Full Text
6992 GI/202 3 (1)
EXTRAORDINARY
PART II —Section 3 —Sub-section ( ii)
PUBLISHED BY AUTHORITY
No. 4623] NEW DELHI, MON DAY , NOVEMBER 6, 2023/ KARTIKA 15, 1945
CG-DL-E-07112023-249920
CG-DL-E-07112023-249920
2 THE GAZETT E OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
(1) (2)
108.119
का 100 %
64.328
का 100 %
दकमी 328.050 पर 111.165
का 100 %
1 107.305 107.395 फ्लाईओवर 90.0
2 121.280 121.370 फ्लाईओवर 90.0
3 122.230 122.320 फ्लाईओवर 90.0
4 128.780 129.050 वायडक् ट 270.0
5 131.510 131.689 बडा पुल 178.8
6 158.005 158.095 फ्लाईओवर 90.0
7 160.1 97 160.304 बडा पुल 107.0
8 175.111 175.188 बडा पुल 77.0
9 179.755 179.845 फ्लाईओवर 90.0
10 180.755 180.845 फ्लाईओवर 90.0
11 180.871 181.247 बडा पुल 376.40
12 185.862 185.938 बडा पुल 76.2
13 194.668 194.833 बडा पुल 165.4
14 203.055 203.145 फ्लाईओवर 90.0
क ु ल 1880.80
1 206.500 206.620 वायडक् ट 120.0
2 211.264 211.337 बडा पुल 73.2
3 212.034 212.168 बडा पुल 133.5
4 214.459 214.542 बडा पुल 82.5
5 221.967 222.034 बडा पुल 67.58
6 226.540 226.660 बडा पुल 120.0
7 227.580 227.670 फ्लाईओवर 90.0
8 255.200 255.710 वायडक् ट 510.0
4 THE GAZETT E OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
9 260.148 260.353 बडा पुल 205.1
10 265.405 265.495 फ्लाईओवर 90.0
11 265.995 266.085 फ्लाईओवर 90.0
12 267.905 267.995 फ्लाईओव र 90.0
क ु ल 1671.88
1 272.485 272.575 फ्लाईओवर 90.0
2 273.005 273.095 फ्लाईओवर 90.0
3 273.955 274.045 फ्लाईओवर 90.0
4 293.155 293.245 फ्लाईओवर 90.0
5 294.131 294.470 बडा पुल 339
6 310.005 310.095 फ्लाईओवर 90.0
7 311.355 311.445 फ्लाईओवर 90.0
8 312.355 312.445 फ्लाईओवर 90.0
9 313.655 313.745 फ्लाईओवर 90.0
10 314.400 314.610 वायडक् ट 210.0
11 320.100 320.3 10 वायडक् ट 210.0
12 328.665 329.336 बडा पुल 670.6
13 343.155 343.245 फ्लाईओवर 90.0
15 363.688 363.912 बडा पुल 223.8
16 371.205 371.295 फ्लाईओवर 90.0
17 372.405 372.495 फ्लाईओवर 90.0
18 372.969 373.031 आरओबी 61.64
19 379.555 379.64 5 फ्लाईओवर 90.0
क ु ल 3935.04
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTI FICATION
New Delhi, the 2nd November , 2023
S.O. 4822(E).—Whereas by notification of the Governm ent of India in the Ministry of Road Transport and
Highways number S.O. 1192(E) dated 3rd December ,2001,issued under Sect ion 11 of the National Highways
Authority of India Act 1988 (68 of 1988), the Central Governmen t has entrusted the Panipat to Jalandha r section from
Km 96.000 to 387.100 of New NH No. 44 (Old NH No. 1) in the State of Haryana & Punjab to the National Highw ays
Authority of India (hereinafter referred to as the “Authority”);
Now, therefore, in exercise of the powers conferred by section 7 of the National Highways Act, 1956 (48 of
1956), read with rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008
6 THE GAZETT E OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
(hereinafter referred to as the “rules”) and in suppression of the notification s S.O. No. 926 (E) dated 6th April, 2009
& S.O. No. 1729 (E) dated 10thJuly, 2014, the Central Government hereby levies the fee on mech anical vehicles at
100% of the base r ate specified in column (2) of the Table 1 for n et road section length of 283.612 km for the use of
Four lane or above and at 100% of the base rate specified in columns (2) of the Table 1 and for total equivalent length
of structure (having more than 60m length) of 74.88 Km ( having total length of 7.488 Km) on the type of vehicles
specified in column (1) of the Table 1 below of Panipat to Jalandhar section from Km 96.000 to 387.100 of New NH
No. 44 (Old NH no. 1) in the State of Haryana & Punjab and authorises the Authority to collect, either through its
officials or through a contractor, the said fee, namely: -
