Full Text
REGD. No. D. L.-33004/99
The Gazette of India
CG-DL-E-28032026-271380
EXTRAORDINARY
PART II-Section 3-Sub-section (ii)
PUBLISHED BY AUTHORITY
No. 1535]
NEW DELHI, WEDNESDAY, MARCH 25, 2026/ CHAITRA 4, 1948
2218 GI/2026
(1)
2
THE GAZETTE OF INDIA: EXTRAORDINARY
[PART II-SEC. 3(ii)]
TABLE-1
Type of vehicle | Base rate of fee per km for the base year 2007-08 (in Rupees)
(1) | (2)
Car, Jeep, Van or Light Motor Vehicle | 0.65
Light Commercial Vehicle, Light Goods Vehicle or Mini Bus | 1.05
Bus or Truck (Two Axles) | 2.20
Three-axle commercial vehicles | 2.40
Heavy Construction Machinery (HCM) or Earth Moving Equipment (EME) or Multi Axle Vehicle (MAV) (four to six axles) | 3.45
Oversized Vehicles (seven or more axles) | 4.20
1. The fee to be levied and collected hereunder shall be due and payable at the Fee Plaza for net road length specified for such Fee Plaza namely: -
TABLE-2
Location of Fee Plaza (chainage) | Length (in km) for which Fee is payable [Excluding length of Bypass (costing > 10 Cr.) and length of structures (>60m)] | Rate at which fee is payable
3
TABLE-3
Location of Fee Plaza (Chainage) | Name of the Bypass | Taking off | Merging at | Length and cost of Bypass for which additional fee is payable | Rate at which fee is payable
| | | | Length (in Km) [Excluding length of structures (>60m)] | Cost (in Crore)
2. In addition to above, the following fee shall also be due and payable for the use of the bypass costing Rs 10 crore or more at the following Fee Plaza for net bypass length specified for such Fee Plaza(s): -
4
THE GAZETTE OF INDIA: EXTRAORDINARY
[PART II-SEC. 3(ii)]
3. In addition to above, the following fee shall also be due and payable for the use of the following structures having length more than 60m at the following Fee Plaza(s), by converting the length of structures into an equivalent length of highway by multiplying the length of such structures by an equalisation factor of 10: -
TABLE-4
Location of Fee Plaza (Chainage) | Length of Structure (in km) to be converted into equivalent road length | Equivalent road length (in km) | Rate at which fee is payable
*The Details of structure having length more than 60m are as under: -
Structure having length more than 60m*
Sr. No. | Chainage | Type of Structure | Length# (km.)
From | To
**The Details of structure having length more than 60m are as under:
Sr. No. | Chainage | Type of Structure | Length# (km.)
From | To
5
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATION
New Delhi, the 25th March, 2026
S.O. 1600(E).—Whereas by notification of the Government of India in the Ministry of Road Transport and Highways number S.O. 452 (E) dated 16.03.2012, S.O. 3462 (E) dated 14.08.2024, S.O. 5671 (E) dated 08.12.2025 issued under section 11 of the National Highway Authority of India Act 1988 (68 of 1988), the Central Government has entrusted the following stretches respectively to the National Highways Authority of India (hereinafter referred to as the "Authority");
Entrustment notification | Section
S.O. 452 (E) dated 16.03.2012 | Rampur- Bilaspur- Uttar Pradesh/ uttarakhand Border (Rampur- Kathgodam Section) from km 0.000 to km 43.300
6
THE GAZETTE OF INDIA: EXTRAORDINARY
[PART II-SEC. 3(ii)]
S.O. 3462 (E) dated 14.08.2024 | Uttar Pradesh/ Uttarakhand Border- Rudrapur-Kathgodam Section in the State of uttarakhand from km 43.300 to km 91.000
S.O. 5671 (E) dated 08.12.2025 | The highway starting from its junction with NH-9 near Inderpur Village in the State of Uttar Pradesh (on Rudrapur Bypass connecting Inderpur village in the State of Uttar Pradesh, Koladiya Village, Kalyanpur Village near Parle Chowk in the State of Uttrakhand), Haldwani Nainital, Bhowali, Almora, Ranikhet, Dwarahat, Chaukhutiya, Gairsaing, Adbadri and terminating at its juction with NH-7 near Karnaprayag & Rudrapur (Bypass connecting Inderpur Village, Kartapur in the State of Uttar Pradesh, Bhamraula in the State of Uttrakhand)
Now, therefore, in exercise of the powers conferred by section 7 of the National Highways Act, 1956 (48 of 1956), read with rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008 (hereinafter referred to as the "said rules") and in supersession to the notifications of the Government of India in the Ministry of Road Transport and Highways numbers S.O. 3108 (E) dated 10.09.2020 & S.O. 4959 (E) dated 13.11.2024, the Central Government hereby levies the fee at the rate specified in column (2) of the Table 1 for net road section length of 48.579 Kilometer (Table-2) and for equivalent structure length (having length more than 60 meter) of 12.660 Kilometer (having length of 1.266 Kilometer, Table-4) and at 150% of the base rate for bypass having length of 39.591 Kilometer (Table-3) costing rupees ten crore or more, for use