 0.090 0.900 13 एमिेबी 507+100 0.070 0.700 14 एमिेबी 514+838 0.210 2.100 15 इंटरचेंि 494+411 0.128 1.280 19 एमिेबी 520+772 0.386 3.860 17 एमिेबी 526+828 0.210 2.100 18 एमिेबी 540+614 0.066 0.660 19 एमिेबी 545+035 0.210 2.100 20 एमिेबी 552+131 0.105 1.050 21 एमिेबी 558+913 0.420 4.200 22 एमिेबी 559+316 0.140 1.400 23 एमिेबी 559+885 0.070 0.700 24 एमिेबी 560+342 0.105 1.050 25 एमिेबी 561+815 0.210 2.100 26 एमिेबी 568+624 0.105 1.050 27 *इंटरचेंि 586+420 0.180 1.800 28 आरओबी 595+816 0.210 2.100 29 एमिेबी 599+110 0.070 0.700 30 एमिेबी 618+290 0.140 1.400 31 एमिेबी 620+200 0.455 4.550 32 एमिेबी 620+743 0.070 0.700 33 आरओबी 626+081 0.112 1.120 34 एमिेबी 626+618 0.315 3.150 23 एमिेबी 627+640 0.245 2.450 36 एमिेबी 628+285 0.070 0.700 37 एमिेबी 628+275 0.910 9.100 38 एमिेबी 634+835 0.140 1.400 39 एमिेबी 641+0 90 0.105 1.050 40 एमिेबी 644+730 0.560 5.600 41 एमिेबी 649+754 0.105 1.050 42 एमिेबी 650+445 0.105 1.050 43 एमिेबी 652+430 0.070 0.700 24 एमिेबी 656+397 0.105 1.050 45 एमिेबी 656+668 0.080 0.800 46 एमिेबी 657+683 0.070 0.700 47 एमिेबी 660+810 0.105 1.050 48 एमिेबी 663+295 0.245 2.450 49 एमिेबी 664+813 0.140 1.400 50 एमिेबी 665+175 0.105 1.050 51 एमिेबी 665+528 0.070 0.700 52 एमिेबी 666+614 0.245 2.450 53 एमिेबी 668+185 0.140 1.400 54 एमिेबी 668+516 0.070 0.700 55 एमिेबी 669+020 0.105 1.050 56 एमिेबी 671+790 0.140 1.400 57 एमिेबी 673+615 0.105 1.050 *इंटरचेंि 674+707 0.140 1.400 59 एमिेबी 675+549 0.245 2.450 25 एमिेबी 676+085 0.070 0.700 61 एमिेबी 676+ 690 0.105 1.050 62 एमिेबी 678+228 0.105 1.050 63 एमिेबी 678+411 0.105 1.050 64 एमिेबी 678+764 0.070 0.700 65 एमिेबी 689+868 0.105 1.050 66 एमिेबी 691+790 0.070 0.700 67 एमिेबी 693+360 0.070 0.700 68 एमिेबी 694+204 0.070 0.700 69 एमिेबी 695+ 914 0.245 2.450 कुल 10.618 106.180 452+42 464+22 494+22 537+32 586+42 600+02 613+72 674+72 696+92 452+42 होते हुए 0.000 15.130 47.848 104.700 167.489 184.419 198.119 305.892 340.062 464+22 प्लाज़ा 15.130 0.000 32.718 89.570 152.359 169.289 182.989 290.762 324.932 494+22 प्लाज़ा 47.848 32.718 0.000 56.852 119.641 136.571 150.271 258.044 292.214 537+32 प्लाज़ा 104.700 89.570 56.852 0.000 62.789 79.719 93.419 201.192 235.362 586+42 प्लाज़ा 167.489 152.359 119.641 62.789 0.000 16.930 30.630 138.403 172.573 600+02 प्लाज़ा 184.419 169.289 136.571 79.719 16.930 0.000 13.700 121.473 155.643 613+720 प्लाज़ा 198.119 182.989 150.271 93.419 30.630 13.700 0.000 107.773 141.943 674+72 प्लाज़ा 305.892 290.762 258.044 201.192 138.403 121.473 107.773 0.000 34.170 696+92 छोर 340.062 324.932 292.214 235.362 172.573 155.643 141.943 34.170 0.000 41+800 MINISTRY OF ROAD TRANSPORT AND HIGHWAYS NOTIFICATION New Delhi , the 27th July, 20 23 S.O. 3411(E).—Whereas by notification of the Government of India in the Ministry of Road Transport and Highways number S.O. 515 (E) dated 03 02.2021 issued under section 11 of the National Highways Authority of India Act, 1988 (68 of 1988), the Central Government has entrusted the stretch starting from its junction with new NH - 248A near Sohna connecting Firozpur Jhirka in the state of Haryana, Dausa, Lalsot, Sawai Madhopur, Kota, Jhalawar in the state of Rajasthan, Jaora, Ratlam in the state of Madhya Pr adesh, Dahod, Godra and terminating at its junction with NH 48 near Dodka (Vadodara) in the State of Gujarat to the National Highways Authority of India (hereinafter referred to as the “Authority”). Now, therefore, in exercise of the powers conferred by se ction 7 