Table -1
Type of vehicle Base rate of fee per km for the base
year 2007 -08 (in Rupees)
(1) (2)
Car, Jeep, Van or Light Motor Vehicle 0.65
Light Commercial Vehicle, Light Goods Vehicle or Mini B us 1.05
Bus or Truck (Two Axles) 2.20
Three -axle commercial vehicles 2.40
Heavy Construction Machinery (HCM) or Earth Moving Equipment (EME)
or Multi Axle Vehicle (MAV) (four to six axles) 3.45
Oversized Vehicles (seven or more axles) 4.20
1. The fe e to be levied and collected hereunder shall be due and payable at the Fee Plaza for net road length
specified for such Fee Plaza(s), namely:
Table -2
Location of Fee Plaza (chainage) Length (in km) for which Fee is payable Rate at which fee is
payable
At Km 111.483 of NH -44 (old NH1)
Near Gharaunda in Karnal District 108.119
[Excluding length of By pass (Costing >10 Cr.) and
length of Structure (>60m)] 100% for four or more lane,
of the base rates mentioned
in Tab le-1 above
At Km 211.805 of NH -44 (old NH -
1) Near Ghaggar River in Ambala
District 64.328
[Excluding length of Bypass (Costing >10 Cr.) and
length of Structure (>60m)] 100% for four or more lane,
of the base rates mentioned
in Tab le-1 above
At Km 328.050 of NH -44 (old NH -
1) Near Ladowal Village in
Ludhiana District 111.165
[Excluding length of By pass (Costing >10 Cr.) and
length of Structure (>60m)] 100% for four or more lane,
of the base rates m entioned
in Tab le-1 above
2. In addition to above, the following fee shall also be due and payable fo r the use of the following structures
having length more than 60m at the following Fee Plaza(s), by converting the length of structures into an equivalent
length of highway by multiplying the length of such structures by an equalisation factor of 10: -
Table-3
Location of Fee Plaza
(chainage) Length of structures (in
km) to be converted into
equivalent road length Equivalent
road length (in
km) Rate at which fee is payable
At Km 111.483 of NH -44 (old
NH-1),Near Gharaunda in Karnal
District 1.881* 18.81 100% for four or more lane, of the
base rates mentioned in Tab le-1
above
At Km 211.805 of NH -44 (old
NH-1), Near Ghaggar River in
Ambala District 1.672** 16.72 100% for four or more lane, of the
base rates mentioned in Tab le-1
above
At Km 328.050 of NH -44 (old
NH-1), Near Ladowal Village in
Ludhiana District 3.935*** 39.35 100% for four or more lane, of the
base rates mentioned in Tab le-1
above
*The details of structure are as under: -
Sr
no. Chainage Type of Structure Length (in m) From Km To Km
1 107.305 107.395 Flyover 90.0
2 121.280 121.370 Flyover 90.0
3 122.230 122.320 Flyover 90.0
4 128.780 129.050 Viaduct 270.0
5 131.510 131.689 Major Bridge 178.8
6 158.005 158.095 Flyover 90.0
7 160.197 160.304 Major Bridge 107.0
8 175.111 175.188 Major Bridge 77.0
9 179.755 179.845 Flyover 90.0
10 180.755 180.845 Flyover 90.0
11 180.871 181.247 Major Bridge 376.40
12 185.862 185.938 Major Bridge 76.2
13 194.668 194.833 Major Bridge 165.4
14 203.055 203.145 Flyover 90.0
Total 1880.80
**The details of structure are as under: -
Sr
no. Chainage
Type of Structure Length (in m)
From Km To Km
1 206.500 206.620 Viaduct 120.0
2 211.264 211.337 Major Bridge 73.2
3 212.034 212.168 Major Bridge 133.5
4 214.459 214.542 Major Bridge 82.5
5 221.967 222.034 Major Bridge 67.58
6 226.540 226.660 Major Bridge 120.0
7 227.580 227.670 Flyover 90.0
8 255.200 255.710 Viaduct 510.0
9 260.148 260.353 Major Bridge 205.1
10 265.405 265.495 Flyover 90.0
11 265.995 266.085 Flyover 90.0
12 267.905 267.99 5 Flyover 90.0
Total 1671.88
***The details of structure are as under: -
Sr
no. Chainage Type of Structure Length (in m) From Km To Km