of four or more lane section and at 60% of the base rate specified in Column (2) of the Table-1 for net road section length of 3.525 Kilometer (Table-2) and at 90% of base rate for bypass having length of 3.65 Kilometer (Table-3) costing rupees ten crore or more, for two lane with paved shoulder section, on the type of vehicles specified in column (1) of the Table-1 below for use of Four Lane of Rampur-Rudrapur Section of NH-09 From Km. 449.050 to Km. 490.550 (Design Ch. 00.000 to Ch. 41.500) & from Km. 13.450 to Km. 55.876 (Design Ch. 50.800 to Ch. 93.226) along with Rudrapur Bypass from Design Km. 00.000 to Km. 20.640 in the state of Uttar Pradesh & Uttarakhand and authorises the Authority to collect, either through its officials or through a contractor, the said fee, as under:-
TABLE-1
Type of vehicle | Base rate of fee per km for the base year 2007-08 (in Rupees)
(1) | (2)
Car, Jeep, Van or Light Motor Vehicle | 0.65
Light Commercial Vehicle, Light Goods Vehicle or Mini Bus | 1.05
Bus or Truck (Two Axles) | 2.20
Three-axle commercial vehicles | 2.40
Heavy Construction Machinery (HCM) or Earth Moving Equipment (EME) or Multi Axle Vehicle (MAV) (four to six axles) | 3.45
Oversized Vehicles (seven or more axles) | 4.20
1. The fee to be levied and collected hereunder shall be due and payable at the Fee Plaza for net road length specified for such Fee Plaza namely: -
TABLE-2
Location of Fee Plaza (chainage) | Length (in km) for which Fee is payable (Excluding length of Bypass (costing > 10 Cr.) and length of structures (>60m)) | Rate at which fee is payable
At km. 460.320 of NH-09 (Design Ch. 11+270 of old NH-87) near Koyla village in Rampur district of Uttar Pradesh. | 25.479 | 100% for four or more lane of the base rates mentioned in Table-1 above
At km. 24.150 of NH-109 (design Ch. 61+500 of old NH-87) near Nagla village in Udham Singh Nagar District of Uttarakhand. | 23.100 | 100% for four or more lane, of the base rates mentioned in table-1 above
| 3.525 | 60% for two lanes with paved shoulder, of the base rates mentioned in table-1 above
2. In addition to above, the following fee shall also be due and payable for the use of the bypass costing Rs 10 crore or more at the following Fee Plaza for net bypass length specified for such Fee Plaza(s): -
7
TABLE-3
Location of Fee Plaza (Chainage) | Name of the Bypass | Taking off | Merging at | Length and cost of Bypass for which additional fee is payable | Rate at which fee is payable
| | | | Length (in Km) [Excluding length of structures (>60m)] | Cost (in Crore)
At km. 460.320 of NH-09 (Design Ch. 11+270 of old NH-87) near Koyla village in Rampur district of Uttar Pradesh. | Rampur Bypass | Km. 449.050 (Design Ch. 00+000) | Km. 457.650 (Design Ch. 8+600) | 8.413 | 133.204 | 150% for four or more lane of the base rates mentioned in Table-1 above
| Bilaspur Bypass | Km. 475.25 (Design Ch. 26+200) | Km. 482.55 (Design Ch. 33+500) | 7.218 | 116.707 |
| Rudrapur Bypass | Km. 490.550 (Design Ch. 00+000) | Km. 497.740 (Design Ch. 07+190) | 6.722 | 205.18 |
At km. 24.150 of NH-109 (design Ch. 61+500 of old NH-87) near Nagla village in Udham Singh Nagar District of Uttarakhand. | Haldwani Bypass of NH-87 (New NH-109) | Km. 42.574 (Design Ch. 80+024) | Km. 46.596 (Design Ch. 84+150) | 4.022 | 46.425 | 150% for four or more lane of the base rates mentioned in Table-1 above
| | Km. 46.596 (Design Ch. 84+150) | Km. 50.246 (Design Ch. 87+800) | 3.65 | 51.06 | 90% of the base rates mentioned in Table-1 above
| Rudrapur Bypass | Km. 00.000 (Design Ch. 07+190) | Km. 13.450 (Design Ch. 20+640) | 13.216 | 728.00 | 150% for four or more lane of the base rates mentioned in Table-1 above
3. In addition to above, the following fee shall also be due and payable for the use of the following structures having length more than 60m at the following Fee Plaza(s), by converting the length of structures into an equivalent length of highway by multiplying the length of such structures by an equalisation factor of 10: -
TABLE-4
Location of Fee Plaza (Chainage) | Length of Structure (in km) to be converted into equivalent road length | Equivalent road length (in km) | Rate at which fee is payable
At km. 460.320 of NH-09 (Design Ch. 11.270 of old NH-87) near Koyla village in Rampur district of Uttar Pradesh. | 0.928* | 9.280* | 100% for four or more lane of the base rates mentioned in Table-1 above
At km. 24.150 of NH-109 (design Ch. 61.500 of old NH-87) near Nagla village in Udham Singh Nagar District of Uttarakhand. | 0.338** | 3.380** | 100% for four or more lane of the base rates mentioned in Table-1 above
*The Details of structure having length more than 60m are as under: -
Structure having length more than 60m*
Sr. No. | Chainage | Type of Structure | Length# (km.)
