Full Text
REGD. No. D. L.-33004/99
The Gazette of India
CG-DL-E-16072025-264700
EXTRAORDINARY
PART II—Section 3—Sub-section (ii)
PUBLISHED BY AUTHORITY
No.3138] NEW DELHI, MONDAY, JULY 14, 2025/ASHADHA 23, 1947
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATION
New Delhi, the 14th July, 2025
S.O. 3208(E).—Whereas by Gazette notification of the Government of India in the Ministry of Road
Transport and Highways number F. No S.O. 6018(E) dated 22nd December 2022,issued under Section 11 of the
National Highways Authority of India Act, 1988 (68 of 1988), the Central Government has entrusted the National
highway-344G starting from its junction with NH-344 (Saharanpur Bypass) near Latifpur Village connecting
Deobandh, Maniharan, Rampur, Bunat, Thana Bhawan, Budhana, Baraut, Tatiri, and terminating at its Junction with
NE 2 near Khekra in the State of Uttar Pradesh to National Highways Authority of India, (hereinafter referred to as the
"Authority");
Now, therefore, in exercise of the powers conferred by section 7 of the National Highways Act, 1956 (48 of
1956), read with Rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008 and
amended from time to time (hereinafter referred to as the "Rules"), the Central Government, hereby levies the fee on
mechanical vehicles at 100% of the rate specified in Column (2) of the Table 1 below for net road length 118.967 Kms
[Table-3] and equivalent structure length (having length more than 60m) of 7.33 Kms (having length of 0.733 Kms,
Table-5) on the Type of Vehicles specified in Column (1) of the Table 1 below for the use of section from Design Km.
0+000 (Starting at Design Km. 31+650 of Delhi-Dehradun Economic Corrridor (Phase-I), near Vill-Mavikala) to
Design Km. 119+700 (Merging at Saharanpur Bypass near Vill-Latifpur) (length 119.700 Kms) on National Highway
No. NH-344G in the State of Uttar Pradesh, and authorizes the Authority to collect, either through its officials or
through a contractor, the said fee, namely:-
Table-1
+-----------------------------------+-----------------------------------+
| Type of Vehicle | Base rate of fee per km for the base|
| | year 2007-08 (in Rupees) |
+===================================+===================================+
| (1) | (2) |
+-----------------------------------+-----------------------------------+
| Car, Jeep, Van or Light Motor Vehicle | 0.65 |
+-----------------------------------+-----------------------------------+
| Light Commercial Vehicle, Light Goods Vehicle or Mini Bus | 1.05 |
+-----------------------------------+-----------------------------------+
| Bus or Truck (Two axles) | 2.20 |
+-----------------------------------+-----------------------------------+
| Three-axle commercial vehicles | 2.40 |
+-----------------------------------+-----------------------------------+
| Heavy Construction Machinery (HCM) or Earth Moving Equipment (EME) | 3.45 |
| or Multi Axle Vehicle (MAV) (four to six axles) | |
+-----------------------------------+-----------------------------------+
| Over Sized Vehicles (seven or more axles) | 4.20 |
+-----------------------------------+-----------------------------------+
1. The fee to be levied and collected hereunder shall be due and payable at the Fee Plaza for net road length
specified for such Fee Plaza(s) namely:-
Table -2
+-----+-----------------------------------+-----------------------------------+-----------------------------------+
| S. | Location of Fee Plaza (chainage) | Length (in Km) | Rate at which fee is |
| No. | | for which fee is | payable |
| | | payable | |
| | | (Excluding | |
| | | Structures > 60m | |
| | | length) | |
+=====+===================================+===================================+===================================+
| -1 | -2 | -3 | -4 |
+-----+-----------------------------------+-----------------------------------+-----------------------------------+
| 1 | Design Km 3+520 | As per the distance | 100% of the base rates |
| | Katha Toll Plaza (Main TP) at Km 3+520, Vill-Katha, District- | matrix at Table No. | mentioned in Table No. - |
| | Baghpat | 3 below | 1 above. |
| | (Entry at Design Km. 0+000 from Delhi-Dehradun-Economic | | |
| | Corridor Phase-I/ Eastern Perepheral Expressway at | | |
| | Baghpat Interchange) | | |
+-----+-----------------------------------+-----------------------------------+-----------------------------------+
| 2 | Design Km. 8+043 | | |
| | Tatiri Interchange (Connecting Baghpat- Meerut section of NH- | | |
| | 334B) (Vill-Tatiri,Tehsil-Baghpat, District-Baghpat) | | |
+-----+-----------------------------------+-----------------------------------+-----------------------------------+
| 3 | Design Km. 27+975 | | |
| | Jalalpur Interchange (Connecting Baraut-Muzaffarnagar section of | | |
| | MDR 135W) (Village -Jalalpur, Tehsil - Baraut, District - | | |
| | Baghpat) | | |
+-----+-----------------------------------+-----------------------------------+-----------------------------------+
| 4 | Design Km. 56+054 | | |
| | Karaunda Interchange (Connecting Meerut-Karnal section of NH- | | |
| | 709A) (Village- Karaunda, Tehsil -Budhana, District - | | |
| | Muzaffarnagar) | | |
+-----+-----------------------------------+-----------------------------------+-----------------------------------+