of the National Highways Act, 1956 (48 of 1956), read with Rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008 and amended from time to time (hereinafter referred to as the “Rules”), the Central Government, hereb y levies the fee on mechanical vehicles at 125% of the rate specified in Column (2) of the Table 1 (hereinafter referred to as “ base rate”) net road section length of 233.882 Km and for equivalent structure length (having length more than 60m) of 106.180 Km (having length of 10.618), for the use of 8 lane section on the Type of Vehicles specified in Column (1) of the Table 1 below for the use of section from Km 452+420 to Km 696+920 (length 244.500 Km) on National Highway No.NE -4 in the State of Madhya Pra desh, which is part of Expressway notified as NE -4 vide S.O. No. 2142 (E) dated 03.06.2021 and authorizes the Authority to collect, either through its officials or through a contractor, the said fee under “Closed User Fee Collection System”, namely: - Table 1 Type of vehicle Base rate of fee per Km for the Base Year 2007 -08 (in Rupees) (1) (2) Car, Jeep, Van or Light Motor Vehicle 0.65 Light Commercial Vehicle, Light Goods Vehicle or Mini Bus 1.05 Bus or Truck (Two Axles) 2.20 Three -axle commercial vehicles 2.40 Heavy Construction Machinery (HCM) or Earth Moving Equipment (EME) or Multi Axle Vehicle (MAV) (four to six axles) 3.45 Oversized Vehicles (seven or more axles) 4.20 1. The fee to be levied and collected hereunder shall be due and payable at the following Fee Plaza (s) for net road length specified between any two of such Fee Plazas: - Table -2 Sl. No. Location of Fee Plaza (chainage) Length (in Km) for which fee is payable (Excluding Structures > 60m length) Rate at which fee is payable (1) (2) (3) (4) 1. Km 464+220 (Interchange MP-01 Fee Plaza)on(Bhanpura – Jhalawar Road) Neemthur Village in Mandsaur District as per the distance matrix at Table No. 3 below 125% of the base rates mentioned in Table No. - 1 above. 2. Km 494+220 (Interchange MP-02Fee Plaza) on(Suwasara – Bhanpura Road) Garoth Village in Mandsaur District 3. Km 537+320 (Interchange MP-03 Fee Plaza) on (Dug – Sitamau Road ) Dalavada Village in Mandsaur District 4. Km 586+420 (Interchange MP-04 Fee Plaza) on (Jaora – Ujjain Road ) Bhuteda Village in Ratlam District 5. Km 600+020 (Interchange MP-05 Fee Plaza) on(Mhow – Neemuch Road ) Nayapura Village in Ratlam District 6. Km 613+720 (Interchange MP-06 Fee Plaza) on (Ratlam -Sailana Road ) Dhamnod Village in Ratlam District 7. Km 674+720 (Interchange MP-07 Fee Plaza) on (Thandla -Kushalgarh Road ) Timarwani Village in Jhabua District Table 3 Distance matrix for road length (Excluding length of structures >60 m) Sr.No. From Starting Point at Km 452+420 Fee plaza at Km 464+220 Fee Plaza Km 494+220 Fee Plaza Km 537+320 Fee Plaza Km 586+420 Fee Plaza Km 600+020 Fee Plaza Km 613+720 Fee Plaza Km 674+720 End point km 696+920 1 Starting Point at Km 452+420 0.000 11.430 41.128 82.700 130.279 143.509 157.209 213.012 233.882 2 Fee plaza at Km 464+220 11.430 0.000 29.698 71.270 118.849 132.079 145.779 201.582 222.452 3 Fee Plaza Km 494+220 41.128 29.698 0.000 41.572 89.151 102.381 116.081 171.884 192.754 4 Fee Plaza Km 537+320 82.700 71.270 41.572 0.000 47.579 60.809 74.509 130.312 151.182 5 Fee Plaza Km 586+420 130.279 118.849 89.151 47.579 0.000 13.230 26.930 82.733 103.603 6 Fee Plaza Km 600+020 143.509 132.079 102.381 60.809 