Ministry of Railways
Publication of notification of extraordinary gazette under Part II section 3 Sub Section (I) Notification under clause 20 A of the Railway Act 1989 (24 of 1989)for land to be acquired in connection with Special Railway Project, namely 5 th and 6 th line between Borivali Virar on Western Railway, under MUTP IIIA in District Vasai in the State of Maharashtra.
The Central Government declares its intention to acquire land for the 5th and 6th railway lines between Borivali-Virar on Western Railway under Section 20A of the Railways Act, 1989.
Extract:
execution of the Special Railway Project, namely, 5th &
6th line between Borivali -Virar on Western Railway, under MUTP IIIA in District Vasai in the State...structure, for the Special Railway Project, namely,
5th & 6th line between Borivali -Virar on Western Railway, under MUTP IIIA projects in Thane Taluka,
District Thane
Tuesday, December 05, 2023
Ministry of Railways
Publication of extraordinary gazette under Part II Section 3 Sub Section ii Notification under Section 20E of the Railway Act, 1989 24 of 1989 in connection with private land acquisition for Quadrupling of Virar Dahanu Road Railway Project under MUTP III in the Palghar District in the State of Maharashtra
The Ministry of Railways (Western Railway), under section 20E of the Railways Act, 1989, declares the final acquisition and absolute vesting in the Central Government of land in Palghar district, Maharashtra, for the Special Railway Project 'Quadrupling of Virar-Dahanu corridor' under MUTP III.
Extract:
maintenance, management and operation of a Special Railway Project namely, Quadrupling of Virar -Dahanu corridor
on Wester n Railway, of MUTP III projects...with or without structure, for the Special Railway Project, namely,
Quadrupling of Virar -Dahanu corridor on Western Railway, of MUTP III projects in District Palghar
Saturday, July 04, 2026
Ministry of Railways
Published with 9 days delay9d
Publication of notification under clause 20E of the Railway Act 1989 (24 of 1989) for acquisition of land in connection with the Special Railway Project, namely, Quadrupling of Virar Dahanu Corridor on Western Railway under MUTP III Projects in District Palghar, State of Maharashtra.
The Central Government declares the acquisition of land specified in the annexed schedule for the Quadrupling of Virar-Dahanu Corridor on Western Railway, and that upon publication, this land shall vest absolutely in the Central Government free from all encumbrances, under sub-sections (1) and (2) of section 20E of the Railways Act, 1989.
Extract:
maintenance, management and operation of a Special Railway Project namely, Quadrupling of Virar-Dahanu Corridor on Western Railway, of MUTP III Projects in the district...with or without structure, for the special Railway Project, namely, Quadrupling of Virar – Dahanu Corridor on Western Railway, of MUTP-III Projects in Vasai Taluka
Thursday, June 12, 2025
Ministry of Railways
Publication of notification under Sub section(I) of section 20A under Railway Act 1989 corridor on (The Railway Amendment Act 2008) (11 of 2008) , for the Special Railway Project, Namely, Quadrupling of Virar Dahanu corridor Western Railway, of MUTP III Projects in Vasai Taluka, District Palghar in the State of Maharashtra
The Central Government declares its intention to acquire specific land in Palghar District, Maharashtra, for the Quadrupling of the Virar-Dahanu corridor, a Special Railway Project, under Section 20A of the Railways Act, 1989.
Extract:
required for execution of the Special Railway Project, namely,
Quadrupling of Virar-Dahanu corridor on Western Railway, of MUTP III projects in District Palghar...with or without structure, for the Special Railway Project, namely,
Quadrupling of Virar-Dahanu corridor on Western Railway, of MUTP III projects in Vasai Taluka
Wednesday, July 09, 2025
Ministry of Railways
Published with 13 days delay13d
Publication of notification of extraordinary Gazette under section 20E Part II section 3 Sub section ii of Railway Act 1989 The Railway Amendment Act 2008 for the Special Railway Project Namely 5th 6th Line between Borivali Virar on Western Railway in Vasai Taluka District Thane in the State of Maharashtra
The Central Government declares the acquisition of specified lands for the "Borivali Virar - 5th & 6th Railway Line Project" in Palghar District, Maharashtra.