| 5 | Design Km 69+300 | | |
| | Banati Kheda Interchange at Km 69+300 (Connecting Shamli- | | |
| | Muzaffarnagar Section of NH 709AD (Village - Banti Khera, | | |
| | Tehsil - Shamli, District - Shamli) | | |
+-----+-----------------------------------+-----------------------------------+-----------------------------------+
| 6 | Design Km. 78+300 | | |
| | Bhaisani Islampur Interchange (Connecting Ambala-Shamli NH | | |
| | 344-GM) (Village – Bhaisani Islampur, Tehsil - Shamli, District - | | |
| | Shamli) | | |
+-----+-----------------------------------+-----------------------------------+-----------------------------------+
| 7 | Design Km. 82+870 | | |
| | Khyawadi Interchange (Connecting Thanabhawan-Muzaffarnagar | | |
| | Road-MDR 10W) (Village - Khyawadi, Tehsil - Shamli, District- | | |
| | Shamli) | | |
+-----+-----------------------------------+-----------------------------------+-----------------------------------+
| 8 | Design Km. 97+800 | | |
| | Badgaon Interchange (Connecting Nanauta- Deoband Road-MDR | | |
| | 2W) (Village - Badgaon, Tehsil – Rampur Maniharan, District- | | |
| | Saharanpur) | | |
+-----+-----------------------------------+-----------------------------------+-----------------------------------+
| 9 | Design Km. 108+500 | | |
| | Halgoya Interchange (Connecting Haridwar Spur of NH-344-BG) | | |
| | (Village - Halgoya, Tehsil - Rampur Maniharan, District- | | |
| | Saharanpur) | | |
+-----+-----------------------------------+-----------------------------------+-----------------------------------+
| 10 | Design Km. 115+900 | | |
| | Rasoolpur Toll Plaza (Main TP) (Village – Rasoolpur Kheri Aht, | | |
| | Tehsil - Deoband, District - Saharanpur) | | |
| | (Exit at Design Km. 119+700 from Delhi- Dehradun Economic | | |
| | Corridor Phase-II towards Saharanpur Bypass/ Delhi- Dehradun | | |
| | Economic Corridor Phase-III) | | |
+-----+-----------------------------------+-----------------------------------+-----------------------------------+
Table 3
Distance matrix for net road length (Excluding length of structures >60 m length)
+----------+-----+-------+--------+--------+--------+--------+--------+--------+--------+---------+
| To | Km | 0 | 8.043 | 27.975 | 56.054 | 69.3 | 78.3 | 82.87 | 97.8 | 108.5 |
| Starting | 0 | | | | | | | | | |
| Point at | | | | | | | | | | |
| Design | | | | | | | | | | |
| Km 0+000 | From| | | | | | | | | |
| (Fee | | | | | | | | | | |
| Plaza at | | | | | | | | | | |
| Design | | | | | | | | | | |
| Km. 3+520)| | | | | | | | | | |
+----------+-----+-------+--------+--------+--------+--------+--------+--------+--------+---------+
| From | Km | 0 | 8.043 | 27.975 | 56.054 | 69.3 | 78.3 | 82.87 | 97.8 | 108.5 |
| Starting | 0 | | | | | | | | | |
| Point at | | 0 | 7.76 | 27.566 | 55.561 | 68.807 | 77.807 | 82.317 | 97.187 | 107.887 |
| Design | | | | | | | | | | |
| Km 0+000 | | | | | | | | | | |
| (Fee | | | | | | | | | | |
| plaza at | | | | | | | | | | |
| Design | | | | | | | | | | |
| Km 3+520) | | | | | | | | | | |
+----------+-----+-------+--------+--------+--------+--------+--------+--------+--------+---------+
| Fee Plaza| 8.043| 7.76 | 0 | 19.806 | 47.801 | 61.047 | 70.047 | 74.557 | 89.427 | 100.127 |
| at Design| | | | | | | | | | |
| Km 8+043 | | | | | | | | | | |
+----------+-----+-------+--------+--------+--------+--------+--------+--------+--------+---------+
| Fee Plaza| 27.97| 27.566| 19.806 | 0 | 27.995 | 41.241 | 50.241 | 54.751 | 69.62 | 80.321 |
| at Design| 5 | | | | | | | | | |
| Km 27+975| | | | | | | | | | |
+----------+-----+-------+--------+--------+--------+--------+--------+--------+--------+---------+
| Fee Plaza| 56.05| 55.561| 47.801 | 27.995 | 0 | 13.246 | 22.246 | 26.756 | 41.62 | 52.326 |
| at Design| 4 | | | | | | | | | |
| Km 56+054| | | | | | | | | | |
+----------+-----+-------+--------+--------+--------+--------+--------+--------+--------+---------+
| Fee Plaza| 69.3 | 68.807| 61.047 | 41.241 | 13.246 | 0 | 9 | 13.51 | 28.38 | 39.08 |
| at Design| | | | | | | | | | |
| Km 69+300| | | | | | | | | | |
+----------+-----+-------+--------+--------+--------+--------+--------+--------+--------+---------+
| Fee Plaza| 78.3 | 77.807| 70.047 | 50.241 | 22.246 | 26.816 | 0 | 4.51 | 19.38 | 30.08 |
| at Design| | | | | | | | | | |
| Km 78+300| | | | | | | | | | |
+----------+-----+-------+--------+--------+--------+--------+--------+--------+--------+---------+
| Fee Plaza| 82.87| 82.317| 74.557 | 54.751 | 26.756 | 13.51 | 4.51 | 0 | 14.87 | 25.57 |
| at Design| | | | | | | | | | |
| Km. 82+87| | | | | | | | | | |
| 0 | | | | | | | | | | |
+----------+-----+-------+--------+--------+--------+--------+--------+--------+--------+---------+
| Fee Plaza| 97.8 | 97.187| 89.427 | 69.621 | 41.626 | 28.38 | 19.38 | 14.87 | 0 | 10.7 |
| at Design| | | | | | | | | | |
| Km 97+800| | | | | | | | | | |
+----------+-----+-------+--------+--------+--------+--------+--------+--------+--------+---------+
| Fee Plaza| 108.5| 107.887| 100.127| 80.321 | 52.326 | 39.08 | 30.08 | 25.57 | 10.52 | 0 |
| at Design| | | | | | | | | | |
| Km. | | | | | | | | | | |
| 108+500 | | | | | | | | | | |
+----------+-----+-------+--------+--------+--------+--------+--------+--------+--------+---------+