From | To
1 | Km. 451.745 (Design Ch. 2.695) | Km. 451.830 (Design Ch. 2.780) | 4 Lane ROB | 0.085
2 | Km. 456.579 (Design Ch. 7.469) | Km. 456.521 (Design Ch. 7.571) | 4 Lane MJB | 0.102
3 | Km. 466.889 (Design Ch. 17.839) | Km. 467.01 (Design Ch. 17.960) | 4 Lane MJB | 0.121
8
THE GAZETTE OF INDIA: EXTRAORDINARY
[PART II-SEC. 3(ii)]
4 | Km. 478.959 (Design Ch. 29.909) | Km. 479.041 (Design Ch. 29.991) | 4 Lane MJB | 0.082
5 | Km. 490.550 (Design Ch. 7.110) | Km. 490.630 (Design Ch. 7.190) | 4 Lane VUP | 0.080
6 | Km. 490.630 (Design Ch. 6.800) | Km. 490.940 (Design Ch. 7.110) | 4 Lane Flyover | 0.310
7 | Km. 490.943 (Design Ch. 6.716) | Km. 491.021 (Design Ch. 6.794) | 4 Lane ROB | 0.078
8 | Km. 497.740 (Design Ch. 00.000) | Km. 497.740 (Design Ch. 00.000) | 4 Lane VOP | 0.070
**The Details of structure having length more than 60m are as under:
Sr. No. | Chainage | Type of Structure | Length# (km.)
From | To
1 | Km. 43.097 (Design Ch. 80.547) | Km. 43.201 (Design Ch. 80.651) | 4 Lane ROB | 0.104
2 | Km. 06.150 (Design Ch. 13.260) | Km. 06.230 (Design Ch. 13.340) | 4 Lane VUP | 0.080
3 | Km. 12.218 (Design Ch. 19.408) | Km. 12.302 (Design Ch. 19.492) | 4 Lane ROB | 0.084
4 | Km. 13.450 (Design Ch. 50.800) | Km. 13.450 (Design Ch. 50.870) | 4 Lane VOP | 0.070
#Average length of both sides has been considered.
4. The rate of monthly pass for a person who owns a mechanical vehicle registered for non-commercial purposes and resides within a distance of twenty kilometres from the fee plaza is Rs. 340/- (Rs. Three Hundred and Forty Only) for the year 2025-26 and is subject to revision every year as per the provisions of the said rules.
5. For multiple journeys on the highway section, passes shall be issued at the following rates, namely: -
TABLE-5
Amount Payable | Maximum number of one-way journeys allowed | Period of validity
One and half times of the fee for one way journey | Two | Twenty-four hours from the time of payment
Two-third of amount of the fee payable for fifty single journeys | Fifty | One month from date of payment
6. Fee for commercial vehicle (excluding vehicles plying under National permit) registered in the district where the fee plaza falls shall be 50% of the specified rate for that category of vehicle provided no service road or alternative road is available for use of such commercial vehicles.
7. The driver or owner or a person in charge of a mechanical vehicle which is loaded in excess of permissible load specified for its category, shall be liable to pay fee for entering the overloaded vehicle on the National Highway to the fee collecting agency, equal to the fee specified in sub-rule 1A of rule 10 of the said rules, and shall not be entitled to make use of the highway section unless the excess load has been removed from such mechanical vehicle.
8. All definitions including category of mechanical vehicles, its permissible load, category of exempted vehicles, service road, alternative road, etc. shall be as per definitions specified in the said rules.
9. The fee rates shall be displayed for information of the users in accordance with rule 12 of the said rules.
10. Based on the base rate of fee per kilometre for the base year 2007-08 as mentioned in Table-1 above, the actual amount of fee to be charged from the mechanical vehicles and the discounts will be calculated by the Authority on the basis of the completed length of the section and revised annually in accordance with the rule 5 of the said rules and the same shall be published in at least one newspaper in English and vernacular language.
11. The estimated capital cost of the project is Rupees 4223.62 crore. The capital cost is subject to variation as the activities of land acquisition, utility shifting, tree cutting, etc. are yet to be completed. The Authority shall maintain a record of the recovery of capital cost through user fee realised.
[F. No. UK DIV-12011/1/2025-PIU Rudrapur/ E-263431]
CHETNA NAND SINGH, Jt. Secy.
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054. SARVESH KUMAR SRIVASTAVA
Login to read full text