Extract:
execution, maintenance,
management and operation of Special Railway Project, namely “Borivali Virar - 5th & 6th Railway Line
Project" in the district of Palghar in the State...acquired, with or without structures, falling within the Special
Railway Project “Borivali Virar 5th & 6th Railway Line” in Village Diwanman and Navghar in Vasai
Taluka
Tuesday, July 07, 2026
Ministry of Railways
Published with 12 days delay12d
Publication of notification of extraordinary gazette under Part II Section 3 Sub Section (I) Notification under clause 20A of the Railway Act 1989 (24 of 1989) for land to be acquired in connection with Special Railway Project, namely, Quadrupling of Virar Dahanu Corridor on Western Railway of MUTP III Projects in District Palghar in the State of Maharashtra.
The Central Government declares its intention to acquire land for the Quadrupling of Virar-Dahanu corridor on Western Railway, a Special Railway Project under Section 20A of the Railways Act, 1989.
Extract:
required for execution of the Special Railway Project, namely, Quadrupling of Virar-Dahanu corridor on Western Railway, of MUTP III projects in District Palghar...with or without structure, for the Special Railway Project, namely, Quadrupling of Virar-Dahanu corridor on Western Railway, of MUTP III projects in Palghar Taluka
Wednesday, May 13, 2026
Ministry of Railways
Publication of notification of extraordinary gazette under Part II section 3 Sub
Section (I) Notification under clause 20A of the Railway Act 1989 (24 of 1989)
for land to be acquired in connection with Special Railway Project 5th and 6th line
between Borivali Virar on Western Railway under MUTP IIIA projects in
Borivali Taluka District Mumbai Suburban in the State of Maharashtra
The Central Government declares its intention to acquire land for the Special Railway Project, namely, 5th & 6th line between Borivali -Virar on Western Railway, under Section 20A of the Railways Act, 1989.
Extract:
execution of the Special Railway Project, namely, 5th & 6th
line between Borivali -Virar on Western Railway, under MUTP IIIA in District Mumbai Suburban...structure, for the Special Railway Project, namely,
5th & 6th line between Borivali -Virar on Western Railway, under MUTP IIIA projects in Borivali Taluka,
District Mumbai
Saturday, April 18, 2026
Ministry of Railways
Publication of notification of extraordinary gazette under Part II section 3 Sub
Section (I) Notification under clause 20A of the Railway Act 1989 (24 of 1989)
for land to be acquired in connection with Special Railway Project Quadrupling of Virar Dahanu corridor on Western Railway of MUTP III projects in Palghar Taluka, District Palghar in the State of Maharashtra
The Central Government declares its intention to acquire land for the public purpose of executing the Special Railway Project, namely, Quadrupling of Virar-Dahanu corridor on Western Railway, under Section 20A of the Railways Act, 1989.
Extract:
required for execution of the Special Railway Project, namely, Quadrupling
of Virar-Dahanu corridor on Western Railway, of MUTP III projects in District Palghar...with or without structure, for the Special Railway Project, namely,
Quadrupling of Virar-Dahanu corridor on Western Railway, of MUTP III projects in Palghar Taluka
Friday, February 27, 2026
Ministry of Railways
Publication of notification of extraordinary gazette under Part II section 3 Sub Section (II) Notification under clause 20 E of the Railway Act 1989 (24 of 1989) for Land to be acquired in connection with Special Railway Project, namely Borivali Virar fifth and sixth Railway Line in Village Diwanman in Vasai Taluka by Competent Authority for Land Acquisition and Sub Division Officer s Office, Vasai District Palghar in the State of Maharashtra
The Central Government declares the acquisition of lands specified in the annexed schedule for the "Borivali Virar - 5th & 6th Railway Line Project" in the Palghar district of Maharashtra, in exercise of powers conferred by sub-section (1) of section 20 E of the Railway Act, 1989.
Extract:
execution, maintenance, management and operation of Special Railway Project,
namely “Borivali Virar - 5th & 6th Railway Line Project” in the district of Palghar in the State...acquired, with or without structures, falling within the Special Railway Project
"Borivali Virar 5th & 6th Railway Line” in Village Diwanman and Navghar in Vasai Taluka
Wednesday, December 17, 2025
Ministry of Railways
Publication of notification of extraordinary gazette under Part 2 section 3 Sub Section 1 Notification under clause 20 A of the Railway Act 1989 for land to be acquired in connection with Special Railway Project, fifth and sixth line between Borivali Virar on Western Railway, under MUTP III A projects in Thane Taluka, District Thane in the State of Maharashtra.