| Fee Plaza| 119.7| 118.967| 111.207| 91.401 | 63.406 | 50.16 | 41.16 | 36.65 | 21.78 | 11.08 |
| at Design| | | | | | | | | | |
| Km. | | | | | | | | | | |
| 115+900 | | | | | | | | | | |
+----------+-----+-------+--------+--------+--------+--------+--------+--------+--------+---------+
| End Point| | | | | | | | | | |
| at | | | | | | | | | | |
| Design K | | | | | | | | | | |
| m. | | | | | | | | | | |
| 119+700 | | | | | | | | | | |
+----------+-----+-------+--------+--------+--------+--------+--------+--------+--------+---------+
3. In addition to above, the following structures having length more than 60 m at the following toll plaza, by
converting the length of structures into an equivalent length of highway by multiplying the length of such structures
by an equalization factor of 10:
Table -4
+-----+-----------------------------------+-----------------------------------+-----------------------------------+-----------------------------------+
| S. | Location of Fee Plaza (chainage) | Length (in Design | Equivalent road | Rate at which fee |
| No. | | Km.) for which fee | length (in Design | is payable |
| | | is payable | Km.) | |
+=====+===================================+===================================+===================================+===================================+
| -1 | -2 | -3 | -4 | -5 |
+-----+-----------------------------------+-----------------------------------+-----------------------------------+-----------------------------------+
| 1 | Design Km 3+520 | As per the distance | 10 times of the | 100% of the base |
| | Katha Toll Plaza (Main TP) at Km 3+520, Vill-Katha, District- | matrix for structures | distance as per | rates mentioned in |
| | Baghpat | > 60 m length at | col.3 | Table No. - 1 |
| | (Entry at Design Km. 0+000 from Delhi-Dehradun-Economic | Table 5 below | | above. |
| | Corridor Phase-I/ Eastern Perepheral Expressway at | | | |
| | Baghpat Interchange) | | | |
+-----+-----------------------------------+-----------------------------------+-----------------------------------+-----------------------------------+
| 2 | Design Km. 8+043 | | | |
| | Tatiri Interchange (Connecting Baghpat- Meerut section of NH- | | | |
| | 334B) (Vill-Tatiri,Tehsil-Baghpat, District-Baghpat) | | | |
+-----+-----------------------------------+-----------------------------------+-----------------------------------+-----------------------------------+
| 3 | Design Km. 27+975 | | | |
| | Jalalpur Interchange (Connecting Baraut-Muzaffarnagar section of | | | |
| | MDR 135W) (Village -Jalalpur, Tehsil - Baraut, District - | | | |
| | Baghpat) | | | |
+-----+-----------------------------------+-----------------------------------+-----------------------------------+-----------------------------------+
| 4 | Design Km. 56+054 | | | |
| | Karaunda Interchange (Connecting Meerut-Karnal section of NH- | | | |
| | 709A) (Village- Karaunda, Tehsil -Budhana, District - | | | |
| | Muzaffarnagar) | | | |
+-----+-----------------------------------+-----------------------------------+-----------------------------------+-----------------------------------+
| 5 | Design Km 69+300 | | | |
| | Banati Kheda Interchange at Km 69+300 (Connecting Shamli- | | | |
| | Muzaffarnagar Section of NH 709AD (Village - Banti Khera, | | | |
| | Tehsil - Shamli, District - Shamli) | | | |
+-----+-----------------------------------+-----------------------------------+-----------------------------------+-----------------------------------+
| 6 | Design Km. 78+300 | | | |
| | Bhaisani Islampur Interchange (Connecting Ambala-Shamli NH | | | |
| | 344-GM) (Village – Bhaisani Islampur, Tehsil - Shamli, District - | | | |
| | Shamli) | | | |
+-----+-----------------------------------+-----------------------------------+-----------------------------------+-----------------------------------+
| 7 | Design Km. 82+870 | | | |
| | Khyawadi Interchange (Connecting Thanabhawan-Muzaffarnagar | | | |
| | Road-MDR 10W) (Village - Khyawadi, Tehsil - Shamli, District- | | | |
| | Shamli) | | | |
+-----+-----------------------------------+-----------------------------------+-----------------------------------+-----------------------------------+
| 8 | Design Km. 97+800 | | | |
| | Badgaon Interchange (Connecting Nanauta- Deoband Road-MDR | | | |
| | 2W) (Village - Badgaon, Tehsil – Rampur Maniharan, District- | | | |
| | Saharanpur) | | | |
+-----+-----------------------------------+-----------------------------------+-----------------------------------+-----------------------------------+
| 9 | Design Km. 108+500 | | | |
| | Halgoya Interchange (Connecting Haridwar Spur of NH-344-BG) | | | |
| | (Village - Halgoya, Tehsil - Rampur Maniharan, District- | | | |
| | Saharanpur) | | | |
+-----+-----------------------------------+-----------------------------------+-----------------------------------+-----------------------------------+
| 10 | Km. 115+900 | | | |
| | Rasoolpur Toll Plaza (Main TP) (Village – Rasoolpur Kheri Aht, | | | |
| | Tehsil - Deoband, District - Saharanpur) | | | |
| | (Exit at Design Km. 119+700 from Delhi- Dehradun Economic | | | |
| | Corridor Phase-II towards Saharanpur Bypass/ Delhi- Dehradun | | | |
