Full Text
REGD. No. D. L.-33004/99
The Gazette of India
CG-DL-E-19082026-275568
EXTRAORDINARY
PART II—Section 3—Sub-section (ii)
PUBLISHED BY AUTHORITY
No. 4392]
NEW DELHI, TUESDAY, AUGUST 18, 2026/SHRAVAN 27, 1948
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATION
New Delhi, the 18th August, 2026
S.O. 4572(E) .— Whereas by notification of the Government of India in the Ministry of Road Transport
and Highways number S.O. 196 (E), dated the 6th March, 2000, in the Ministry of Road Transport and Highways
number S.O. 1192 (E), dated the 3rd December, 2001 and in the erstwhile Ministry of Shipping, Road Transport and
Highways (Department of Road Transport and Highways), number S.O. 465 (E), dated the 26th April, 2002, issued
under section 11 of the National Highways Authority of the India Act, 1988 (68 of 1988), had entrusted the stretches
from Km 94.000 to Km 134.000 and Km 141.000 to Km 156.000 (Karnataka and Tamil Nadu Border to Salem
section), Km 134.000 to Km 141.000 (Krishnagiri – Salem – Madurai section). Km 156.000 to Km 163.400 and Km
163.400 to Km 207.600 (Bangalore – Salem – Madurai section) of National Highways Old No.7 (New NH-44) in the
state of Tamil Nadu to the National Highways Authority of India (hereinafter referred to as the Authority);
Now, therefore, in exercise of the powers conferred by section 7 of the National Highways Act, 1956 (48 of
1956), read with rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008
(hereinafter referred to as the "rules"), and in supersession of the notification of the Government of India in the
Ministry of Road Transport and Highways number S.O.622(E) dated 22.03.2010, the Central Government, hereby
levies the fee at the rate specified in column (2) of the Table 1 for net road section length of 63.40 Kms [Table 2] and
for equivalent structure length (having more than 60m) of 6.880 Km (having length of 0.688 Km [Table 4]) and at one
and half times the base rate for bypasses having length of 21.912 kms [Table 3] costing rupees 10 cr or more on the
type of vehicles specified in column (1) of the Table 1 below for the use of four lane of Krishnagiri to Thumbipadi
section from Km 94.000 to Km 180.00 of new National Highway no.44 in the State of Tamil Nadu and authorises the
Authority to collect toll fee either through its officials or through an agency, the said fee, namely:-
Table-1
+-------------------------------------------------------------+-------------------------------------------------+
| Type of Vehicle | Base rate of fee per km for the base |
| | year 2007-08 (in Rupees) |
+=============================================================+=================================================+
| (1) | (2) |
+-------------------------------------------------------------+-------------------------------------------------+
| Car, Jeep, Van or Light Motor Vehicle | 0.65 |
+-------------------------------------------------------------+-------------------------------------------------+
| Light Commercial Vehicle, Light Goods Vehicle or Mini Bus | 1.05 |
+-------------------------------------------------------------+-------------------------------------------------+
| Bus or Truck (Two axles) | 2.20 |
+-------------------------------------------------------------+-------------------------------------------------+
| Three-axle commercial vehicles | 2.40 |
+-------------------------------------------------------------+-------------------------------------------------+
| Heavy Construction Machinery (HCM) or Earth Moving Equipment| 3.45 |
| (EME) or Multi Axle Vehicle (MAV) (four to six axles) | |
+-------------------------------------------------------------+-------------------------------------------------+
| Over Sized Vehicles (seven or more axles) | 4.20 |
+-------------------------------------------------------------+-------------------------------------------------+
1. The fee to be levied and collected hereunder shall be due and payable at the Fee Plaza for net road length
specified for such Fee Plaza(s), namely:-
Table-2
+-------------------------------------------------------------+-------------------------------------------------+------------------------------------------+
| Location of Fee Plaza (chainage) | Length in km for which Fee is | Rate at which fee is payable |
| | payable | |
+=============================================================+=================================================+==========================================+
| At Km 154.440 of NH 44, Palayam | 63.40 kms | 100% for four or more lane, of |
| village in Dharmapuri District in the state | | the base rates mentioned in |
| of Tamil Nadu. | [Excluding length of bypasses | Table-1 above. |
| | (costing ≥Rs. 10 cr.) and structures | |
| | length(>60 m)] | |
+-------------------------------------------------------------+-------------------------------------------------+------------------------------------------+
2. In addition to above, the following fee shall be due and payable for the use of the bypass costing Rs 10 crore or
more at the following Fee Plaza for net bypass length specified for such Fee Plaza(s) :-
Table 3
+---------------------------------------------------------+------------------+-------------+-------------+----------------------------------------------------------------------------------------------------------------------------------+----------------------------------------------------------------------------------------------------------------------------------+
| Location of Fee | Name of the | Taking Off | Merging at | Length and Cost of | Rate at which |
| Plaza | Bypass | | | bypass for which | fee is payable |
| (Chainage) | | | | additional fee is payable | |
| | | | | (Excluding length of | |
| | | | | structure> 60m length) | |
| | | | | Length (In | Cost (In | |
| | | | | Km) | crore) | |
+=========================================================+==================+=============+=============+==============+==================================================================================================================================+==================================================================================================================================+
| At Km 154.440 | Kaveripatnam | 100+950 | 106+100 | 4.85 | > 10 Cr. | 150% for four |
| of NH 44, | Bypass | | | | | or more lane, |
| Palayam village | | | | | | of |
| in Dharmapuri | Periyampatti | 122+400 | 124+150 | 1.75 | > 10 Cr. | the |
| District in the | Bypass | | | | | base rates |