The Central Government declares its intention to acquire land for the 5th & 6th line between Borivali -Virar on Western Railway under Section 20A of the Railways Act, 1989.
Extract:
execution of the Special Railway Project, namely, 5th & 6th line between Borivali -Virar on Western Railway, under MUTP IIIA in District Thane in the State...structure, for the Special Railway Project, namely, 5th & 6th line between Borivali -Virar on Western Railway, under MUTP IIIA projects in Thane Taluka, District Thane
Thursday, September 18, 2025
Ministry of Railways
Publication of notification of extraordinary gazette under Part II section 3 Sub Section (II) Notification under clause 20E of the Railway Act 1989 (24 of 1989) for Land to be acquired in connection with Special Railway Project, namely 5th and 6th line between Borivali Virar on Western Railway, under MUTP IIIA projects in Thane Taluka, Village Bhayander in the State of Maharashtra
The Central Government declares the acquisition of specified lands in Bhayander Village, Thane district, Maharashtra, for the 5th and 6th line Special Railway Project between Borivali and Virar on Western Railway, vesting them absolutely in the Central Government.
Extract:
operation of
Special Railway Project, namely 5th & 6th line between Borivali -Virar on Western Railway, under MUTP IIIA
in the district of Thane...falling within the Special Railway
Project namely, 5th & 6th line between Borivali -Virar on Western Railway, under MUTP IIIA projects in
Thane Taluka, Village Bhayander
Friday, June 20, 2025
Ministry of Railways
Publication of notification of extraordinary Gazette under section 20A Part (II) section 3 Sub section ii of Railway Act 1989 The Railway Amendment Act 2008 for the Special Railway Project Namely 5th and 6th Line between Borivali Virar on Western Railway under MUTP IIIA Projects in Thane Taluka District Thane in the State of Maharashtra
The Central Government declares its intention to acquire land for the 5th and 6th railway lines between Borivali and Virar on Western Railway under Section 20A of the Railways Act, 1989.
Extract:
execution of the Special Railway Project, namely, 5th &
6th line between Borivali -Virar on Western Railway, under MUTP IIIA in District Thane in the State...structure, for the Special Railway Project,
namely, 5th & 6th line between Borivali -Virar on Western Railway, under MUTP IIIA projects in Thane
Taluka, District Thane
Tuesday, June 17, 2025
Ministry of Railways
Publication of notification under 7A under Railway Act 1989 (The Railway Amendment Act 2008) for the Special Railway Project Namely Quadrupling of Virar Dahanu Corridor on Western Railway of MUTP III Projects in Palghar Taluka District Palghar in the State of Maharashtra
The Central Government declares the acquisition and vesting of specific land in Palghar District, Maharashtra, for the Quadrupling of the Virar-Dahanu Corridor on Western Railway, a Special Railway Project under MUTP III.
Extract:
maintenance, management
and operation of a Special Railway Project namely, Quadrupling of Virar-Dahanu Corridor on Western Railway, of
MUTP III Projects in the district...with or without structure, for the special Railway Project, namely,
Quadrupling of Virar – Dahanu Corridor on Western Railway, of MUTP-III Projects in Palghar Taluka
Wednesday, April 23, 2025
Ministry of Railways
Special Railway Project, namely 5th 6th line between Borivali Virar on Western Railway under MUTP 3 in the district of Palghar in the State of Maharashtra
The Central Government declares the acquisition of land in Palghar district, Maharashtra, for the Western Railway's 5th and 6th line project between Borivali and Virar.
Extract:
operation of
Special Railway Project, namely 5th & 6th line between Borivali -Virar on Western Railway, under MUTP IIIA in
the district of Palghar...falling within the Special Railway
Project namely, 5th & 6th line between Borivali -Virar on Western Railway, under MUTP IIIA projects in
Vasai Taluka, Village Umelman
Thursday, January 09, 2025
Ministry of Railways
Special Railway Project, namely, Quadrupling of Virar Dahanu corridor on Western Railway, of MUTP III projects in District Palghar in the State of Maharashtra
Declares intention to acquire land in Palghar, Maharashtra for the Virar-Dahanu railway line quadrupling project under the Railway Act, 1989.