| | Economic Corridor Phase-III) | | | |
+-----+-----------------------------------+-----------------------------------+-----------------------------------+-----------------------------------+
^The details of structures having length more than 60m are as under:
Table-5A
+-----+----------+-------------------+------------+---------------------------+---------------------------+
| S. No. | Packages | Type of structure | Design Km | Length of structure in Km | Equivalent Road length in Km |
+=====+==========+===================+============+===========================+===========================+
| (a) | (b) | (c) | (d) | (e) = (d) X 10 | |
+=====+==========+===================+============+===========================+===========================+
| 1 | Pkg-I | Interchange | 0+000 | 0.283 | 2.83 |
+-----+----------+-------------------+------------+---------------------------+---------------------------+
| 2 | | ROB | 15+591 | 0.126 | 1.26 |
+-----+----------+-------------------+------------+---------------------------+---------------------------+
| 3 | Pkg-II | Major Bridge | 35+875 | 0.084 | 0.84 |
+-----+----------+-------------------+------------+---------------------------+---------------------------+
| 4 | Pkg-IV | Interchange | 82+870 | 0.12 | 1.2 |
+-----+----------+-------------------+------------+---------------------------+---------------------------+
| 5 | | Interchange | 119+068 | 0.12 | 1.2 |
+-----+----------+-------------------+------------+---------------------------+---------------------------+
| | | Total | | 0.733 | 7.33 |
+-----+----------+-------------------+------------+---------------------------+---------------------------+
3. The total tollable length for which fee shall be due and payable is as under:
Table- 6
Distance matrix for total tollable road length (Including equivalent length of structures >60 m length)
+----------+-----+-------+--------+--------+--------+--------+--------+--------+--------+---------+---------+
| To | Km | 0 | 8.043 | 27.975 | 56.054 | 69.3 | 78.3 | 82.87 | 97.8 | 108.5 | 119.7 |
| Starting | 0 | | | | | | | | | | |
| Point at | | | | | | | | | | | |
| Design | | | | | | | | | | | |
| Km 0+000 | From| | | | | | | | | | |
| (Fee | | | | | | | | | | | |
| Plaza at | | | | | | | | | | | |
| Design | | | | | | | | | | | |
| Km. 3+520)| | | | | | | | | | | |
+----------+-----+-------+--------+--------+--------+--------+--------+--------+--------+---------+---------+
| From | Km | 0 | 8.043 | 27.975 | 56.054 | 69.3 | 78.3 | 82.87 | 97.8 | 108.5 | 119.7 |
| Starting | 0 | | | | | | | | | | |
| Point at | | 0 | 10.59 | 31.656 | 60.491 | 73.737 | 82.737 | 87.847 | 103.317| 114.017 | 126.297 |
| Design | | | | | | | | | | | |
| Km 0+000 | | | | | | | | | | | |
| (Fee | | | | | | | | | | | |
| plaza at | | | | | | | | | | | |
| Design | | | | | | | | | | | |
| Km 3+520) | | | | | | | | | | | |
+----------+-----+-------+--------+--------+--------+--------+--------+--------+--------+---------+---------+
| Fee Plaza| 8.043| 10.59 | 0 | 21.066 | 49.901 | 63.147 | 72.147 | 77.257 | 92.727 | 103.427 | 115.707 |
| at Design| | | | | | | | | | | |
| Km 8+043 | | | | | | | | | | | |
+----------+-----+-------+--------+--------+--------+--------+--------+--------+--------+---------+---------+
| Fee Plaza| 27.97| 31.656| 21.066 | 0 | 28.835 | 42.081 | 51.081 | 56.191 | 71.661 | 82.361 | 94.641 |
| at Design| 5 | | | | | | | | | | |
| Km 27+975| | | | | | | | | | | |
+----------+-----+-------+--------+--------+--------+--------+--------+--------+--------+---------+---------+
| Fee Plaza| 56.05| 60.491| 49.901 | 28.835 | 0 | 13.246 | 22.246 | 27.356 | 42.826 | 53.526 | 65.806 |
| at Design| 4 | | | | | | | | | | |
| Km 56+054| | | | | | | | | | | |
+----------+-----+-------+--------+--------+--------+--------+--------+--------+--------+---------+---------+
| Fee Plaza| 69.3 | 73.737| 63.147 | 42.081 | 13.246 | 0 | 9 | 14.11 | 29.58 | 40.28 | 52.56 |
| at Design| | | | | | | | | | | |
| Km 69+300| | | | | | | | | | | |
+----------+-----+-------+--------+--------+--------+--------+--------+--------+--------+---------+---------+
| Fee Plaza| 78.3 | 82.737| 72.147 | 51.081 | 22.246 | 9 | 0 | 5.11 | 20.58 | 31.28 | 43.56 |
| at Design| | | | | | | | | | | |
| Km 78+300| | | | | | | | | | | |
+----------+-----+-------+--------+--------+--------+--------+--------+--------+--------+---------+---------+
| Fee Plaza| 82.87| 87.847| 77.257 | 56.191 | 27.356 | 14.11 | 5.11 | 0 | 15.47 | 26.17 | 38.45 |
| at Design| | | | | | | | | | | |
| Km. 82+87| | | | | | | | | | | |
| 0 | | | | | | | | | | | |
+----------+-----+-------+--------+--------+--------+--------+--------+--------+--------+---------+---------+
| Fee Plaza| 97.8 | 103.317| 92.727 | 71.661 | 42.826 | 29.58 | 20.58 | 15.47 | 0 | 10.7 | 22.98 |
| at Design| | | | | | | | | | | |
| Km 97+800| | | | | | | | | | | |
+----------+-----+-------+--------+--------+--------+--------+--------+--------+--------+---------+---------+
| Fee Plaza| 108.5| 114.017| 103.427| 82.361 | 53.526 | 40.28 | 31.28 | 26.17 | 10.7 | 0 | 12.28 |
| at Design| | | | | | | | | | | |
| Km. | | | | | | | | | | | |
| 108+500 | | | | | | | | | | | |
+----------+-----+-------+--------+--------+--------+--------+--------+--------+--------+---------+---------+
