Gazette Tracker
Gazette Tracker

Core Purpose

Notification levying and revising user fee rates for the Udhampur-Ramban-Marog section of NH-1A (New NH-44) in Jammu and Kashmir under the National Highways Fee (Determination of Rates and Collection) Rules, 2008.

Detailed Summary

The Ministry of Road Transport and Highways, by S.O. 2979(E) dated 24 July 2024, referencing the earlier entrustment notification S.O. 1097(E) dated 4 August 2005 issued under Section 11 of the National Highways Authority of India Act, 1988 (68 of 1988), which entrusted the Jammu-Srinagar section (including Nagrota Bypass, Udhampur Bypass, and Srinagar Bypass) of erstwhile NH-1A (New NH-44) to the National Highways Authority of India, exercised powers under Section 7 of the National Highways Act, 1956 (48 of 1956) read with Rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008, and, in supersession of notification S.O. 1554(E) dated 31 March 2023, levied fees on mechanical vehicles for the Udhampur-Ramban-Marog section from Km. 67.000 to Km. 156.900, covering a net road length of 38.271 km, equivalent two-lane structure length of 89.790 km, equivalent four-lane structure length of 54.790 km, and bypass length of 2.834 km costing rupees ten crores or more; base-year (2007-08) rates per kilometre range from Rs. 0.65 for Car/Jeep/Van/Light Motor Vehicle up to Rs. 4.20 for Oversized Vehicles (seven or more axles), with fee plazas located at Design Km. 90.176 (near village Mada, Tehsil Chenani, Udhampur district) for Srinagar-bound traffic and Design Km. 99.800 (near village Nashri, Ramban district) for Jammu-bound traffic, and authorised the National Highways Authority of India to collect the fees directly or through a contractor.

