Full Text
5449 GI/202 3 (1) रजिस्ट्री सं. डी.एल.- 33004/99 REGD. No . D. L. -33004/99
EXTRAORDINARY
PART II —Section 3 —Sub-section ( ii)
PUBLISHED BY AUTHORITY
No. 3626] NEW DELHI, THURSDAY , AUGUST 24, 2023/ BHADRA 2, 1945
CG-DL-E-25082023-248353
(1) (2)
29+100 5.850 108.36
74+380 6.530 183
116+300 12.800 191.90
1.963
19.630
1 0.145 0.226 आरओबी 0.081
2 4.226 4.354 आरओ बी 0.128
1 25.925 26.075 बड़े पुल 0.150
1 56.655 56.805 बड़े पुल 0.150
2 71.510 71.810 बड़े पुल 0.300
1 130.735 130.873 आरओबी 0.138
2 137.165 138.640 फ्लाईओवर 1.475
3 149.957 150.307 फ्लाईओवर 0.350
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATION
New Delhi, the 2 3rd August, 2023
S.O. 3786(E).—Whereas by the notification of the Government of India in the Ministry of Road Transport
and Highways, number S.O. No. 1423(E) dated 05th May, 2017 a nd S.O. No. 1505(E) dated 14th May, 2020 issued
under section 11 of the National Highways Authori ty of India Act, 1988 (68 of 198 8), the Central Government has
entrusted the work of NH No. 209 [Pollachi to Coimbatore section (in the State of Tamil N adu) fr om Km . 123.550 to
Km. 150.400) a nd the work of New NH No. 83 (Old NH -209) [From existing chainage 390.400 of NH -7 (New NH -
44) near Kamalapuram -Lakkayankottai (Oddanchatram Bypass) - Virupatchi (Oddanchatram Bypass) -Vedapatti –
existing chainage 125.3 00 of N H-209 (New NH -83) near Achipatti – Anjinayar Kovil] respectively to the National
Highways Authority of India (hereinafter referred to as the “Authority”);
Now, therefore in exercise of the powers conferred by section 7 of the National Highways Act, 1956 (4 8 of
1956), read with rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008 and
subsequent amendments (hereinafter referred to as the “rules”), the Central Government hereby levies the fee on
mechanical vehicles at the rat e specified in column (2) of Ta ble 1 for net road section length of 39.114 Km. and for
equivalent structure length (having length more than 60m) of 35.640 Km . (having length of 3.564 Km .) and at one and
half times the base rate for bypasses having l ength o f 111.792 Km . costing rupees ten cr ore or more on the type of
vehicles specified in column (1) of Table 1 below of the Kamalapuram - Oddanchatram section from Design chainage
Km. 0.000 to Km . 35.300, Oddanchatram Bypass section from Design Chainage Km. 23.100 to Km . 29.100,
Oddanchatram - Madat hukulam section from Design Chainage Km . 29.000 to Km . 74.380, Madathukulam - Pollachi
section from Design chainage Km . 74.380 to Km . 116.950 and Pollachi - Coimbatore section from Design chainage
Km. 125.360 to Km . 150.580 of NH -209 (New NH -83) in the State o f Tamil Nadu and authorises the Authority to
collect, either through its officials or through a contractor, the said fee, namely: -
Table 1
Type of Vehicle Base rate of fee per km for the base
year 2007 -08 (in Rupees)
(1) (2)
Car, Jeep, Van or Light Motor Vehicle 0.65
Light Commercial Vehicle, Light Goods Vehicle or Mini Bus 1.05
Bus or Truck (Two axles) 2.20
Three -axle commercial vehicles 2.40
Heavy Construction Machinery (HCM) or Earth Moving Eq uipment
(EME) or Multi Axle Vehicle (MAV) (four to six axles) 3.45
Over Sized Vehicles (seven or more axles) 4.20
1. The fee to be levied and collected here under shall be due and payable at the Fee Plaza for net road length
specified for such Fee Plaza nam ely:
Table-2
Location of Toll Plaza (chainage) Length (in km .) for which Fee is
payable Rate at which fee is payable
At Km 12.000 of NH -209 (New NH -
83) near Paraipatti Village of Dindigul
District of Tamil Nadu. 3.697 km (Excluding length of Bypass
(costing >1 00% for four or more lane
or 10 Cr.) and length of Structures
(>60m)).
100% for four or more lane, of
the base r ates mentioned in Table -
1 above. At Km 40.500 of NH -209 (New NH -
83) near Chatrapatti Village of
Dindigul District of Tamil Nadu. 4.33 k m (Excl uding length of Bypass
(costing >100% for four or more lane
or 10 Cr.) and length of Structures
(>60m)).
At Km 97.200 of NH -209 (New NH -
83) near Gomangalam Puthur Village
in Coimbatore District of Tamil Nadu 31.087 km [excluding length of
Bypass ( costing > 10 Cr.) and length
of Structures (>60m)]
2. In addition to above, the following fee shall also be due and payable for the use of the bypass costing Rs. 10
crore or more at the following Fee Plaza for net bypass length specified for such Fee Plaza:
Table -3
Location of Fee
Plaza (chainage) Name of the
Bypass Taking Off Merging at Length and Cost of
bypass for which
additional fee is
payable Rate at which fee is
payable
Length (in
Km.) Cost (in
Rs.