13.230 0.000 13.700 69.503 90.373 7 Fee Plaza Km 613+720 157.20 9 145.779 116.081 74.509 26.930 13.700 0.000 55.803 76.673 8 Fee Plaza Km 674+720 213.012 201.582 171.884 130.312 82.733 69.503 55.803 0.000 20.870 9 End point km 696+920 233.882 222.452 192.754 151.182 103.603 90.373 76.673 20.870 0.000 2. In addition to above, the following fee shall also be due and payable for the use of the following structures having length more than 60 m at the following Fee plaza, by converting the length of structures into an equivalent length of highway by multiplying the length of such structures by an equalization factor of 10: Table -4 S. No. Location of Fee Plaza (chainage) Length (in Km) for which fee is payable Equivalent road length (in km) Rate at which fee is payable (1) (2) (3) (4) (5) 1. Km 464+220 ( Interchange M P-01 Fee Plaza) on (Bhanpura – Jhalawar Road) Neemthur Village in Mandsaur District As per the distance matrix for structures > 60 m length at Table 5 below 10 times of the distance as per col.3 125% of the base rates mentioned in Table No. - 1 above. 2. Km 494+220 (Interchange MP-02Fee Plaza) on (Suwasara – Bhanpura Road ) Garoth Village in Mandsaur District 3. Km 537+320 (Interchange MP-03Fee Plaza) on (Dug – Sitamau Road ) Dalavada Village in Mandsaur District 4. Km 586+420 (Interchange MP-04 Fee Plaza) on (Jaora – Ujjain Road ) Bhuteda Village in Ratlam District 5. Km 600+020 (Interchange MP-05 Fee Plaza) on(Mhow – Neemuch Road ) Nayapura Village in Ratlam District 6. Km 613+720 (Interchange MP-06 Fee Plaza) on(Ratlam -Sailana Road ) Dhamnod Village in Ratlam District 7. Km 674+720 (Interchange MP-07 Fee Plaza) on(Thandla -Kushalgarh Road) Timarwani Village in Jhabua District Table - 5 Distance matrix for road length of structures (> 60m length) betwee n Fee Plazas x 10 Sr.No. From Starting Point Km 452+420 Fee plaza at Km 464+220 Fee Plaza Km 494+220 Fee Plaza Km 537+320 Fee Plaza Km 586+4 20 Fee Plaza Km 600+02 0 Fee Plaza Km 613+720 Fee Plaza Km 674+72 0 End point km 696+920 1 Starting Point Km 452 +420 0.000 3.700 6.720 22.000 37.210 40.910 40.910 92.880 106.180 2 Fee plaza at Km 464+220 3.700 0.000 3.020 18.300 33.510 37.210 37.210 89.180 102.480 3 Fee Plaza Km 494+220 6.720 3.020 0.000 15.280 30.490 34.190 34.190 86.160 99.460 4 Fee Plaza Km 537+320 22.000 18.300 15.280 0.000 15.210 18.910 18.910 70.880 84.180 5 Fee Plaza Km 586+420 37.210 33.510 30.490 15.210 0.000 3.700 3.700 55.670 68.970 6 Fee Plaza Km 600+020 40.910 37.210 34.190 18.910 3.700 0.000 0.000 51.970 65.270 7 Fee Plaza Km 613+ 720 40.910 37.210 34.190 18.910 3.700 0.000 0.000 51.970 65.270 8 Fee Plaza Km 674+720 92.880 89.180 86.160 70.880 55.670 51.970 51.970 0.000 13.300 9 End point km 696+920 106.180 102.480 99.460 84.180 68.970 65.270 65.270 13.300 0.000 The details of structures having length more than 60m are as under: - Table 5A Sr.No. Package Type of Structure Design, Km Length of Structure (in Km) Equivalent Length (in Km) A B C D E F=E x 10 17 MJB 454+091 0.080 0.800 2 MJB 455+804 0.142 1.420 3 MJB 458+02 9 0.079 0.790 4 MJB 459+101 0.069 0.690 MP-01 Interchange Fee Plaza (Ch.464+220) 5 MJB 467+862 0.082 0.820 6 MJB 469+507 0.064 0.640 7 MJB 473+055 0.061 0.610 18 MJB 490+718 0.095 0.950 MP-02 Interchange Fee Plaza (Ch.494+220) 9 MJB 497+39 0.084 0.840 10 MJB 498+015 0.210 2.100 11 MJB 499+502 0.140 1.400 12 MJB 504+640 0.090 0.900 13 MJB 507+100 0.070 0.700 14 MJB 