Extract:
required for execution of the Special Railway Project,
namely, Quadrupling of Virar-Dahanu corridor on Western Railway, of MUTP III projects in District Palghar...with or without structure, for the Special Railway Project, namely,
Quadrupling of Virar-Dahanu corridor on Western Railway, of MUTP III projects in Palghar, Taluka
Friday, January 03, 2025
Ministry of Railways
Notification under Section 20A of the Railway Act, 1989 (24 of 1989) in connection with 5th and 6th line between Borivali Virar corridor on Western Railway,in District Palghar in the State of Maharashtra.
Declares intention to acquire land in Palghar district, Maharashtra for the 5th and 6th railway lines between Borivali-Virar under MUTP IIIA project.
Extract:
execution of the Special Railway Project, namely, 5th &
6th line between Borivali -Virar on Western Railway, under MUTP IIIA in District Palghar in the State...structure, for the Special Railway Project, namely,
5th & 6th line between Borivali -Virar on Western Railway, under MUTP IIIA projects in Vasai Taluka,
District Palghar
Tuesday, December 31, 2024
Ministry of Railways
Published with 4 days delay4d
Notification under Section 20A of the Railway Act, 1989 (24 of 1989) in connection with Quadrupling of Virar Dahanu corridor on Western Railway, of MUTP III projects in District Palghar in the State of Maharashtra.
Notification under section 20E of the Railways Act, 1989 declaring final acquisition and vesting of land for the Quadrupling of the Virar-Dahanu Corridor (MUTP III) on Western Railway in Palghar district, Maharashtra.
Extract:
maintenance,
management and operation of a Special Railway Project namely, Quadrupling of Virar -Dahanu Corridor on Wester n
Railway, of MUTP III Projects...without structure, for the Special Railway Project,
name ly, Quadrupling of Virar -Dahanu Corridor on Western Railway, of MUTP III Proj ects in Palghar Taluka
Monday, November 04, 2024
Ministry of Railways
20A Notification for Quadrupling of Virar Dahanu corridor on Western Railway, of MUTP projects in District Palghar in the State of Maharashtra
Declaration of intention under section 20A of the Railways Act, 1989 to acquire land in Pale village, Dahanu taluka, Palghar district, Maharashtra for the MUTP III Quadrupling of the Virar-Dahanu corridor on Western Railway.
Extract:
required for execution of the Special Railway Project, namely,
Quadrupling of Virar-Dahanu corridor on Western Railway, of MUTP III projects in District Palghar...with or without structure, for the Special Railway Project, namely,
Quadrupling of Virar-Dahanu corridor on Western Railway, of MUTP III projects in Dahanu Taluka
Ministry of Railways
Notification under Section 20A of the Railway Act, 1989 in connection with Quadrupling of Virar Dahanu corridor on Western Railway, projects in District Palghar in the State of Maharashtra.
Notification under sub-section (1) of section 20A of the Railways Act, 1989, declaring the Central Government's intention to acquire land in Palghar district, Maharashtra, for the Special Railway Project to quadruple the Virar-Dahanu corridor on Western Railway under MUTP III.
Extract:
required for execution of the Special Railway Project, namely,
Quadrupling of Virar-Dahanu corridor on Western Railway, of MUTP III projects in District Palghar...with or without structure, for the Special Railway Project, namely,
Quadrupling of Virar-Dahanu corridor on Western Railway, of MUTP III projects in Palghar Taluka
Thursday, October 10, 2024
Ministry of Railways
Notification under Section 20E of the Railway Act 1989 in connection with 3rd and 4th th Railway Line Between Virar Dahanu Road in Palghar District Under MUTP in Maharashtra State
Final declaration under Section 20E of the Railways Act, 1989 vesting land in the Central Government for the Quadrupling of Virar-Dahanu Road Corridor Special Railway Project (MUTP III) in Palghar district, Maharashtra.