| state of Tamil | | | | | | mentioned in |
| Nadu | Dharmapuri | 133+100 | 148+650 | 15.312 | > 10 Cr. | Table-1 above |
| | Bypass |
+---------------------------------------------------------+------------------+-------------+-------------+--------------+----------------------------------------------------------------------------------------------------------------------------------+----------------------------------------------------------------------------------------------------------------------------------+
| | Total length | 21.912 | |
+---------------------------------------------------------+-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+
3. In addition to above, the following fee shall also be due and payable for the use of the following structures
having length more than 60m at the following Fee Plaza(s), by converting the length of structures into an equivalent
length of highway by multiplying the length of such structures by an equalization factor of 10: -
Table- 4
+-------------------------------------------------------------+-------------------------------------------------+------------------------------------------+------------------------------------------+
| Location of Fee Plaza | Length of structures (in | Equivalent | Rate at which fee is |
| (Chainage) | km) to be converted into | road length | payable |
| | equivalent road length | (in km) | |
+=============================================================+=================================================+==========================================+==========================================+
| Located at Km 154.440 of NH 44 at | 0.688 | 6.880 | 100% for four or more |
| Palayam Village of Dharmapuri | | | lane, of the base rate |
| District in the state of Tamil Nadu | | | mentioned in Table-labove |
+-------------------------------------------------------------+-------------------------------------------------+------------------------------------------+------------------------------------------+
^The details are as under: -
+--------+-----------------+-------------------+--------------------------+-----------------+
| Sl. No. | Chainage (Km) | Type of Structure | Length (in km) | |
+--------+-----------------+-------------------+--------------------------+-----------------+
| | From | To | (4 Lane) | |
+========+=================+===================+==========================+=================+
| 1 | 103.188 | 103.413 | Major Bridge | 0.225 |
+--------+-----------------+-------------------+--------------------------+-----------------+
| 2 | 121.723 | 121.798 | Major Bridge | 0.075 |
+--------+-----------------+-------------------+--------------------------+-----------------+
| 3 | 105.877 | 105.952 | Flyover | 0.075 |
+--------+-----------------+-------------------+--------------------------+-----------------+
| 4 | 116.871 | 116.946 | Flyover | 0.075 |
+--------+-----------------+-------------------+--------------------------+-----------------+
| 5 | 137.727 | 137.802 | Flyover | 0.075 |
+--------+-----------------+-------------------+--------------------------+-----------------+
| 6 | 142.097 | 142.172 | Flyover | 0.075 |
+--------+-----------------+-------------------+--------------------------+-----------------+
| 7 | 136.495 | 136.583 | ROB | 0.088 |
+--------+-----------------+-------------------+--------------------------+-----------------+
| | Total | | | 0.688 |
+--------+-----------------+-------------------+--------------------------+-----------------+
4. The rate of monthly pass for a person who owns a mechanical vehicle registered for non-commercial
purposes and resides within a distance of twenty kilometers from the toll plaza is Rs.360./- (Rupees Three Hundred
and Sixty Only) for the FY 2026-27 which is subject to revision every year as per the provisions of the said rules.
5. For multiple journey on the highway section, passes shall be issued at the following rates namely:
Table 5
+-------------------------------------------------------------+-------------------------------------------------+------------------------------------------+
| Amount Payable | Maximum number of one way | Period of validity |
| | journeys allowed | |
+=============================================================+=================================================+==========================================+
| One and half times of the fee | Two | Twenty four hours from the time of |
| for one way journey | | payment |
+-------------------------------------------------------------+-------------------------------------------------+------------------------------------------+
| Two-third of amount of the fee | Fifty | One month from date of payment |
| payable for fifty single journeys | | |
+-------------------------------------------------------------+-------------------------------------------------+------------------------------------------+
6. Fee for commercial vehicle (excluding vehicles plying under National permit) registered in the district where
the fee plaza shall be 50% of the specified rate for that category of vehicle provided no service road or alternate road
is available for use of such commercial vehicles.
7. The driver or owner or a person in charge of a mechanical vehicle which is loaded in excess of permissible
load specified for its category, shall be liable to pay fee for entering the over loaded vehicle on the National Highway
to the fee collecting agency, equal to the fee specified in rule 10 of the said rules.
8. All definitions including category of mechanical vehicles, its permissible load, category of exempted
vehicles, service road, alternative road etc. shall be as per definitions specified in the said rules.
9. The fee rates shall be displayed for information of the users in accordance with rules 12 of the said Rules.
10. Based on the Base rate of fee per km for the base year 2007-08 as mentioned in Table-1 above, the actual
amount of fee to be charged from the mechanical vehicles and the discounts will be calculated by the Authority on the
basis of the completed length of the section and revised annually in accordance with the rule 5 of the said rules and the
same shall be published in at least one newspapers in English and vernacular language.
11. The estimated capital cost of the project length is Rupees 353.28 Crores. The Authority shall maintain a
record of the recovery of capital cost through user fee realised.
[F. No. PROJ-16017(37)/7/2026-PIU Salem/ E-269846]
CHETNA NAND SINGH, Jt. Secy.
Login to read full text