514+838 0.210 2.100 15 Interchange 494+411 0.128 1.280 19 MJB 520+772 0.386 3.860 17 MJB 526+828 0.210 2.100 MP-03 Interchange Fee Plaza (Ch.537+320) 18 MJB 540+614 0.066 0.660 19 MJB 545+035 0.210 2.100 20 MJB 552+131 0.105 1.050 21 MJB 558+913 0.420 4.200 22 MJB 559+316 0.140 1.400 23 MJB 559+885 0.070 0.700 24 MJB 560+342 0.105 1.050 25 MJB 561+815 0.210 2.100 26 MJB 568+624 0.105 1.050 21 *Interchange 586+420 0.180 1.800 MP-04 Interchange Fee Plaza (Ch.586+420) 28 ROB 595+816 0.210 2.100 29 MJB 599+110 0.070 0.700 MP-05 Interchange Fee Plaza (Ch.600+020) 22 MP-06 Interchange Fee Plaza (Ch.613+720) 30 MJB 618+290 0.140 1.400 31 MJB 620+200 0.455 4.550 32 MJB 620+743 0.070 0.700 33 ROB 626+081 0.112 1.120 34 MJB 626+618 0.315 3.150 23 MJB 627+640 0.245 2.450 36 MJB 628+285 0.070 0.700 37 MJB 628+275 0.910 9.100 38 MJB 634+835 0.140 1.400 39 MJB 641+090 0.105 1.050 40 MJB 644+730 0.560 5.600 41 MJB 649+754 0.105 1.050 42 MJB 650+445 0.105 1.050 43 MJB 652+430 0.070 0.700 24 MJB 656+397 0.105 1.050 45 MJB 656+668 0.080 0.800 46 MJB 657+683 0.070 0.700 47 MJB 660+810 0.105 1.050 48 MJB 663+295 0.245 2.450 49 MJB 664+813 0.140 1.400 50 MJB 665+175 0.105 1.050 51 MJB 665+528 0.070 0.700 52 MJB 666+614 0.245 2.450 53 MJB 668+185 0.140 1.400 54 MJB 668+516 0.070 0.700 55 MJB 669+020 0.105 1.050 56 MJB 671+790 0.140 1.400 57 MJB 673+615 0.105 1.050 58 *Interchange 674+707 0.140 1.400 25 MP-07 Interchange Fee Plaza (Ch.674+720) 59 MJB 675+549 0.245 2.450 60 MJB 676+085 0.070 0.700 61 MJB 676+690 0.105 1.050 62 MJB 678+228 0.105 1.050 63 MJB 678+411 0.105 1.050 64 MJB 678+764 0.070 0.700 65 MJB 689+868 0.105 1.050 66 MJB 691+790 0.070 0.700 67 MJB 693+360 0.070 0.700 68 MJB 694+204 0.070 0.700 69 MJB 695+914 0.245 2.450 Total 10.618 106.180 *Note: The length of structures at Ramp Interchanges MP-04 at Km 586+420 and MP-07 at Km 674+720 has been divided equally for road length before and after the interchange. 3. The net effective length for which fee shall be due and payable is as under: Table - 6 Distance matrix for total tollable road length (Including equivalent length of structures >60 m length) Sr. No. From Starting Point Km 452+420 Fee plaza at Km 464+220 Fee Plaza Km 494+220 Fee Plaza Km 537+320 Fee Plaza Km 586+42 0 Fee Plaza Km 600+020 Fee Plaza Km 613+720 Fee Plaza Km 674+720 End point km 696+920 1 Starting Point Km 452+420 0.000 15.130 47.848 104.700 167.489 184.419 198.119 305.892 340.062 2 Fee plaza at Km 464+220 15.130 0.000 32.718 89.570 152.359 169.289 182.989 290.762 324.932 3 Fee Plaza Km 494+220 47.848 32.718 0.000 56.852 119.641 136.571 150.271 258.044 292.214 4 Fee Plaza Km 537+320 104.700 89.570 56.852 0.000 62.789 79.719 93.419 201.192 235.362 5 Fee Plaza Km 586+420 167.489 152.359 119.641 62.78 9 0.000 16.930 30.630 138.403 172.573 6 Fee Plaza Km 600+020 184.419 169.289 136.571 79.719 16.930 0.000 13.700 121.473 155.643 7 Fee Plaza Km 613+720 198.119 182.989 150.271 93.419 30.630 13.700 0.000 107.773 141.943 8 Fee Plaza Km 674+720 305.892 290.762 258.044 201.192 138.403 121.473 107.773 0.000 34.170 9 End point km 696+920 340.062 324.932 292.214 235.362 172.573 155.643 141.943 34.170 0.000 4. The various types of traffic moments for which the user Fee will be charge on the basis of actual distances travelled is as under: Table7A: Traffic Plying on LHS from M.P/Rajasthan Border to M.P/Gujarat Border Sl. No. KM Entry From Exist To Preceding Fee