| Fee Plaza| 119.7| 126.297| 115.707| 94.641 | 65.806 | 52.56 | 43.56 | 38.45 | 22.98 | 12.28 | 0 |
| at Design| | | | | | | | | | | |
| Km. | | | | | | | | | | | |
| 115+900 | | | | | | | | | | | |
+----------+-----+-------+--------+--------+--------+--------+--------+--------+--------+---------+---------+
| End Point| | | | | | | | | | | |
| at | | | | | | | | | | | |
| Design Km| | | | | | | | | | | |
| 119+700 | | | | | | | | | | | |
+----------+-----+-------+--------+--------+--------+--------+--------+--------+--------+---------+---------+
4. The various types of traffic movements for which the user fee will be charged on the basis of actual distance
travelled is as under:
Table 7a - Traffic plying on LHS from Delhi to Dehradun
+-----+----------+-----------------------------------+-----------------------------------+
| S/No. | Design Km. | Entry From | Exit To |
| | (length) | | |
+=====+==========+===================================+===================================+
| | | Preceding Fee Plaza at Design Km. 16+540 of Delhi-Dehradun Economic Corridor Phase-I (18.58 Kms from |
| | | Katha Toll Plaza at Design Km. 3+520 of Delhi-Dehradun Economic Corridor Phase-II) |
+-----+----------+-----------------------------------+-----------------------------------+
| 1 | 3+520 | Katha Toll Plaza (Main TP) at Design Km. | Tatiri Interchange at Design Km. 8+043 |
| | (3.520) | 3+520, Vill-Katha, Tehsil-Khekda, District- | (Connecting Baghpat- Meerut section of NH-334B) |
| | | Baghpat | Jalalpur Interchange at Design Km. 27+975 |
| | | | (Connecting Baraut- Muzaffarnagar section of MDR |
| | | | 135W) |
| | | | Karaunda Interchange at Design Km. 56+054 |
| | | | (Connecting Meerut- Karnal section of NH-709A) |
| | | | Banati Kheda Interchange at Design Km. 69+300 |
| | | | (Connecting Shamli- Muzaffarnagar section of NH- |
| | | | 709AD) |
| | | | Bhaisani Islampur Interchange at Design Km. |
| | | | 78+300 (Connecting Ambala-Shamli NH 344-GM) |
| | | | Khyawadi Interchange at Design Km. |
| | | | 82+870(Connecting Thanabhawan- Muzaffarnagar |
| | | | Road-MDR 10W) |
| | | (Entry from EPE Interchange at Baghpat/ | Badgaon Interchange at Design Km. 97+800 |
| | | Akshardham-Baghpat section of Delhi- | (Connecting Nanauta- Deoband Road-MDR 2W) |
| | | Dehradun Economic Corridor Phase-I | Halgoya Interchange at Design Km. 108+500 |
| | | | (Connecting Haridwar Spur of NH-344-BG) |
| | | | Exit through Rasoolpur Toll Plaza (Main TP at |
| | | | Design Km. 115+900) at Design Km. 119+700, |
| | | | towards Saharanpur Bypass- Ganeshpur section of |
| | | | Delhi- Dehradun Economic Corridor Phase-III) |
+-----+----------+-----------------------------------+-----------------------------------+
| 2 | 8+043 | Tatiri Interchange at Design Km. 8+043 (Vill- | Jalalpur Interchange at Design Km. 27+975 |
| | (8.043) | Tatiri, Tehsil-Baghpat, District-Baghpat) | (Connecting Baraut- Muzaffarnagar section of MDR |
| | | | 135W) |
| | | | Karaunda Interchange at Design Km. 56+054 |
| | | | (Connecting Meerut- Karnal section of NH-709A) |
| | | | Banati Kheda Interchange at Design Km. 69+300 |
| | | | (Connecting Shamli- Muzaffarnagar section of NH- |
| | | | 709AD) |
| | | | Bhaisani Islampur Interchange at Design Km. |
| | | | 78+300 (Connecting Ambala-Shamli NH 344-GM) |
| | | | Khyawadi Interchange at Design Km. |
| | | | 82+870(Connecting Thanabhawan- Muzaffarnagar |
| | | | Road-MDR 10W) |
| | | | Badgaon Interchange at Design Km. 97+800 |
| | | | (Connecting Nanauta- Deoband Road-MDR 2W) |
| | | | Halgoya Interchange at Design Km. 108+500 |
| | | | (Connecting Haridwar Spur of NH-344-BG) |
| | | | Exit through Rasoolpur Toll Plaza (Main TP at |
| | | | Design Km. 115+900) at Design Km. 119+700, |
| | | | towards Saharanpur Bypass- Ganeshpur section of |
| | | | Delhi- Dehradun Economic Corridor Phase-III) |
+-----+----------+-----------------------------------+-----------------------------------+
| 3 | 27+975 | Jalalpur Interchange at Design Km. 27+975 | Karaunda Interchange at Design Km. 56+054 |
| | (27.975) | (Village - Jalalpur, Tehsil - Baraut, District - | (Connecting Meerut- Karnal section of NH-709A) |
| | | Baghpat) | Banati Kheda Interchange at Design Km. 69+300 |
| | | | (Connecting Shamli- Muzaffarnagar section of NH- |
| | | | 709AD) |
| | | | Bhaisani Islampur Interchange at Design Km. |
| | | | 78+300 (Connecting Ambala-Shamli NH 344-GM) |
| | | | Khyawadi Interchange at Design Km. |
| | | | 82+870(Connecting Thanabhawan- Muzaffarnagar |
| | | | Road-MDR 10W) |
| | | | Badgaon Interchange at Design Km. 97+800 |
| | | | (Connecting Nanauta- Deoband Road-MDR 2W) |
| | | | Halgoya Interchange at Design Km. 108+500 |
| | | | (Connecting Haridwar Spur of NH-344-BG) |
| | | | Exit through Rasoolpur Toll Plaza (Main TP at |
| | | | Design Km. 115+900) at Design Km. 119+700, |
| | | | towards Saharanpur Bypass- Ganeshpur section of |
| | | | Delhi- Dehradun Economic Corridor Phase-III) |
+-----+----------+-----------------------------------+-----------------------------------+
| 4 | 56+054 | Karaunda Interchange at Design Km. 56+054 | Banati Kheda Interchange at Design Km. 69+300 |