Crore)
At Km 12.000 of NH -
209 (New NH -83)
near Parai patti
Village of Dindigul
District of Tamil
Nadu Dindigul Bypass Design Km
0+000 Design Km
30+903 30.602 609.51 150% for four or
more lane, of the
base rates (i.e. 1.5
times of 100% of the
base rates) mentioned
in Table -1 above Oddanchatram
bypass Design Km
23+100 Design Km
29+100 5.850 108.36
At Km 40.500 of NH -
209 (New NH -83) at
Chatrapatti Village of
Dindigul District in
Tamil Nadu Combined
Oddanchatram,
chatrapati, palani
bypass Design Km
29+000 Design Km
63+220 34.070 672.00 150% for four or
more l ane, of the
base rates (i.e. 1.5
times of 100% of the
base rates) mentioned
in Table -1 above Madathukulam
Bypass Design Km
67+550 Design Km
74+380 6.530 183
At Km 97.200 of NH -
209 (New NH -83)
near Gomangalam
Puthur Village in
Coimbatore District
of Tam il Nadu Udumalpet
Bypass Design Km
74+380 Design Km
96+320 21.940 293.20 150% for four or
more lane, of the
base rates (i.e. 1.5
times of 100% of the
base rates) mentioned
in Table -1 above Pollachi Bypass Design Km
103+500 Design Km
116+300 12.80 0 191.90
3. In additional to above, the following fee shall also be due and payable for the use of the following structures
having length more than 60m at the following Fee Plazas, by converting the length of structures into an equivalent
length of highway by mul tiplying the length of such structures by an equalisation factor of 10: -
Table -4
Location of Fee Plaza (Chainage) Length of structures* (in km .) to
be converted into equivalent
road length Equivalent road
length (in km .) Rate at which fee
is payabl e
At K m 12.000 of NH -209 (New NH -83)
near Paraipatti Village of Dindigul District
of Tamil Nadu 1.151 11.510
100% for four or
more lane, of the
base rates
mentioned in
Table -1 above At Km 40.500 of NH -209 (New NH -83)
near Chatrapatti Village of Dindigul
Distri ct of Tamil Nadu. 0.450 4.500
At Km 97.200 of NH -209 (New NH -83)
near Gomangalam Puthur Village in
Coimbatore District of Tamil Nadu
1.963
19.630
*Details of structure having length more than 60m is as under:
Sl.No Chainage
Type of Structure Length ( in km)
From Km . To Km .
Kamalapuram to Oddanchatram section
1 0.145 0.226 ROB 0.081
2 4.226 4.354 ROB 0.128
3 7.919 8.011 Flyover 0.092
4 33.148 33.848 Elevated Corridor 0.700
Oddanchatram Bypass section
1 25.925 26.075 Major Bridge 0.150
Sub-Total 1.151
Oddanchatram to Madathukulam section
1 56.655 56.805 Major Bridge 0.150
2 71.510 71.810 Major Bridge 0.300
Sub-Total 0.450
Pollachi – Coimbatore section
1 130.735 130.873 ROB 0.138
2 137.165 138.640 Flyover 1.475
3 149.957 150.30 7 Flyov er 0.350
Sub-Total 1.963
4. The rate of monthly pass for a person who owns a mechanical vehicle registered for non -commercial purpose
and resides within a distance of twenty kilometers from the fee plaza is Rs. 330/ - (Rupees Three Hundred and Thirty
only) f or the year 2023 -2024 and i s subject to revision every year as per the provisions of said rules.
5. For multiple journeys on the highway section, passes shall be issued at the following rates, namely: -
Table -5
Amount Payable Maximum number of one -way
journey s allowed Period of validity
One and one -half times of the fee for
one way journey Two Twenty four hours from the time of
payment
Two-third of amount of the fee
payable for fifty single journeys Fifty One month from the date of payment
6. Fee for co mmercia l vehicle (excluding vehicles plying under National permit) registered in the district where
the fee plaza falls shall be 50% of the specified rate for that category of vehicle provided no service road or alternative
road is available for use of suc h comme rcial vehi cles.
7. The driver or owner or a person in charge of a mechanical vehicle which is loaded in excess of permissible
load specified for its category, shall be liable to pay fee for entering the overloaded vehicle on the National Highway
to the fee co llecting agency, equal to the fee specified in sub -rule 1A of rule 10 of the said rules, and shall not be
entitled to make use of the highway section unless the excess load has been removed from such mechanical vehicle.
8. All definitions including cat egory o f mechanical vehicles, its permissible load, category of exempted
vehicles, service road, alternative road, etc., shall be as per definitions specified in the said rules.
9. The fee rates shall be displayed for information of the users in accordance wi th rule 12 of the said rules.
10. Based on the base rate of fee per kilometer for the base year 2007 -2008 as mentioned in Table 1 above, the
actual amount of fee to be charged from the mechanical vehicles and the discounts will be calculated by the Authority
on the b asis of the completed length of the section and revised annually in accordance with the Rule 5 of the said rules
and the same shall be published in at least one newspaper in English and vernacular language.
11. The estimated capital cost of the project is Rup ees 5439.76 Crores (Rs. 1090.99 Crores for Kamalapuram -
Oddanchatram section, Rs. 284.95 Crores for Oddanchatram bypass section, Rs. 1592.83 Crores for Oddanchatram -
Madathukulam section, Rs. 1516.13 Crores for Madathukulam -Pollachi section and Rs. 954 .87 Cr ores for Pollachi -
Coimbatore section). [The capital cost is subject to variation as the activities of land acquisition, utility shifting, tree
cutting etc., are yet to be completed and the final capital cost will be notified separately]. The Authorit y shal l maintain
a record of the recovery of capital cost through user fee realised and after recovery of the capital cost, the fee leviable
shall be reduced to 40% of the rates and shall be revised annually in accordance with the said rules.
[F. No. NHAI/P IU/DGL/11014/01/NH -209/TollNotification/2022/E -218339 ]
SUMAN PRASAD SINGH , Jt. Sec y.
Uploaded by Dte. of Printing at Government of India Press, Ring R oad, Mayapuri , New Delhi -110064
and Published by the Controller of Publications, Delhi -110054 .
Login to read full text