Plaza at Km. 434+166 PKG -16 Rajasthan Interchange (both Entry & Exist) 11+800 Km 464+220 ( Interchange Fee Plaza ) on (Bhanpura – Jhalawar Road (SH - 31A)) Neemthur Village in Mandsaur District Entry shall be recorded at Fee Plaza at Km 464+220 Garoth - (Interchange MP-02) Km 494+220 Dalavda - (Interchange MP-03) Km 537+320 Bhuteda - (Interc hange MP-04) Km 586+420 Nayapura - (Interchange MP-05) Km 600+020 Dhamnod - (Interchange MP-06) Km 613+720 Timarvani - (Interchange MP-07) Km 674+720 41+800 Km 494+220 (Interchange Fee Plaza) on(Suwasara – Bhanpura Road ) Garoth Village in Mandsaur District Dalavda - (Interchange MP-03) Km 537+320 Bhuteda - (Interchange MP-04) Km 586+420 Nayapura - (Interchange MP-05) Km 600+020 Dhamnod - (Interchange MP-06) Km 613+720 Timarvani - (Interchange MP-07) Km 674+720 84+900 Km 537+320 (Interchange Fee Plaza) on(Dug – Sitamau Road ) Dalavada Village in Mandsaur District Bhuteda - (Interchange MP-04) Km 586+420 Nayapura - (Interchange MP-05) Km 600+020 Dhamnod - (Interchange MP-06) Km 613+720 Timarvani - (Interchange MP-07) Km 674+720 134+000 Km 586+420 (Interchange Fee Plaza) on (Jaora – Ujjain Road ) Bhuteda Village in Ratlam District Nayapura - (Interchange MP-05) Km 600+020 Dhamnod - (Interchange MP-06) Km 613+720 Timarvani - (Interchange MP-07) Km 674+720 147+600 Km 600+020 (Interchange Fee Plaza) on(Mhow – Neemuch Road ) Nayapura Village in Ratlam District) Dhamnod - (Interchange MP-06) Km 613+720 Timarvani - (Interchange MP-07) Km 674+720 161+300 Km 613+720 (Interchange Fee Plaza) on (Ratlam -Sailana Road ) Dhamnod Village in Ratlam District) Timarvani - (Interchange MP-07) Km 674+720 222+300 Km 674+720 (Interchange Fee Plaza) on(Thandla - Kushalgarh Road ) Timarwani Village in Jhabua District) Exist at PKg-25 end towards Gujarat. Note: For traffic entry and exiting interchange MP -01 at Km 464+220, the fee shall be levied from starting of stretch i.e Km 452+420. Table 7B: Traffic Plying on RHS from M.P/Gujarat Border to M.P/Rajasthan Border Sl.No. KM Entry From Exist To 1 222+300 Km 674+720 (Interchange Fee Plaza) on(Thandla - Kushalgarh Road ) Timarwani Village in Jhabua District) Dhamnod - (Interchange MP-06) Km 613+720 Nayapura - (Interchange MP-05) Km 600+020 Bhuteda - (Interchange MP-04) Km 586+420 Dalavda - (Interchange MP-03) Km 537+320 Garoth - (Interchange MP-02) Km 494+220 Bhanpura - (Interchange MP-01) Km 464+220 2 161+300 Km 613+720 (Interchange Fee Plaza) on (Ratlam - Sailana Road ) Dhamnod Village in Ratlam District) Nayapura - (Interchange MP-05) Km 600+020 Bhuteda - (Interchange MP-04) Km 586+420 Dalavda - (Interchange MP-03) Km 537+320 Garoth - (Interchange MP-02) Km 494+220 Bhanpura - (Interchange MP-01) Km 464+220 3 147+600 Km 600+020 (Interchange Fee Plaza) on(Mhow – Neemuch Road ) Nayapura Village in Ratlam District) Bhuteda - (Interchange MP-04) Km 586+420 Dalavda - (Interchange MP-03) Km 537+320 Garoth - (Interchange MP-02) Km 494+220 Bhanpura - (Interchange MP-01) Km 464+220 4 134+00 Km 586+420 (Interchange Fee Plaza) on (Jaora – Ujjain Road ) Bhuteda Village in Ratlam District Dalavda - (Interchange MP-03) Km 537+320 Garoth - (Interchange MP-02) Km 494+220 Bhanpura - (Interchange MP-01) Km 464+220 5 84+900 Km 537+320 (Interchange Fee Plaza) on(Dug – Sitamau Road ) Dalavada Village in Mandsaur District Garoth - (Interchange MP-02) Km 494+220 Bhanpura - (Interchange MP-01) Km 464+220 6 41+800 Km 494+220 (Interchange Fee Plaza) on(Suwasar a – Bhanpura Road ) Garoth Village in Mandsaur District Bhanpura - (Interchange MP-01) Km 464+220 7 11+800 Km 464+220 ( Interchange Fee Plaza ) on (Bhanpura – Jhalawar Road (SH-31A)) Neemthur Village in Mandsaur District Exit at Pkg-17 start towards Rajast han. Note: For traffic entry and exiting interchange MP -07 at Km 674+720, the fee shall be levied from starting of stretch i.e Km 696+920. 