| | (56.054) | (Village - Karaunda, Tehsil - Budhana, District | (Connecting Shamli- Muzaffarnagar section of NH- |
| | | Muzaffarnagar) | 709AD) |
| | | | Bhaisani Islampur Interchange at Design Km. |
| | | | 78+300 (Connecting Ambala-Shamli NH 344-GM) |
| | | | Khyawadi Interchange at Design Km. |
| | | | 82+870(Connecting Thanabhawan- Muzaffarnagar |
| | | | Road-MDR 10W) |
| | | | Badgaon Interchange at Design Km. 97+800 |
| | | | (Connecting Nanauta- Deoband Road-MDR 2W) |
| | | | Halgoya Interchange at Design Km. 108+500 |
| | | | (Connecting Haridwar Spur of NH-344-BG) |
| | | | Exit through Rasoolpur Toll Plaza (Main TP at |
| | | | Design Km. 115+900) at Design Km. 119+700, |
| | | | towards Saharanpur Bypass- Ganeshpur section of |
| | | | Delhi- Dehradun Economic Corridor Phase-III) |
+-----+----------+-----------------------------------+-----------------------------------+
| 5 | 69+300 | Banati Kheda Interchange at Design Km. | Bhaisani Islampur Interchange at Design Km. |
| | (69.300) | 69+300 (Village - Banti Khera, Tehsil - Shamli, | 78+300 (Connecting Ambala-Shamli NH 344-GM) |
| | | District - Shamli) | Khyawadi Interchange at Design Km. |
| | | | 82+870(Connecting Thanabhawan- Muzaffarnagar |
| | | | Road-MDR 10W) |
| | | | Badgaon Interchange at Design Km. 97+800 |
| | | | (Connecting Nanauta- Deoband Road-MDR 2W) |
| | | | Halgoya Interchange at Design Km. 108+500 |
| | | | (Connecting Haridwar Spur of NH-344-BG) |
| | | | Exit through Rasoolpur Toll Plaza (Main TP at |
| | | | Design Km. 115+900) at Design Km. 119+700, |
| | | | towards Saharanpur Bypass- Ganeshpur section of |
| | | | Delhi- Dehradun Economic Corridor Phase-III) |
+-----+----------+-----------------------------------+-----------------------------------+
| 6 | 78+300 | Bhaisani Islampur Interchange at Design Km. | Khyawadi Interchange at Design Km. |
| | (78.300) | 78+300 (Connecting Ambala-Shamli section of | 82+870(Connecting Thanabhawan- Muzaffarnagar |
| | | NH 344-GM) (Village – Bhaisani Islampur, | Road-MDR 10W) |
| | | | Badgaon Interchange at Design Km. 97+800 |
| | | | (Connecting Nanauta- Deoband Road-MDR 2W) |
| | | | Halgoya Interchange at Design Km. 108+500 |
| | | | (Connecting Haridwar Spur of NH-344-BG) |
| | | | Exit through Rasoolpur Toll Plaza (Main TP at |
| | | | Design Km. 115+900) at Design Km. 119+700, |
| | | | towards Saharanpur Bypass- Ganeshpur section of |
| | | | Delhi- Dehradun Economic Corridor Phase-III) |
+-----+----------+-----------------------------------+-----------------------------------+
| 7 | 82+870 | Khyawadi Interchange at Design Km. 82+870 | Badgaon Interchange at Design Km. 97+800 |
| | (82.870) | (Village - Hasanpur Luhari, Tehsil - Shamli, | (Connecting Nanauta- Deoband Road-MDR 2W) |
| | | District - Shamli) | Halgoya Interchange at Design Km. 108+500 |
| | | | (Connecting Haridwar Spur of NH-344-BG) |
| | | | Exit through Rasoolpur Toll Plaza (Main TP at |
| | | | Design Km. 115+900) at Design Km. 119+700, |
| | | | towards Saharanpur Bypass- Ganeshpur section of |
| | | | Delhi- Dehradun Economic Corridor Phase-III) |
+-----+----------+-----------------------------------+-----------------------------------+
| 8 | 97+800 | Badgaon Interchange at Design Km. 97+800 | Halgoya Interchange at Design Km. 108+500 |
| | (97.800) | (Connecting Nanauta-Deoband Road MDR | (Connecting Haridwar Spur of NH-344-BG) |
| | | 10W) (Village - Badgaon, Tehsil - Rampur | Exit through Rasoolpur Toll Plaza (Main TP at |
| | | Maniharan, District - Saharanpur) | Design Km. 115+900) at Design Km. 119+700, |
| | | | towards Saharanpur Bypass- Ganeshpur section of |
| | | | Delhi- Dehradun Economic Corridor Phase-III) |
+-----+----------+-----------------------------------+-----------------------------------+
| 9 | 108+500 | Halgoya Interchange at Design Km. 108+500 | Exit through Rasoolpur Toll Plaza (Main TP at |
| | (108.500)| (Connecting Haridwar Spur of NH-344- | Design Km. 115+900) at Design Km. 119+700, |
| | | BG(Village - Halgoya, Tehsil - | towards Saharanpur Bypass- Ganeshpur section of |
| | | Rampur Maniharan, District-Saharanpur) | Delhi- Dehradun Economic Corridor Phase-III) |
+-----+----------+-----------------------------------+-----------------------------------+
Table 7b - Traffic plying on LHS from Dehradun to Delhi
+-----+----------+-----------------------------------+-----------------------------------+
| S/No. | Design Km. | Entry From | Exit To |
| | (length) | | |
+=====+==========+===================================+===================================+
| | | Preceding Fee Plaza at Design Km. 18+900 of Saharanpur Bypass-Ganeshpur section of Delhi- Dehradun |
| | | Economic Corridor Phase-III (22.70 Kms from Rasoolpur Toll Plaza at Design Km.115+900 of Delhi-Dehradun |
| | | Economic Corridor Phase-II) | |
+-----+----------+-----------------------------------+-----------------------------------+
| 1 | 115+900 | Rasoolpur Toll Plaza (Main TP) at Design | Halgoya Interchange at Design Km. 108+500 |
| | (-2.800) | Km. 115+900 (Village -Rasoolpur Kheri | (Connecting Haridwar Spur of NH-344-BG) |
| | | Ah., Tehsil - Deoband, District - | Badgaon Interchange at Design Km. 97+800 |
| | | Saharanpur | (Connecting Nanauta- Deoband Road-MDR 2W) |