1 272.485 272.575 Flyover 90.0
2 273.005 273.095 Flyover 90.0
3 273.955 274.045 Flyover 90.0
4 293.155 293.2 45 Flyover 90.0
5 294.131 294.470 Major Bridge 339
6 310.005 310.095 Flyover 90.0
7 311.355 311.445 Flyover 90.0
8 312.355 312.445 Flyover 90.0
9 313.655 313.745 Flyover 90.0
10 314.400 314.610 Viaduct 210.0
11 320.100 320.310 Viaduct 210.0
12 328.665 329.336 Major Bridge 670.6
13 343.155 343.245 Flyover 90.0
8 THE GAZETT E OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
14 353.020 354.160 Phagwara
Viaduct/Elevated 1140.0
15 363.688 363.912 Major Bridge 223.8
16 371.205 371.295 Flyover 90.0
17 372.405 372.495 Flyover 90.0
18 372.969 373.031 ROB 61.64
19 379.555 379.645 Flyover 90.0
Total 3935.04
Total Length of Structures in between Chainage 96.000 to 387.100 7487.72
3. The rate of monthly pass for a person who owns a mechanical vehicle registered for non -commercial purposes
and resides within a distance of twenty kilometres from the fee plaza is Rs 330 (Three Hundred and Thirty Rupees
Only) for the year 2023 -24 and is subject to revision every year as per the provisions of the said rules.
4. For multiple journeys on the highway section, p asses shall be issu ed at the following rates, namely: -
Table -4
Amount Payable Maximum number of one way
journeys allowed Period of validity
One and one -half times of the fee for
one way journey Two Twenty four hours from the time of
payment
Two-third o f amount of the fee
payable for fifty single journeys Fifty One month from date of payment
5. Fee for commercial vehicle (excluding vehicles plying under National permit) registered in the district where
the fee plaza falls shall be 50% of the spec ified rate for that category of vehicle provided no service road or alternative
road is available for use of such commercial vehicles.
6. The driver or owner or a person in charge of a mechanical vehicle which is loaded in excess of permissible load
specified for its category, shall be liable to pay fee for entering the overloaded vehicle on the National Highway to the
fee collecting agency, equal to the fee specified in sub -rule 1A of rule 10 of the said rules, and shall not be entitled to
make use of the highway section unless the excess load has been removed from such mechanical vehicle.
7. All definitions including category of mechanical vehicles, its permissible load, category of exempted vehicles,
service road, alternative road, etc. shal l be as per d efinitions specified in the said rules.
8. The fee rates shall be displayed for information of the users in accordance with rule 12 of the said rules.
9. Based on the base rate of fee per kilometer for the base year 2007 -08 as mentioned in Table -1 above, the actual
amount of fee to be charged from the mechanical vehicles and the discounts will be calculated by the Authority on the
basis of the completed length of the section and revised annually in accordance with the rule 5 of the said rules and the
same shall be published in at least one newspaper in English and vernacular language.
10. The estimated capital cost of the project is Rs. 4218.27 Cr ore. The capital cost is subject to variation as the
activities of land acquisitio n, utility shifting, tree cutting, etc. are yet to be completed. The Authority shall maintain a
record of the recovery of capital cost through user fee realised.
[F. No. 11012/P h-V/NH -1/SomaIsolux/DK -II/2008/FeeNotificationonPublicfunded/E -206011 ]
SUMA N PRASAD SINGH , Jt. Secy.
Uploaded by Dte. of Printing at Government of India Press, Ring R oad, Mayapuri, New Delhi -110064
and Published by th e Controller of Publications, Delhi -110054.