5. The vehicle entering from any Interchange Fee Plaza will be recorded at the Entry Fee Plaza and User Fee will be collected at Exit Interchange Fee Plaza for the road section used by the vehicle between Entry and Exit Fee Plazas. Succeeding Fee Plaza at Km.714+008 PKG -26 Gujarat Interchange (both Entry & Exist) 6. For multiple journeys on the highway section, passes shall be issued at the following rates, namely: Amount Payable Maximum number of one- way journeys allowed Period of Validity One and half times of the fee for one-way journey* Two Twenty -four hours from the time of payment Two -third of amount of the fee payable for fifty single journeys* Fifty One month from date of payment * Provided that the user uses the same entry and exit fee plazas while performing the return journey. 7. The driver or owner or a person in charge of a mechanical vehicle which is loaded in excess of permissible load specified for its category, shall be liable to pay fee for entering the overloaded vehicle on the National Highway to the fee collecting agency, equal to the fee specified in sub -rule 1A of rule 10 of the said rules, and shall not be entitled to make use of the highway section unless the excess load has been removed from such mechanical vehicle. 8. All definitions including category of mechanical vehicles, its permissible load, category of exempted vehicles, service road, alternative road etc. shall be as per definitions specified in the rules. 9. The fee rates shall be displayed for information of the users in accordance with rules 12 of the said rules. 10. Based on the Base rate of fee per km for the base year 2007 -08 as mentioned in Table -1 above, the actual amount of fee to be charged from the mec hanical vehicles and the discounts will be calculated by the Authority on the basis of the completed length of the section and revised annually in accordance with the rule 5 of the said rules and the same shall be published in at least one newspaper, each in English and vernacular language accordingly. 11. The estimated capital cost of the project is Rs. 9631.23 Cr . The capital cost is subject to variation as the activities of land acquisition, utility shifting, tree cutting etc. are yet to be completed. The final capital cost will be notified separately. The Authority shall maintain a record of the recovery of capital cost through user fee realized and after recovery of the capital cost, the fee livable shall be reduced to 40% of the rates and shall be revised annually in accordance with the said rules. [F. No. NHAI/13013/CO/22 -23/FeeNotification/Delhi -VadodaraExpressway(Pkg -17to25)/E -220515 ] SUMAN PRASAD SINGH , Jt. Secy. Uploaded by Dte. of Printing at Government of India Press, Ring R oad, Mayapuri, New Delhi -110064 and Published by the Controller of Publications, Delhi -110054.

Never miss important gazettes

Create a free account to save gazettes, add notes, and get email alerts for keywords you care about.

Sign Up Free