| | | | Khyawadi Interchange at Design Km. |
| | | | 82+870(Connecting Thanabhawan- Muzaffarnagar |
| | | | Road-MDR 10W) |
| | | | Bhaisani Islampur Interchange at Design Km. 78+300 |
| | | | (Connecting Ambala-Shamli NH 344-GM) |
| | | | Banati Kheda Interchange at Design Km. 69+300 |
| | | | (Connecting Shamli-Muzaffarnagar section of NH- |
| | | | 709AD) |
| | | | Karaunda Interchange at Design Km. 56+054 |
| | | | (Connecting Meerut-Karnal section of NH-709A) |
+-----+----------+-----------------------------------+-----------------------------------+
| 2 | 108+500 | Halgoya Interchange at Design Km. | Jalalpur Interchange at Design Km. 27+975 |
| | (-11.200)| 108+500 (Connecting Haridwar Spur of | (Connecting Baraut-Muzaffarnagar section of MDR |
| | | NH-344- BG(Village - Halgoya, Tehsil | 135W) |
| | | Rampur Maniharan, District-Saharanpur) | Tatiri Interchange at Design Km. 8+043 (Connecting |
| | | | Baghpat- Meerut section of NH-334B) |
| | | | Exit through Katha Toll Plaza (Main TP at Design Km. |
| | | | 3+520) to Km. 0+000, towards Delhi-Dehradun |
| | | | Economic Corridor Phase-I |
| | | | Badgaon Interchange at Design Km. 97+800 |
| | | | (Connecting Nanauta-Deoband Road-MDR 2W) |
| | | | Khyawadi Interchange at Design Km. |
| | | | 82+870(Connecting Thanabhawan- Muzaffarnagar |
| | | | Road-MDR 10W) |
| | | | Bhaisani Islampur Interchange at Design Km. 78+300 |
| | | | (Connecting Ambala-Shamli NH 344-GM) |
| | | | Banati Kheda Interchange at Design Km. 69+300 |
| | | | (Connecting Shamli-Muzaffarnagar section of NH- |
| | | | 709AD) |
| | | | Karaunda Interchange at Design Km. 56+054 |
| | | | (Connecting Meerut- Karnal section of NH-709A) |
| | | | Jalalpur Interchange at Design Km. 27+975 |
| | | | (Connecting Baraut- Muzaffarnagar section of MDR |
| | | | 135W) |
| | | | Tatiri Interchange at Design Km. 8+043 (Connecting |
| | | | Baghpat- Meerut section of NH-334B) |
| | | | Exit through Katha Toll Plaza (Main TP at Design Km. |
| | | | 3+520) to Km. 0+000, towards Delhi-Dehradun |
| | | | Economic Corridor Phase-I |
+-----+----------+-----------------------------------+-----------------------------------+
| 3 | 97+800 | Badgaon Interchange at Design Km. | Khyawadi Interchange at Design Km. |
| | (-21.900)| 97+800 (Connecting Nanauta-Deoband | 82+870(Connecting Thanabhawan- Muzaffarnagar |
| | | Road MDR 10W) (Village - Badgaon, | Road-MDR 10W) |
| | | Tehsil - Rampur Maniharan, District - | Bhaisani Islampur Interchange at Design Km. 78+300 |
| | | Saharanpur) | (Connecting Ambala-Shamli NH 344-GM) |
| | | | Banati Kheda Interchange at Design Km. 69+300 |
| | | | (Connecting Shamli-Muzaffarnagar section of NH- |
| | | | 709AD) |
| | | | Karaunda Interchange at Design Km. 56+054 |
| | | | (Connecting Meerut- Karnal section of NH-709A) |
| | | | Jalalpur Interchange at Design Km. 27+975 |
| | | | (Connecting Baraut-Muzaffarnagar section of MDR |
| | | | 135W) |
| | | | Tatiri Interchange at Design Km. 8+043 (Connecting |
| | | | Baghpat- Meerut section of NH-334B) |
| | | | Exit through Katha Toll Plaza (Main TP at Design Km. |
| | | | 3+520) to Km. 0+000, towards Delhi-Dehradun |
| | | | Economic Corridor Phase-I |
+-----+----------+-----------------------------------+-----------------------------------+
| 4 | 82+870 | Khyawadi Interchange at Design Km. | Bhaisani Islampur Interchange at Design Km. 78+300 |
| | (-36.830)| 82+870 (Village - Hasanpur Luhari, Tehsil | (Connecting Ambala-Shamli NH 344-GM) |
| | | Shamli, District - Shamli) | Banati Kheda Interchange at Design Km. 69+300 |
| | | | (Connecting Shamli-Muzaffarnagar section of NH- |
| | | | 709AD) |
| | | | Karaunda Interchange at Design Km. 56+054 |
| | | | (Connecting Meerut- Karnal section of NH-709A) |
| | | | Jalalpur Interchange at Design Km. 27+975 |
| | | | (Connecting Baraut-Muzaffarnagar section of MDR |
| | | | 135W) |
| | | | Tatiri Interchange at Design Km. 8+043 (Connecting |
| | | | Baghpat- Meerut section of NH-334B) |
| | | | Exit through Katha Toll Plaza (Main TP at Design Km. |
| | | | 3+520) to Km. 0+000, towards Delhi-Dehradun |
| | | | Economic Corridor Phase-I |
+-----+----------+-----------------------------------+-----------------------------------+
| 5 | 78+300 | Bhaisani Islampur Interchange at Design | Banati Kheda Interchange at Design Km. 69+300 |
| | (-41.400)| Km. 78+300 (Connecting Ambala-Shamli | (Connecting Shamli-Muzaffarnagar section of NH- |
| | | section of NH 344-GM) (Village | 709AD) |
| | | Bhaisani Islampur, Tehsil - Shamli, | Karaunda Interchange at Design Km. 56+054 |
| | | District - Shamli) | (Connecting Meerut- Karnal section of NH-709A) |
| | | | Jalalpur Interchange at Design Km. 27+975 |
| | | | (Connecting Baraut-Muzaffarnagar section of MDR |
| | | | 135W) |
| | | | Tatiri Interchange at Design Km. 8+043 (Connecting |
| | | | Baghpat- Meerut section of NH-334B) |
| | | | Exit through Katha Toll Plaza (Main TP at Design Km. |
| | | | 3+520) to Km. 0+000, towards Delhi-Dehradun |
| | | | Economic Corridor Phase-I |
+-----+----------+-----------------------------------+-----------------------------------+
| 6 | 69+300 | Banati Kheda Interchange at Design Km. | Karaunda Interchange at Design Km. 56+054 |