Full Text

REGD. No. D. L.-33004/99 The Gazette of India C.G. DL-E-29072024-255847 CG-DL-E-29072024-255847 No. 2838] EXTRAORDINARY PART II—Section 3—Sub-section (ii) PUBLISHED BY AUTHORITY NEW DELHI, FRIDAY, JULY 26, 2024/SHRAVANA 4, 1946 MINISTRY OF ROAD TRANSPORT AND HIGHWAYS NOTIFICATION New Delhi, the 24th July, 2024 S.O. 2979(E).—Whereas by notification of the Government of India in the Ministry of Road Transport and Highways number S.O. 1097 (E) dated the 04th August 2005 issued under Section 11 of the National Highway Authority of India Act, 1988 (68 to 1988),the Central Government has entrusted the stretch from Kilometre 0.00 to Kilometre 9.20 (Jammu Bypass) and from Kilometre 9.20 to Kilometre 286.00 of Jammu Srinagar Section including Nagrota Bypass (length 14.40 km) and Udhampur Bypass (Length 18.70 km) and from Kilometre 286.00 to Kilometre 303.80 (Srinagar Bypass) of erstwhile National Highway No. 1A (New NH-44) in the state of Jammu and Kashmir to the National Highways Authority of India (hereinafter referred to as the "Authority"); Now, therefore, in exercise of the powers conferred by section 7 of the National Highways Act, 1956 (48 of 1956), read with rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008 (hereinafter referred to as the "rules") and in supersession of notification No. S.O. 1554 (E) dated 31st March, 2023, the Central Government hereby levies the fee on mechanical vehicles at the rate specified in column (2) of the Table 1 below for net road section length of 38.271 Kilometre and for equivalent structure length (having length more than 60m) of 54.790 Kilometre (having length of 5.479 km) and at one & half times of base rate for bypasses having length of 2.834 Kilometre costing rupees ten crores or more for use of four or more lane and at sixty per cent of the base rate for equivalent two lane structure length (having length more than 60 m) of 89.790 Kilometre (having length of 8.979 km) on the type of vehicles specified in column (1) of the Table 1 below of Udhampur-Ramban-Maroog section from Kilometre 67.000 to Kilometre 156.900 of National Highway number 1A (New NH-44) in the UT of Jammu & Kashmir and authorises the Authority to collect, either through its officials or through a contractor, the said fee, namely:- Table-1 +-------------------------------------------------------------+---------------------------------------------------------------+ | Type of vehicle | Base rate of fee per Kilometre for | | | the base year 2007-08 (in Rupees) | +=============================================================+===============================================================+ | (1) | (2) | +-------------------------------------------------------------+---------------------------------------------------------------+ | Car, Jeep, Van or Light Motor Vehicle | 0.65 | +-------------------------------------------------------------+---------------------------------------------------------------+ | Light Commercial Vehicle, Light Goods Vehicle or Mini Bus | 1.05 | +-------------------------------------------------------------+---------------------------------------------------------------+ | Bus or Truck (Two Axles) | 2.20 | +-------------------------------------------------------------+---------------------------------------------------------------+ | Three-axle commercial vehicles | 2.40 | +-------------------------------------------------------------+---------------------------------------------------------------+ | Heavy Construction Machinery (HCM) or Earth Moving | 3.45 | | Equipment (EME) or Multi Axle Vehicle (MAV) (four to six | | | axles) | | +-------------------------------------------------------------+---------------------------------------------------------------+ | Oversized Vehicles (seven or more axles) | 4.20 | +-------------------------------------------------------------+---------------------------------------------------------------+ 1. The fee to be levied and collected hereunder shall be due and payable for the use of four lane section at the following Fee Plaza(s) for net road length specified for such Fee Plaza(s): Table-2 +-------------------------------------------------------------------------------------------------+-------------------------------------------------+-----------------------------------+ | Location of Fee Plaza (chainage) | Length (in Kilometre) for | Rate at which fee is | | | which fee is payable | payable | +=================================================================================================+=================================================+===================================+ | *At Design Kilometre 90.176 of NH-1A (New NH-44) near village Mada, Tehsil Chenani in Udhampur | 38.271 | 100% for four or more | | district | | lane of the base rates | +-------------------------------------------------------------------------------------------------+-------------------------------------------------+-----------------------------------+ *At Design Kilometre 99.800 of NH-1A (New NH-44) near village Nashri in Ramban district of J&K. [Excluding length of structures mentioned in Table-1 (>60m) and bypass (costing > above Rs 10 crores)] 2. In addition to above, the following fee shall also be due and payable for the use of the following structures having length more than 60m at the following Fee Plaza(s), by converting the length of structures into an equivalent length of highway by multiplying the length of such structures by an equalisation factor of 10: Table-3 +-------------------------------------------------------------------------------------------------+-------------------------------------------------------------------------------------+-----------------------------------+------------------------------------------------------------------+ | Location of Fee Plaza (chainage) | Length of structures (in km) to be converted into equivalent road length | Equivalent road length (in km) | Rate at which fee is payable | +=================================================================================================+=====================================================================================+===================================+==================================================================+ | *At Design Kilometre 90.176 of NH-1A (New NH-44) near village Mada, Tehsil Chenani in Udhampur | 8.979^ | 89.790 | 60% for two lane with paved shoulders of the base rates | | district of J&K. | | | mentioned in Table-1 above | +-------------------------------------------------------------------------------------------------+-------------------------------------------------------------------------------------+-----------------------------------+------------------------------------------------------------------+ | *At Design Kilometre 99.800 of NH-1A (New NH-44) near village Nashri in Ramban district of J&K. | | | | +-------------------------------------------------------------------------------------------------+-------------------------------------------------------------------------------------+-----------------------------------+------------------------------------------------------------------+ | *At Design Kilometre 90.176 of NH-1A (New NH-44) near village Mada, Tehsil Chenani in Udhampur | 5.479^^ | 54.79 | 100% for four or more lane of the base rates mentioned in | | district of J&K. | | | Table-1 above | +-------------------------------------------------------------------------------------------------+-------------------------------------------------------------------------------------+-----------------------------------+------------------------------------------------------------------+ | *At Design Kilometre 99.800 of NH-1A (New NH-44) near village Nashri in Ramban district of J&K. | | | | +-------------------------------------------------------------------------------------------------+-------------------------------------------------------------------------------------+-----------------------------------+------------------------------------------------------------------+ *The applicable user fee at both the fee plazas shall be for the same length of the project, the user fee for Srinagar bound traffic shall be payable at Fee Plaza at Kilometre 90.176, whereas, for Jammu bound traffic, the fee shall be payable at Fee Plaza at Kilometre 99.800. ^Details of two-lane structure having length more than 60m is as under: +---------------------+-------------------------------+----------------+ | Type of structure | Chainage (Kilometre) | Length (Km) | | | From | To | | +=====================+=================+===============+================+ | Two lane Tunnel | 90.482 | 99.461 | 8.979 | +---------------------+-----------------+---------------+----------------+ | Total | | | 8.979 | +---------------------+-----------------+---------------+----------------+ ^^ Details of four-lane structure having length more than 60m is as under: +---------------------+---------------------+-------------------------+---------------------+-------------------------+ | Type of structure | Chainage North Bound| Length of North bound (in m) | Chainage South Bound| Length of South bound (in m) | | | From | to | | From | To | | +=====================+=========+===========+=========================+=========+===========+=========================+ | MJB-03,04 | 67.909 | 68.005 | 96.00 | 67.90275| 68.01525 | 112.50 | +---------------------+---------+-----------+-------------------------+---------+-----------+-------------------------+ | MNB-03 | 68.928 | 69.008 | 80.00 | | | | +---------------------+---------+-----------+-------------------------+---------+-----------+-------------------------+ | MJB-05 | - | - | - | 68.896 | 69.016 | 120.00 | +---------------------+---------+-----------+-------------------------+---------+-----------+-------------------------+ | MJB-09,10 | 69.1315 | 69.2605 | 129.00 | 69.132 | 69.288 | 156.00 | +---------------------+---------+-----------+-------------------------+---------+-----------+-------------------------+ | MNB 19 | | | | 77.560 | 77.634 | 74.00 | +---------------------+---------+-----------+-------------------------+---------+-----------+-------------------------+ | MNB 29 | | | | 83.666 | 83.736 | 70.00 | +---------------------+---------+-----------+-------------------------+---------+-----------+-------------------------+ | MNB 37 | | | | 130.294 | 130.367 | 73.50 | +---------------------+---------+-----------+-------------------------+---------+-----------+-------------------------+ | MNB 41 | | | | 132.480 | 132.547 | 67.24 | +---------------------+---------+-----------+-------------------------+---------+-----------+-------------------------+ | MNB 42 | 135.785 | 135.850 | 65.375 | | | | +---------------------+---------+-----------+-------------------------+---------+-----------+-------------------------+ | MJB-06, Jaiswal | 144.795 | 144.887 | 92.00 | 144.347 | 144.465 | 118.00 | +---------------------+---------+-----------+-------------------------+---------+-----------+-------------------------+ | MNB 51 | | | | 144.893 | 144.973 | 80.00 | +---------------------+---------+-----------+-------------------------+---------+-----------+-------------------------+ | MJB-07,08 (Ramban | 147.135 | 148.215 | 1080.00 | 149.135 | 150.215 | 1080.00 | | Bypass) | | | | | | | +---------------------+---------+-----------+-------------------------+---------+-----------+-------------------------+ | Tunnel-01, 02 | 136.746 | 137.671 | 925.00 | 136.506 | 137.300 | 794.00 | +---------------------+---------+-----------+-------------------------+---------+-----------+-------------------------+ | Viaduct-01 | 130.610 | 130.740 | 130.05 | 130.570 | 130.740 | 170.05 | +---------------------+---------+-----------+-------------------------+---------+-----------+-------------------------+ | Viaduct-02 | 131.258 | 131.658 | 400.05 | 131.238 | 131.678 | 440.05 | +---------------------+---------+-----------+-------------------------+---------+-----------+-------------------------+ | Viaduct-03 | 132.600 | 133.110 | 510.05 | 132.600 | 133.100 | 500.05 | +---------------------+---------+-----------+-------------------------+---------+-----------+-------------------------+ | Viaduct-04 | - | - | - | 133.650 | 133.720 | 70.05 | +---------------------+---------+-----------+-------------------------+---------+-----------+-------------------------+ | Tunnel/ Box structure| 145.885 | 146.592 | 707.00 | 147.880 | 148.680 | 800.00 | +---------------------+---------+-----------+-------------------------+---------+-----------+-------------------------+ | MJB-01 A & MJB-01 B | 149.181 | 149.290 | 109.00 | 149.181 | 149.290 | 109.00 | +---------------------+---------+-----------+-------------------------+---------+-----------+-------------------------+ | MNB 02 | | | | 153.172 | 153.253 | 81.00 | +---------------------+---------+-----------+-------------------------+---------+-----------+-------------------------+ | Viaduct 01 | 151.046 | 151.223 | 177.00 | | | | +---------------------+---------+-----------+-------------------------+---------+-----------+-------------------------+ | MJB-02 | 151.275 | 151.345 | 70.00 | | | | +---------------------+---------+-----------+-------------------------+---------+-----------+-------------------------+ | Viaduct-02 | | | | 154.850 | 155.100 | 250.00 | +---------------------+---------+-----------+-------------------------+---------+-----------+-------------------------+ | Tunnel 01 | | | | 152.842 | 153.165 | 323.00 | +---------------------+---------+-----------+-------------------------+---------+-----------+-------------------------+ | Tunnel 02 | | | | 153.793 | 154.027 | 234.00 | +---------------------+---------+-----------+-------------------------+---------+-----------+-------------------------+ | NT-01 | | | | 155.100 | 155.495 | 395.00 | +---------------------+---------+-----------+-------------------------+---------+-----------+-------------------------+ | Canopy | 152.309 | 152.430 | 121.00 | 154.020 | 154.170 | 150 | +---------------------+---------+-----------+-------------------------+---------+-----------+-------------------------+ | Total | | | 4691.525 | | | 6267.44 | +---------------------+---------+-----------+-------------------------+---------+-----------+-------------------------+ Avg length of structures | 5479.48 m 3. In addition to above, the following fee shall also be due and payable for the use of bypass costing Rs 10 crores or more at the following Fee Plaza (s) for net bypass length specified for such fee plaza (s): Table-4 +-------------------------------------------------------------------------------------------------+---------------------+-----------------+-----------------+-------------------------------------------------------------------------------------+-----------------------------------+ | Location of Fee Plaza (chainage) | Name of the bypass | Taking off | Merging at | Length and cost of bypass for which additional fee is payable | Rate at which fee is payable | | | | | | Length (in Kilometre) | Cost (Rs in crores) | | +=================================================================================================+=====================+=================+=================+=======================+=====================+===================================+ | *At Design Kilometre 90.176 of NH-1A (New NH-44) near village Mada, Tehsil Chenani in Udhampur | Chanderkot Bypass | 138.800 | 140.213 | 1.413 | 32.06 | 150% for four or more lane of the | | district of J&K. | | | | | | base rates mentioned in | | | | | | | | Table-1 above | +-------------------------------------------------------------------------------------------------+---------------------+-----------------+-----------------+-----------------------+---------------------+-----------------------------------+ | *At Design Kilometre 99.800 of NH-1A (New NH-44) near village Nashri in Ramban district of J&K. | | | | | | | +-------------------------------------------------------------------------------------------------+---------------------+-----------------+-----------------+-----------------------+---------------------+-----------------------------------+ | *At Design Kilometre 90.176 of NH-1A (New NH-44) near village Mada, Tehsil Chenani in Udhampur | Seri Bypass | 150.780 | 152.310 | 1.421 | 59.26 | 150% for four or more lane of the | | district of J&K. | | | | | | base rates | +-------------------------------------------------------------------------------------------------+---------------------+-----------------+-----------------+-----------------------+---------------------+-----------------------------------+ *At Design Kilometre 99.800 of NH-1A (New NH-44) near village Nashri in Ramban district of J&K. mentioned in Table-1 above 4. The rate of monthly pass for a person who owns a mechanical vehicle registered for non-commercial purposes and resides within a distance of twenty kilometers from the fee plaza is Rs 340 (three hundred forty rupees only) for the year 2024-25 and is subject to revision every year as per the provisions of the said rules. 5. For multiple journeys on the highway section, passes shall be issued at the following rates, namely: - Table-5 +---------------------------------------------------------+---------------------------------------------------+------------------------------------+ | Amount Payable | Maximum number of one-way journeys allowed | Period of validity | +=========================================================+===================================================+====================================+ | One and one-half times of the fee for one way journey | Two | Twenty-four hours from the time of | | | | payment | +---------------------------------------------------------+---------------------------------------------------+------------------------------------+ | Two-third of amount of the fee payable for fifty single | Fifty | One month from date of payment | | journeys | | | +---------------------------------------------------------+---------------------------------------------------+------------------------------------+ 6. Fee for commercial vehicle (excluding vehicles plying under National permit) registered in the district where the fee plaza falls shall be 50% of the specified rate for that category of vehicle provided no service road or alternative road is available for use of such commercial vehicles. 7. The driver or owner or a person in charge of a mechanical vehicle which is loaded in excess of permissible load specified for its category, shall be liable to pay fee for entering the overloaded vehicle on the National Highway to the fee collecting agency, equal to the fee specified in sub-rule 1A of rule 10 of the said rules, and shall not be entitled to make use of the highway section unless the excess load has been removed from such mechanical vehicle. 8. All definitions including category of mechanical vehicles, its permissible load, category of exempted vehicles, service road, alternative road, etc. shall be as per definitions specified in the said rules. 9. The fee rates shall be displayed for information of the users in accordance with rule 12 of the said rules. 10. Based on the base rate of fee per kilometer for the base year 2007-08 as mentioned in Table-1 above, the actual amount of fee to be charged from the mechanical vehicles and the discounts will be calculated by the Authority on the basis of the completed length of the section and revised annually in accordance with the rule 5 of the said rules and the same shall be published in at least one newspaper in English and vernacular language. 11. The estimated capital cost of the project is Rupees 7782 crore. The capital cost is subject to variation as the activities of land acquisition, utility shifting, tree cutting, etc. are yet to be completed. The Authority shall maintain a record of the recovery of capital cost through user fee realised. [F. No. NHAI/PIU-Ramban/11001/Udhampur-Ramban/Miscelleneous/E-218627] SUMAN PRASAD SINGH, Joint Secy. Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054. Digitally signed by GORAKHA NATH YADAVA Date: 2004.07.29 11:38:18 +0530

Never miss important gazettes

Create a free account to save gazettes, add notes, and get email alerts for keywords you care about.

Sign Up Free