Extract:
maintenance, management and operation of a Special Railway Project namely, Quadrupling of Virar-Dahanu Road
Corridor on Western Railway, of MUTP III Projects...with or without structure, for the Special Railway Project,
namely, Quadrupling of Virar-Dahanu Road Corridor on Western Railway, of MUTP III Projects in Palghar
Thursday, October 03, 2024
Ministry of Railways
publication of extraordinary gazette under PART II Section 3 Subsection Amendment to Notification under Section 20E of the Railway Act, 1989 (24 of 1989) in connection with 5th 6th Railway Line Between Borivali Virar in Palghar District.
Notification declaring acquisition of land in Palghar District, Maharashtra, for the Special Railway Project 'Borivali Virar Western Railway 5th & 6th line', and vesting that land absolutely in the Central Government, under sub-section (1) and (2) of Section 20E of the Railway Act, 1989.
Extract:
execution, maintenance, management and operation of Special Railway Project, namely “Borivali Virar Western Railway 5th & 6th line in the district of Palghar in the State...acquired, with or without structures, falling within the Special Railway Project "Borivali Virar Western Railway 5th & 6th line in Village Navghar in Vasai Taluka
Saturday, July 27, 2024
Ministry of Railways
publication of extraordinary gazette under PART II Section 3 Sub Section Amendment to Notification under Section 20E of the Railway Act, 1989 in connection with 5th and 6th Railway Line Between Borivali Virar in Palghar District
Corrigendum notification declaring final acquisition and vesting of land in Palghar district, Maharashtra, for the Special Railway Project 'Borivali Virar Western Railway 5th & 6th line', superseding an earlier notification's schedule, under Section 20E of the Railway Act, 1989.
Extract:
execution, maintenance, management and operation of Special Railway Project, namely “Borivali Virar Western Railway 5th & 6th line in the district of Palghar in the State...acquired, with or without structures, falling within the Special Railway Project “Borivali Virar Western Railway 5th & 6th line in 5 villages in Vasai Taluka under
Wednesday, July 03, 2024
Ministry of Railways
20A notification of the Land to be acquired in connection with land acquisition in Taluka Vasai District Palghar for the Quadrupling of Virar Dahanu road Corridor on Western Railway
Final declaration under sub-section (2) of section 20E of the Railways Act, 1989 vesting acquired land absolutely in the Central Government for the Special Railway Project quadrupling the Virar-Dahanu Corridor (MUTP III) in Palghar district, Maharashtra.
Extract:
maintenance, management and operation of a Special Railway Project namely, Quadrupling of Virar-Dahanu Corridor
on Western Railway, of MUTP III Projects in the district...with or without structure, for the Special Railway Project, namely,
Quadrupling of Virar-Dahanu road Corridor on Western Railway, of MUTP III Projects in Vasai
Wednesday, April 10, 2024
Ministry of Railways
Publication of 20A notification of the Land to be acquired in connection with land acquisition in Taluka Vasai District Palghar for the Construction of 5th 6th Line in Between Virar
Notification under Section 20A of the Railways Act, 1989 declaring intention to acquire land in Palghar District, Maharashtra for the Virar-Dahanu corridor quadrupling railway project.
Extract:
required for execution of the Special Railway Project, namely, Quadrupling of Virar-Dahanu corridor on Western Railway, of MUTP III projects in District Palghar...with or without structure, for the Special Railway Project, namely, Quadrupling of Virar-Dahanu corridor on Western Railway, of MUTP III projects in Vasai Taluka
Friday, February 16, 2024
Ministry of Railways
Publication of extraordinary gazette under PART II Section 3 SubSection ii Notification under Section 20A of the Railway Act, 1989 (24 of 1989) in connection with Quadrupling of Virar Dahanu Road Project of Palghar District.
Notification under sub-section (1) of section 20A of the Railways Act, 1989 (as amended by the Railway (Amendment) Act, 2008) declaring the Central Government's intention to acquire land for the Special Railway Project of quadrupling the Virar-Dahanu corridor (MUTP III) in Palghar district, Maharashtra.
Extract:
required for execution of the Special Railway Project, namely,
Quadrupling of Virar-Dahanu corridor on Western Railway, of MUTP III projects in District Palghar...with or without structure, for the Special Railway Project, namely,
Quadrupling of Virar-Dahanu corridor on Western Railway, of MUTP III projects (For Palghar Taluka