| | (-50.400)| 69+300 (Village - Banti Khera, Tehsil - | (Connecting Meerut- Karnal section of NH-709A) |
| | | Shamli, District - Shamli) | Jalalpur Interchange at Design Km. 27+975 |
| | | | (Connecting Baraut-Muzaffarnagar section of MDR |
| | | | 135W) |
| | | | Tatiri Interchange at Design Km. 8+043 (Connecting |
| | | | Baghpat- Meerut section of NH-334B) |
| | | | Exit through Katha Toll Plaza (Main TP at Design Km. |
| | | | 3+520) to Km. 0+000, towards Delhi-Dehradun |
| | | | Economic Corridor Phase-I |
+-----+----------+-----------------------------------+-----------------------------------+
| 7 | 56+054 | Karaunda Interchange at Design Km. | Jalalpur Interchange at Design Km. 27+975 |
| | (-63.646)| 56+054 (Village - Karaunda, Tehsil - | (Connecting Baraut-Muzaffarnagar section of MDR |
| | | Budhana, District - Muzaffarnagar) | 135W) |
| | | | Tatiri Interchange at Design Km. 8+043 (Connecting |
| | | | Baghpat- Meerut section of NH-334B) |
| | | | Exit through Katha Toll Plaza (Main TP at Design Km. |
| | | | 3+520) to Km. 0+000, towards Delhi-Dehradun |
| | | | Economic Corridor Phase-I |
+-----+----------+-----------------------------------+-----------------------------------+
| 8 | 27+975 | Jalalpur Interchange at Design Km. | Tatiri Interchange at Design Km. 8+043 (Connecting |
| | (-91.725)| 27+975 (Village - Jalalpur, Tehsil - | Baghpat- Meerut section of NH-334B) |
| | | Baraut, District - Baghpat) | Exit through Katha Toll Plaza (Main TP at Design Km. |
| | | | 3+520) to Km. 0+000, towards Delhi-Dehradun |
| | | | Economic Corridor Phase-I |
+-----+----------+-----------------------------------+-----------------------------------+
| 9 | 8+043 | Tatiri Interchange at Design Km. 8+043 | Exit through Katha Toll Plaza (Main TP at Design Km. |
| | (-111.657)| (Vill-Tatiri, Tehsil- Baghpat, District- | 3+520) to Km. 0+000, towards Delhi-Dehradun |
| | | Baghpat) | Economic Corridor Phase-I |
+-----+----------+-----------------------------------+-----------------------------------+
| | | Succeeding Fee Plaza at Design Km. 16+540 of Delhi-Dehradun Economic Corridor Phase-I (18.58 Kms from |
| | | Katha Toll Plaza at Design Km. 3+520 of Delhi-Dehradun Economic Corridor Phase-II) |
+-----+----------+-----------------------------------+-----------------------------------+
5. The vehicle entering from any Interchange Fee Plaza will be recorded at the Entry fee Plaza and user Fee will
be collected at Exit Interchange Fee Plaza for the road section used by the vehicle between Entry and Exit Fee Plazas.
6. For multiple journeys on the highway section, passes shall be issued at the following rates, namely:
Table-8
+-----------------------------------+-----------------------------------+-----------------------------------+
| Amount Payable | Maximum number of | Period of Validity |
| | one- way journeys | |
| | allowed | |
+===================================+===================================+===================================+
| One and half times of the fee for one-way | Two | Twenty-four hours from the time of|
| journey* | | payment |
+-----------------------------------+-----------------------------------+-----------------------------------+
| Two-third of amount of the fee payable for fifty | Fifty | One month from date of payment |
| single journeys* | | |
+-----------------------------------+-----------------------------------+-----------------------------------+
* Provided that the user uses the same entry and exit fee plazas while performing the return journey.
7. The driver or owner or a person in charge of a mechanical vehicle which is loaded in excess of permissible
load specified for its category, shall be liable to pay fee for entering the overloaded vehicle on the National Highway
to the fee collecting agency, equal to the fee specified in sub-rule 1A of rule 10 of the said rules, and shall not be
entitled to make use of the highway section unless the excess load has been removed from such mechanical vehicle.
8. All definitions including category of mechanical vehicles, its permissible load, category of exempted
vehicles, service road, alternative road etc. shall be as per definitions specified in the rules.
9. The fee rates shall be displayed for information of the users in accordance with rules 12 of the said rules.
10. Based on the Base rate of fee per Design Km. for the base year 2007-08 as mentioned in Table-1 above, the
actual amount of fee to be charged from the mechanical vehicles and the discounts will be calculated by the Authority
on the basis of the completed length of the section and revised annually in accordance with the rule 5 of the said rules
and the same shall be published in at least one newspaper, each in English and vernacular language accordingly.
11. The estimated capital cost of the project is Rs. 5125.57 Cr. The capital cost is subject to variation as the
activities of land acquisition, utility shifting, tree cutting etc. are yet to be completed. The Authority shall maintain a
record of the recovery of capital cost through user fee realized.
[F. No. DLDIV-20013/47/2024-PIUBaghpat/E-248780]
VINAY KUMAR, Additional Secy.
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.
Login to read full text